Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The number of subscribers to a streaming app, in thousands, is plotted against time, in months since launch. A tangent to the graph at t = 6 months has gradient 4.8. A tangent at t = 18 months has gradient 1.1. A manager claims the app is growing faster at 18 months than it was at 6 months. Work out how the growth rate has changed, and decide whether the manager is correct.
- 2.A map has a scale of 1 : 20 000. A different map of the same area has a scale of 1 : 80 000. A lake's shoreline is drawn 5 cm long on the first map. Work out the length of the same shoreline on the second map, in centimetres.
- 3.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 4.The price of a share falls by 10% on Monday and then rises by 10% on Tuesday. Work out the overall percentage change from Monday's starting price.
- 5.The ratio of cats to dogs in a shelter is 3:4. There are 18 cats. Work out the total number of animals in the shelter.
- 6.A shop sells ribbon by the metre. 2 m costs £3.00, 4 m costs £6.00, and 7 m costs £10.50. Does this data show that the cost is directly proportional to the length of ribbon bought? Choose the correct verdict and reason.
- 7.A loan of £3000 has interest added at 2% each month, and then a fixed repayment of £200 is made. This is modelled by the recurrence B_{n+1} = 1.02B_n − 200, where B_n is the balance after n months and B_0 = 3000. Work out the balance after 2 months.
- 8.A map has a scale of 1:25000. A road on the map is 6 cm long. Work out the real-life length of the road, giving your answer in kilometres.
- 9.Two mathematically similar cylinders have volumes 64 cm³ and 216 cm³. Work out the ratio of the height of the smaller cylinder to the height of the larger cylinder, in simplest form.
- 10.Maya is paid £105.30 for working 9 hours. Work out her rate of pay, in £ per hour.
- 11.Jamal invests £600 in a savings account paying 3% simple interest per year. Work out the total amount in the account after 4 years.
- 12.A runner's speed is 8 m/s. Given that there are 3600 seconds in an hour and 1000 metres in a kilometre, work out the runner's speed in km/h.
- 13.Triangle ABC is mathematically similar to triangle PQR, with AB corresponding to PQ and BC corresponding to QR. AB = 6 cm, BC = 8 cm and PQ = 12 cm. Work out the length of QR.
- 14.Write 250 g : 2 kg as a ratio in its simplest form.
- 15.A cyclist rides at a steady speed of 20 mph. Given that 1 mile ≈ 1.6 km, work out the cyclist's speed in km/h.
Answer key
- (b) No — rate fell by 3.7 thousand/month — Each tangent gradient is the instantaneous growth rate, in thousand subscribers per month. To compare them, subtract the later rate from the earlier one: 4.8 − 1.1 = 3.7. Since 1.1 is less than 4.8, the growth rate has fallen by 3.7 thousand subscribers per month, so the manager is wrong — the app is growing more slowly at 18 months, not faster. Subtracting the other way round and calling the result a rise, 'rate rose by 3.7 thousand/month', gets the direction backwards: the later gradient is the smaller of the two. Adding the two gradients, 4.8 + 1.1 = 5.9, and calling this a combined rate that shows speeding up, is the wrong operation for comparing two rates. Treating the difference 3.7 as a total number of subscribers lost, rather than a rate in thousands per month, confuses a rate with a count. Always subtract the two rates in a sensible order and keep the units in thousands per month.
- (c) 1.25 cm — Method: find the real length using the first map's scale, then use the second map's scale to find its drawn length. Working: real length = 5 × 20 000 = 100 000 cm. On the second map: 100 000 ÷ 80 000 = 1.25 cm. Wrong options: 20 cm comes from inverting the ratio of the two scales (5 × 80 000 ÷ 20 000); 5 cm comes from wrongly assuming the length looks the same on both maps; 12.5 cm comes from dropping a zero from the second scale factor and dividing by 8 000 instead of 80 000 (100 000 ÷ 8 000).
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (b) −1% — Method: write each change as a multiplier and multiply them. A 10% fall is × 0.9 and a 10% rise is × 1.1. Working: 0.9 × 1.1 = 0.99, so the final price is 99% of the original, which is 1% less. Answer: an overall change of −1%. The distractors: 0% comes from assuming a 10% fall and a 10% rise cancel — they do not, because the rise is 10% of a smaller amount; +1% has the size right but the sign wrong, from reading the multiplier 0.99 as 1% above 1 instead of 1% below it; −2% comes from finding the 1% fall and then counting it once for each of the two changes.
- (a) 42 — Find the value of one part: 18 ÷ 3 = 6. Find the number of dogs: 4 × 6 = 24. Add the cats and the dogs to find the total: 18 + 24 = 42. (24 is the number of dogs only, not the total number of animals. 126 comes from multiplying the number of cats by the total number of parts, 18 × 7, instead of finding one part first. 25 comes from adding the ratio numbers 3 and 4 directly to the number of cats.)
