Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 2.There are 400 students at a school. 25% of them have a brother, 40% have a sister and 15% have both a brother and a sister. Work out how many of the students have neither a brother nor a sister.
- 3.A shop sells fruit juice concentrate that must be diluted with water in the ratio 2 : 5 (concentrate : water) to make squash. Priya has 8 litres of concentrate. Work out how much water she needs to keep the same ratio.
- 4.6 identical taps fill a paddling pool in 20 minutes. Each tap fills at the same steady rate. Work out how long 3 of these taps would take to fill the same pool.
- 5.Two mathematically similar circles have radii 4 cm and 20 cm. Write the ratio of the area of the smaller circle to the area of the larger circle in its simplest form.
- 6.A fruit punch is made from orange juice, pineapple juice and lemonade in the ratio 5:3:2. A jug holds 3.5 litres of punch in total. Work out the volume of pineapple juice needed.
- 7.A fruit squash is made by mixing squash and water. In a jug, 2/9 of the total volume is squash. A caterer makes up 4.5 litres of the squash mixture. Work out how many litres of squash are in the mixture.
- 8.Two mathematically similar garden ponds have surface areas of 12 m² and 27 m². The fencing needed to go around the smaller pond costs £96. Assuming the cost of fencing is proportional to the perimeter of the pond, work out the cost of fencing the larger pond.
- 9.A pump fills a paddling pool at a rate of 130 litres per hour. Work out the rate in litres per minute, to 2 decimal places.
- 10.A straight-line graph shows the cost, C pounds, of hiring a bike for h hours. The line passes through the points (1, 12) and (4, 27). Which of these statements about the line is true?
- 11.A tangent to a distance–time graph, with distance in kilometres and time in minutes, has gradient 0.78 kilometres per minute at a particular point. Work out the instantaneous rate of change of distance with time, in kilometres per hour.
- 12.40% of a number is 12 more than 25% of the same number. Work out the number.
- 13.A cyclist rides at an average speed of 24 km/h for 1 hour 15 minutes. Work out the distance travelled, in km.
- 14.A photo is enlarged so that its new width is 1.4 times its original width. Write the multiplier that would scale the new width back down to the original width, as a fraction in its simplest form.
- 15.A cyclist travels d kilometres in t hours. Write down an expression, in terms of d and t, for the cyclist's average speed in km/h.
Answer key
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (c) 200 students — Method: find the percentage who have a brother or a sister, taking care that the students with both are not counted twice, then take that percentage from 100% and apply the result to the 400 students. Working: 25% + 40% = 65%, but the 15% with both has been counted in each of those figures, so 65% − 15% = 50% have a brother or a sister; that leaves 100% − 50% = 50%, and 50% of 400 = 200. Answer: 200 students. The distractors: 260 students is 65% of 400, the number with a brother or a sister when the 15% overlap is counted twice; 140 students comes from taking that same uncorrected 65% away from the 400; 300 students comes from subtracting only the 25% with a brother and ignoring the sisters altogether.
- (d) 20 litres — The ratio of concentrate to water is 2 : 5, so water = concentrate × 5 ÷ 2. 8 × 5 ÷ 2 = 20, so Priya needs 20 litres of water. Giving 40 litres multiplies by 5 but forgets to divide by 2 (8 × 5 = 40). Giving 3.2 litres uses the ratio inverted, multiplying by 2 ÷ 5 instead of 5 ÷ 2 (8 × 2 ÷ 5 = 3.2). Giving 11 litres uses additive reasoning instead of multiplicative: it adds the difference between the ratio parts, 5 − 2 = 3, onto the amount of concentrate (8 + 3 = 11), but ratios scale by multiplying, not by adding a fixed amount.
