Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.Amelia uses 2 kg of flour to bake 5 cakes. Using the same recipe, work out how many cakes she can bake with 6 kg of flour.
- 2.A tank is filled at a rate of 3 litres every 2 minutes. Given that 1 litre = 1000 cm³, work out the flow rate in cm³ per minute.
- 3.Maya is paid £105.30 for working 9 hours. Work out her rate of pay, in £ per hour.
- 4.Two hikers' journeys are shown on separate distance-time graphs. Hiker A's graph has gradient 4.5 km/h. Hiker B's graph has gradient 3.2 km/h. Work out how much faster Hiker A walks than Hiker B, in km/h.
- 5.A vehicle is worth £18000. Its value decreases by 15% each year. Using the recurrence V_{n+1} = 0.85V_n, with V_0 = 18000, find the first whole number of years after which the vehicle's value drops below £10000.
- 6.Two mathematically similar rectangles have lengths in the ratio 3 : 5. The area of the smaller rectangle is 27 cm². Work out the area of the larger rectangle.
- 7.A charity shop and a school share collection-box money in the ratio 5 : 8. The charity shop receives £47.50. Work out how much the school receives.
- 8.Two mathematically similar logos are printed on a poster. They have areas 20 cm² and 45 cm². Nadia says that the length scale factor from the smaller logo to the larger logo is 45 ÷ 20 = 2.25. Give a reason why Nadia is incorrect, and work out the correct length scale factor.
- 9.Write 400 g : 1.5 kg as a ratio in its simplest form.
- 10.y is directly proportional to x. When x = 4, y = 10. Work out the value of y when x = 6.
- 11.The number of subscribers to a streaming app, in thousands, is plotted against time, in months since launch. A tangent to the graph at t = 6 months has gradient 4.8. A tangent at t = 18 months has gradient 1.1. A manager claims the app is growing faster at 18 months than it was at 6 months. Work out how the growth rate has changed, and decide whether the manager is correct.
- 12.A factory machine produces bottles at a constant rate. In 45 minutes it produces 810 bottles. The factory needs 2,160 bottles for an order. Working at the same rate, work out how many minutes it will take to produce the order.
- 13.A charity receives £360 in donations in January and £480 in donations in February. Write the amount received in January as a fraction of the amount received in February, giving your answer in its simplest form.
- 14.A post 2 metres tall casts a shadow 3 metres long. At the same time a nearby tree casts a shadow 12 metres long. Work out the height of the tree.
- 15.y is directly proportional to x. When x = 5, y = 18. Work out the value of y when x = 15.
Answer key
- (c) 15 — Method: the number of cakes is in direct proportion to the mass of flour, so find the multiplier between the two masses and apply it to the number of cakes. Working: 6 ÷ 2 = 3, so there is three times as much flour, and 5 × 3 = 15. Answer: 15. The distractors: 10 comes from multiplying the 5 cakes by 2, the mass in the recipe, instead of by the multiplier 3; 20 comes from multiplying by the difference 6 − 2 = 4, treating a proportion problem as a difference problem; 12 comes from rounding 5 ÷ 2 down to 2 cakes per kilogram and working out 6 × 2.
- (b) 1500 — The rate is 3 ÷ 2 = 1.5 litres per minute. Converting to cm³: 1.5 × 1000 = 1500 cm³ per minute. Getting 3000 comes from converting 3 litres to cm³ first (3000 cm³) and forgetting to divide by the 2 minutes. Getting 750 comes from dividing by the 2 minutes a second time after converting (1500 ÷ 2). Getting 2000 comes from converting the 2 minutes as if it were litres (2 × 1000) instead of using the correct rate of 1.5 litres per minute.
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (a) 1.3 — The gradient of a distance-time graph gives the speed. Difference in speed = 4.5 − 3.2 = 1.3 km/h. A student who subtracts the speeds the wrong way round, 3.2 − 4.5, gets −1.3. A student who adds the two speeds instead of comparing them gets 7.7. A student who multiplies the two gradients gets 14.4.
- (d) 4 years — Apply the recurrence repeatedly. V_1 = 0.85 × 18000 = 15300. V_2 = 0.85 × 15300 = 13005. V_3 = 0.85 × 13005 = 11054.25. V_4 = 0.85 × 11054.25 = 9396.1125. V_3 = £11054.25 is still above £10000, but V_4 = £9396.11 has dropped below it, so the answer is 4 years. Stopping at V_3 and calling it '3 years' misreads £11054.25 as already below £10000, or comes from wrongly modelling the fall as a flat £2700 a year (15% of the original value each time, without compounding), which crosses £10000 a year too early. Continuing one extra step to V_5 = 0.85 × 9396.1125 = 7986.70 and calling it '5 years' overshoots, since the value had already dropped below £10000 at V_4. Doubling the percentage decrease to 30% by mistake gives V_1 = 0.7 × 18000 = 12600, then V_2 = 0.7 × 12600 = 8820, which is already below £10000 after only 2 years — the wrong rate crosses the threshold too fast.
- (b) 75 cm² — Areas of similar shapes are in the ratio of the squares of their lengths. Squaring both parts of 3 : 5 gives an area ratio of 9 : 25, so the larger area is 25/9 of the smaller one. Working with the smaller area: 27 ÷ 9 = 3, and 3 × 25 = 75. The area of the larger rectangle is 75 cm².
