Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The cost, in pounds, of hiring a minibus is modelled against the number of passengers booked. A tangent to the cost graph at 20 passengers passes through the points (16, 184) and (24, 216). Work out the instantaneous rate at which the cost increases with each extra passenger, at 20 passengers.
- 2.A car travels for 3 hours at an average speed of 80 km/h and then for 1 hour at an average speed of 40 km/h. Work out the average speed for the whole journey.
- 3.Tap A fills a swimming pool in 6 hours. Tap B pours water twice as fast as tap A. The time taken to fill the pool is inversely proportional to the rate of flow. Work out how long tap B takes to fill the pool.
- 4.A smoothie recipe combines 350 cm³ of mango juice with 650 cm³ of orange juice. Work out the total volume of the smoothie in litres.
- 5.A savings account starts with £500. Each year, 4% interest is added, and then £30 is withdrawn from the account. Which recurrence correctly models the balance, £S_n, after n years, with S_0 = 500?
- 6.A company's turnover this year is £180,000. Last year's turnover was £120,000. Write down this year's turnover as a percentage of last year's turnover.
- 7.A shop's profit, P pounds, is in direct proportion to the number of items sold, n. When 15 items are sold, the profit is £45. Write down the ratio n : P in its simplest form for this shop.
- 8.A charity fun run raises money through entry fees and donations. Entry fees raise £1,260, which is 60% of the total amount raised. Work out how much money was raised through donations.
- 9.A jumper normally costs £45. In a sale it is reduced by 20%. Work out the sale price, then write the sale price as a fraction of the normal price. Give your answer in its simplest form.
- 10.Two quantities x and y are in direct proportion. When x = 8, the value of y is 20. Work out the value of y when x = 14.
- 11.Two cars leave the same point at the same time and travel in opposite directions. One travels at 80 km/h and the other at 60 km/h. Work out how long it takes until the cars are 350 km apart.
- 12.A furniture maker builds two mathematically similar bookcases. The smaller bookcase is 40 cm tall and uses 2 m² of wood. The larger bookcase is 60 cm tall. Work out the area of wood needed for the larger bookcase, giving your answer in m².
- 13.The height of a candle, in cm, is measured as it burns: t = 0 min, height = 20.0; t = 3 min, height = 18.7; t = 5 min, height = 17.5; t = 6 min, height = 16.6; t = 7 min, height = 15.4; t = 9 min, height = 13.4. Which pair of readings gives the best estimate of the instantaneous rate of change of the height at t = 6 minutes, and why?
- 14.A scale model of a bridge is built at a scale of 1 : 120. The real bridge is 84 m long. Work out the length of the model, in centimetres.
- 15.An amount of money is shared in the ratio 1:2:3. The largest share is £90 more than the smallest share. Work out the total amount that was shared.
Answer key
- (d) £4 — The gradient of the tangent gives the instantaneous rate of change of cost with respect to the number of passengers, in pounds per passenger. The tangent passes through (16, 184) and (24, 216), so the change in cost is 216 − 184 = 32 and the change in passengers is 24 − 16 = 8. The gradient is 32 ÷ 8 = 4. Stopping after finding the change in cost, without dividing by the change in passengers, leaves 32, not a rate. Adding the two changes instead of dividing gives 32 + 8 = 40, which is not a rate either. Reading off only the change in passengers, 8, is not a rate at all — a rate needs the change in cost as well. The instantaneous rate is £4 per extra passenger.
- (a) 70 km/h — Method: average speed for a whole journey is the total distance divided by the total time, not the mean of the separate speeds. Working: 3 × 80 = 240 km and 1 × 40 = 40 km, giving 280 km in 3 + 1 = 4 hours, so 280 ÷ 4 = 70. Answer: 70 km/h. The distractors: 60 km/h comes from taking the mean of 80 and 40, which would only be right if equal times were spent at each speed; 280 km/h is the total distance written with a speed unit, from forgetting to divide by the total time; 80 km/h comes from quoting the speed of the longer leg as the average for the whole journey.