- (a) Yes — the cost per metre is £1.50 each time — Direct proportion holds if the cost per metre is the same every time. Check each pair: 3.00 ÷ 2 = 1.50, 6.00 ÷ 4 = 1.50, and 10.50 ÷ 7 = 1.50. All three give the same rate, £1.50 per metre, so the data does show direct proportion. Saying only that the cost increases as the length increases is not enough on its own — many non-proportional relationships also increase, so this reason does not prove proportion. Misreading 10.50 ÷ 7 as 1.05 by misplacing the decimal point gives a false mismatch that is not actually there. Requiring every length to be a double of another confuses a special case (doubling) with the general test, which is that the rate itself stays constant. The data does show direct proportion, at £1.50 per metre.
- (c) £2717.20 — The recurrence B_{n+1} = 1.02B_n − 200 must be applied once for each month, using the previous month's balance each time. Starting from B_0 = 3000: 3000 × 1.02 = 3060, so B_1 = 3060 − 200 = 2860. Then 2860 × 1.02 = 2917.2, so B_2 = 2917.2 − 200 = 2717.2. Stopping after one month leaves B_1 = £2860.00, not the balance after two months. Applying two months of interest together, 1.02² = 1.0404, and 3000 × 1.0404 = 3121.2, and then subtracting 400 in one go, 3121.2 − 400 = 2721.2, does not reproduce the recurrence, because the second month's interest should be earned on the balance after the first repayment, not on the original £3000. Subtracting £200 twice from B_1 without adding a second month of interest, 2860 − 200 = 2660, drops the interest for the second month altogether. The balance after 2 months is £2717.20.
- (b) 1.5 km — Multiply the map length by the scale factor: 6 × 25000 = 150000 cm. Convert to kilometres, using 100 cm = 1 m and 1000 m = 1 km, so 100000 cm = 1 km: 150000 ÷ 100000 = 1.5 km. (1500 km comes from converting only as far as metres, 150000 ÷ 100 = 1500 m, and then writing kilometres on the end. 15 km comes from dividing by 10000 instead of 100000. 0.15 km comes from dividing by 1000000 instead of 100000.)
- (a) 2 : 3 — Simplify the volume ratio first: 64 : 216 divides by 8 to give 8 : 27. Volumes scale with the cube of the height ratio, so take the cube root of each part: the cube root of 8 is 2, and the cube root of 27 is 3, giving a height ratio of 2 : 3. Giving 3 : 2 has the ratio the right way round for larger to smaller, not smaller to larger. Giving 8 : 27 is the simplified volume ratio, without cube-rooting it. Giving 64 : 216 is the volume ratio before it has even been simplified.
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (c) £672 — Simple interest per year = 3% of £600 = £18. Over 4 years the interest is 18 × 4 = £72. Total in the account = £600 + £72 = £672. A student who gives just the interest, without adding it to the principal, writes £72. A student who adds only one year's interest instead of four gets £600 + £18 = £618. A student who wrongly compounds the interest each year gets 600 × 1.03⁴ = £675.31.
- (a) 28.8 km/h — Method: first change metres per second into metres per hour, then change metres into kilometres. Working: 8 × 3600 = 28800 metres per hour, then 28800 ÷ 1000 = 28.8 km/h. So the runner's speed is 28.8 km/h. Distractor 28800 km/h comes from stopping after the first step and forgetting to change metres into kilometres. Distractor 2.22 km/h comes from dividing by 3600 instead of multiplying, then multiplying by 1000. Distractor 2.88 km/h comes from using 360 instead of 3600 seconds in an hour, missing a zero.
- (c) 16 cm — Corresponding sides of similar triangles are all in the same ratio. Use the pair whose lengths are both known: the scale factor from triangle ABC to triangle PQR is 12 ÷ 6 = 2. Since QR corresponds to BC, multiply BC by that scale factor: 8 × 2 = 16, so QR = 16 cm.
- (a) 1:8 — Convert 2 kg to grams: 2 kg = 2000 g. The ratio is 250 : 2000. The highest common factor of 250 and 2000 is 250. Divide both parts by 250: 250 ÷ 250 = 1 and 2000 ÷ 250 = 8, so the ratio is 1 : 8. Leaving the kilograms unconverted gives 250 : 2, which simplifies to 125 : 1 — the units on each side are different, so this does not compare like with like. Dividing by 50 instead of 250 gives 5 : 40, which still shares a common factor of 5, so it is not fully simplified. Swapping the order gives 8 : 1, grams to kilograms the wrong way round.
- (c) 32 km/h — Method: to change mph into km/h, multiply by the number of kilometres in a mile. Working: 20 × 1.6 = 32 km/h. So the cyclist's speed is 32 km/h. Distractor 12.5 km/h comes from dividing by 1.6 instead of multiplying. Distractor 21.6 km/h comes from adding 1.6 instead of multiplying by it. Distractor 20 km/h comes from not converting the units at all.
Build your own mix at the worksheet builder.