- (b) £76.00 — One part of the ratio is £47.50 ÷ 5 = £9.50. The school receives 8 parts, so its share is 9.50 × 8 = £76.00. Dividing £47.50 by 8 instead of 5, treating the charity's amount as if it were 8 parts, gives 47.50 ÷ 8 = 5.9375, then × 5 = £29.69. Adding the charity's amount to the school's amount instead of stopping at the school's own share gives the total collected, 9.50 × 13 = £123.50. Adding one part to the charity's amount instead of multiplying one part by 8 gives 47.50 + 9.50 = £57.00.
- (d) 1.5 — Method: the length scale factor is the square root of the area scale factor, not the area scale factor itself. Working: the area scale factor is 45 ÷ 20 = 2.25, and the square root of 2.25 is 1.5. Answer: 1.5. Nadia's answer, 2.25, is the AREA scale factor — she never took the square root to get back to the length scale factor. 4.5 comes from doubling the area scale factor instead of taking its square root. 0.67 comes from taking the square root in the wrong direction, finding the scale factor from the larger rug to the smaller rug instead of the other way round.
- (a) 4 : 15 — Convert to the same unit first: 1.5 kg = 1500 g, since 1 kg = 1000 g. This gives the ratio 400 : 1500. Divide both parts by their highest common factor, 100, to get 4 : 15. Giving 40 : 150 divides by 10 only, which is not the highest common factor, so it is not fully simplified. Giving 15 : 4 swaps the order. Giving 4 : 1.5 has not converted 1.5 kg into grams, so the two parts are not measured in the same unit.
- (b) 15 — Find the multiplier connecting y to x: 10 ÷ 4 = 2.5. Then apply it to the new value of x: 2.5 × 6 = 15. Working out 10 + (6 − 4) = 12 adds the change in x straight onto y instead of scaling proportionally. Working out 10 × 6 = 60 multiplies the given y-value by the new x-value directly, without finding the multiplier first. Writing 10 keeps y the same as before, not realising it must change with x. When x = 6, y = 15.
- (b) No — rate fell by 3.7 thousand/month — Each tangent gradient is the instantaneous growth rate, in thousand subscribers per month. To compare them, subtract the later rate from the earlier one: 4.8 − 1.1 = 3.7. Since 1.1 is less than 4.8, the growth rate has fallen by 3.7 thousand subscribers per month, so the manager is wrong — the app is growing more slowly at 18 months, not faster. Subtracting the other way round and calling the result a rise, 'rate rose by 3.7 thousand/month', gets the direction backwards: the later gradient is the smaller of the two. Adding the two gradients, 4.8 + 1.1 = 5.9, and calling this a combined rate that shows speeding up, is the wrong operation for comparing two rates. Treating the difference 3.7 as a total number of subscribers lost, rather than a rate in thousands per month, confuses a rate with a count. Always subtract the two rates in a sensible order and keep the units in thousands per month.
- (b) 120 minutes — Method: find the rate in bottles per minute, then divide the order size by the rate. Working: rate = 810 ÷ 45 = 18 bottles per minute. Time = 2,160 ÷ 18 = 120 minutes. Wrong options: 1,350 minutes comes from subtracting 810 from 2,160 instead of using the rate; 48 minutes comes from dividing the order size by the original time (2,160 ÷ 45) instead of the rate; 108 minutes comes from rounding the rate to 20 bottles per minute before dividing.
- (a) 3/4 — Write January's total over February's total: 360/480. Both numbers share a factor of 120, so dividing top and bottom by 120 gives 3/4. Choosing 4/3 comes from writing February's amount over January's amount, the wrong way round. Choosing 1/4 comes from finding the difference between the two months (480 − 360 = 120) and writing it over February's amount, instead of using January's amount. Choosing 3/7 comes from writing January's amount over the total received across both months (360 out of 840), instead of over February's amount alone.
- (c) 8 m — Method: in the same sunlight every object has its height and its shadow in the same ratio, so write 2:3 = h:12, find the multiplier that takes 3 to 12 and apply it to the height. Working: 12 ÷ 3 = 4, so the tree's shadow is 4 times the post's shadow; the height must be scaled by the same 4, giving 4 × 2 = 8 m. Answer: 8 m. The distractors: 18 m comes from setting up the proportion upside down, 12 ÷ 2 × 3, which scales by shadow over height instead of height over shadow; 24 m comes from multiplying the 12 m shadow by the post's height of 2 m and never dividing by the post's shadow of 3 m; 4 m is the scale factor 12 ÷ 3, given as a length instead of being used to scale the 2 m post.
- (c) 54 — Method: y = kx, so k = y ÷ x. Working: k = 18 ÷ 5 = 3.6. At x = 15: y = 3.6 × 15 = 54. Wrong options: 28 comes from adding the change in x (10) onto y instead of scaling; 6 comes from treating the relationship as inverse proportion (k = 5 × 18 = 90, then y = 90 ÷ 15 = 6); 60 comes from rounding the constant up to 4 instead of using 3.6.
Build your own mix at the worksheet builder.