- (a) 3 hours — Method: for a fixed pool the rate of flow multiplied by the time taken is constant, so multiplying the rate by a factor divides the time by that same factor. Working: tap B's rate is 2 times tap A's rate, so tap B's time is 6 ÷ 2 = 3 hours. Answer: 3 hours. The distractors: 12 hours comes from multiplying the time by 2 as well, which treats the time as directly proportional to the rate and has the faster tap taking longer; 4 hours comes from reading ‘twice as fast’ additively, as two hours quicker, and working out 6 − 2 instead of scaling the time by a factor of 2; 1.5 hours comes from applying the factor of 2 twice, halving 6 to 3 and then halving again.
- (b) 1.00 litres — Total volume = 350 + 650 = 1000 cm³. Since 1000 cm³ = 1 litre, the smoothie is 1.00 litre. Using only the orange juice's 650 cm³ and converting that gives 0.65 litres, forgetting the mango juice entirely. Using only the mango juice's 350 cm³ gives 0.35 litres, forgetting the orange juice. Adding both volumes correctly to get 1000 cm³ but not converting to litres leaves the answer as 1000.00, which is the volume in the wrong unit.
- (a) S_{n+1} = 1.04S_n − 30 — Adding 4% interest multiplies the balance by 1 + 0.04 = 1.04. Withdrawing £30 afterwards subtracts a fixed 30, giving S_{n+1} = 1.04S_n − 30. Writing +30 instead of −30 mistakes a withdrawal for a deposit — the £30 leaves the account, so it must be subtracted. Writing 0.96 instead of 1.04 treats the 4% as a decrease rather than an increase, as if the interest were shrinking the balance instead of growing it. Writing 1.4 instead of 1.04 turns 4% into 40%, a common slip when converting a percentage to a multiplier — 4% as a decimal is 0.04, so the multiplier is 1.04, not 1.4. Always convert the percentage to a decimal first, then add 1 for growth or subtract from 1 for decay, before applying any fixed amount that is added or removed.
- (c) 150% — Percentage = (180,000 ÷ 120,000) × 100 = 150%.
- (c) 1 : 3 — n : P = 15 : 45. Dividing both parts by their highest common factor, 15, gives 1 : 3. Inverting the ratio, 3 : 1, swaps profit and number of items. Dividing only the n-part by 15, getting 1, but leaving the P-part as 45 gives 1 : 45 — only one side has been simplified. Dividing only the P-part by 15, getting 3, but leaving the n-part as 15 gives 15 : 3, the opposite partial mistake.
- (c) £840 — Method: find the total amount raised using the reverse percentage, then subtract the entry fees to find the donations. Working: £1,260 is 60% of the total, so the total is £1,260 ÷ 0.6, and subtracting the entry fees from this total leaves £840 raised through donations. Answer: £840. £2,100 comes from correctly finding the total amount raised but then forgetting to subtract the entry fees, giving the total instead of the donations alone. £504 comes from working out 40% of the entry fees themselves, £1,260 × 0.4 = £504, instead of first finding the total amount raised. £1,890 comes from treating £1,260 as 40% of the total instead of 60%, dividing by 0.4 to get a total of £3,150, and then subtracting the entry fees from that incorrect total.
- (c) 4/5 — Find 20% of £45: 10% is £4.50, so 20% is £9. The sale price is £45 − £9 = £36. Form the fraction 36/45; both numbers share a factor of 9, so 36 ÷ 9 = 4 and 45 ÷ 9 = 5, giving 4/5. 1/5 comes from writing the discount itself as a fraction of the normal price (9/45), instead of the sale price. 6/5 comes from adding the 20% instead of subtracting it, giving a sale price of £54, then 54/45 = 6/5. 5/9 comes from treating 'reduced by 20%' as 'reduced by £20', giving a sale price of £25, then 25/45 = 5/9.
- (d) 35 — Method: in direct proportion the ratio y : x is the same for every pair, so find the constant and substitute the new value of x. Working: k = 20 ÷ 8 = 2.5, so y = 2.5x; when x = 14, y = 2.5 × 14 = 35. Answer: 35. The distractors: 26 comes from additive thinking — x rises by 6, so 6 is added to y — which would keep the difference constant rather than the ratio; 28 comes from rounding the constant 2.5 down to 2 and working out 2 × 14, which loses the half in the constant; 5.6 comes from using the constant upside down, 8 ÷ 20 = 0.4, and working out 0.4 × 14.
- (b) 2.5 hours — Method: when two objects move in opposite directions the gap between them grows at the sum of their speeds, so divide the required gap by that combined rate. Working: 80 + 60 = 140 km of gap each hour, and 350 ÷ 140 = 2.5. Answer: 2.5 hours. The distractors: 17.5 hours comes from subtracting the speeds, 80 − 60 = 20, which is the rate for two cars travelling in the same direction; 5 hours comes from using the mean of the two speeds, 70 km/h, instead of their sum; 4.375 hours comes from dividing 350 by 80 and ignoring the second car altogether.
- (b) 4.5 m² — The height ratio is 40 : 60, which simplifies to 2 : 3, so the larger bookcase is 1.5 times as tall as the smaller one. Areas scale with the square of the length scale factor, so the wood needed scales by 1.5² = 2.25. 2 × 2.25 = 4.5, so the larger bookcase needs 4.5 m² of wood. Giving 3 m² uses the length scale factor, 1.5, without squaring it (2 × 1.5 = 3). Giving 6.75 m² cubes the scale factor, 1.5³ = 3.375, as if wood coverage were a volume (2 × 3.375 = 6.75). Giving 2.25 m² is the squared scale factor on its own, without multiplying by the smaller bookcase's wood area of 2 m².
- (b) t = 5 and t = 7 (closest, evenly spaced) — To estimate the instantaneous rate of change at t = 6, use the chord centred on t = 6 with the closest readings on either side, t = 5 and t = 7. The gradient of this chord is 15.4 − 17.5 = −2.1, then −2.1 ÷ 2 = −1.05 cm per minute. The interval t = 3 to t = 9 is also centred on t = 6 but is wider: 13.4 − 18.7 = −5.3, then −5.3 ÷ 6 ≈ −0.88 cm per minute — this brings in more of the curve's own change in steepness, so it is a worse estimate of the rate at the single instant t = 6. Using t = 6 and t = 7 only gives 15.4 − 16.6 = −1.2, then −1.2 ÷ 1 = −1.2 cm per minute, but this is not centred on t = 6 — it estimates the rate over (6, 7), not at t = 6 itself. Using t = 0 and t = 6 gives 16.6 − 20.0 = −3.4, then −3.4 ÷ 6 ≈ −0.57 cm per minute, the average rate for the whole first six minutes, not the rate at the instant t = 6. Always choose the chord that brackets the point as closely as possible.
- (c) 70 cm — Method: convert the real length to centimetres, then divide by the scale factor. Working: 84 m = 8400 cm. 8400 ÷ 120 = 70 cm. Wrong options: 0.7 cm comes from dividing 84 by 120 without converting metres to centimetres; 1,008,000 cm comes from multiplying instead of dividing (8400 × 120); 7 cm comes from converting 84 m to 840 cm (using ×10 instead of ×100) before dividing.
- (d) £270 — Method: the £90 is a difference between two shares, so turn it into a number of parts before finding the value of one part. Working: the largest share is 3 parts and the smallest is 1 part, so the difference is 3 − 1 = 2 parts and 2 parts are worth £90; one part = £90 ÷ 2 = £45; the whole amount is 1 + 2 + 3 = 6 parts, so 6 × £45 = £270. Answer: £270. The distractors: £540 comes from treating the £90 as the value of one part and multiplying it by the 6 parts; £180 comes from finding the £45 correctly but adding only the 1-part and 3-part shares and forgetting the middle share; £135 comes from multiplying £45 by 3 and giving the largest share instead of the total.
Build your own mix at the worksheet builder.