- (c) 40 minutes — Method: this is inverse proportion — fewer taps means longer, not shorter — so the number of taps × the time taken stays constant. Working: 6 × 20 = 120, and with 3 taps the time is 120 ÷ 3 = 40 minutes. So 3 taps take 40 minutes. Distractor 10 minutes comes from treating it as direct proportion instead of inverse, working out 20 × 3 ÷ 6. Distractor 30 minutes comes from halving the number of taps and adding half the original time, 20 + 10, instead of doubling the time. Distractor 17 minutes comes from subtracting the number of taps removed, 3, directly from the original time, 20.
- (c) 1 : 25 — The radii are in the ratio 4 : 20, which simplifies to 1 : 5. Areas scale with the square of the length ratio, so the area ratio is 1² : 5² = 1 : 25. Giving 1 : 5 uses the radius ratio without squaring it. Giving 1 : 10 doubles the radius ratio instead of squaring it. Giving 25 : 1 has the areas the right way round for larger to smaller, not smaller to larger.
- (c) 1.05 litres — Method: find the value of one part of the ratio from the total volume, then find the share for pineapple juice. Working: the ratio 5:3:2 has 5 + 3 + 2 = 10 parts, so one part is 3.5 ÷ 10 = 0.35 litres, and the pineapple juice is 3 × 0.35 = 1.05 litres. So 1.05 litres of pineapple juice is needed. Distractor 1.75 litres is the volume of orange juice, not pineapple juice. Distractor 0.7 litres is the volume of lemonade, not pineapple juice. Distractor 0.35 litres is the value of one part, found correctly but never multiplied by 3.
- (d) 1.00 litres — Squash is 2/9 of the mixture, so the squash volume is 4.5 × 2/9 = 1.00 litres. Using the water's fraction, 7/9, instead of squash's gives 4.5 × 7/9 = 3.50 litres — the volume of water, not squash. Dividing 4.5 by 9 but forgetting to multiply by the numerator 2 gives 4.5 ÷ 9 = 0.50 litres, which is only 1/9 of the mixture. Halving the total volume instead of applying the fraction 2/9 gives 4.5 ÷ 2 = 2.25 litres, which assumes the mixture is half squash.
- (d) £144 — Method: find the length (perimeter) scale factor by taking the square root of the area ratio, then apply it to the cost. Working: 12 : 27 simplifies to 4 : 9, and the square root of each part gives the length ratio 2 : 3, so the scale factor from the smaller to the larger pond is 3 ÷ 2 = 1.5. Cost = £96 × 1.5 = £144. Answer: £144. £216 comes from using the area ratio itself as the cost ratio, £96 × (27 ÷ 12) = £216, without taking the square root. £64 comes from using the length ratio the wrong way round, £96 × (2 ÷ 3) = £64. £111 comes from simply adding the difference in area, 27 − 12 = 15, onto the original cost, £96 + £15 = £111, instead of scaling proportionally.
- (a) 2.17 litres per minute — There are 60 minutes in an hour, so to convert litres per hour to litres per minute you divide by 60: 130 ÷ 60 = 2.1666..., which rounds to 2.17 litres per minute. Multiplying by 60 instead of dividing gives 130 × 60 = 7800.00 litres per minute, using the conversion factor the wrong way round. Leaving the rate unchanged, 130.00, ignores that 'per hour' and 'per minute' are different units. Dividing by 50 instead of 60, misremembering the number of minutes in an hour, gives 130 ÷ 50 = 2.60 litres per minute.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (a) 46.8 km/h — Method: 1 hour = 60 minutes, so a rate given in kilometres per minute is converted to kilometres per hour by multiplying by 60. Working: 0.78 × 60 = 46.8, so the instantaneous rate of change is 46.8 kilometres per hour. Keeping the given value unchanged and only relabelling the unit gives 0.78 km/h, which ignores that the time unit has changed. Dividing by 60 instead of multiplying — as you would when converting to a larger length unit — gives 0.78 ÷ 60 = 0.013 km/h, the wrong direction for a rate measured against a larger time unit. Adding 60 to the given rate instead of multiplying by it gives 0.78 + 60 = 60.78 km/h. Converting a rate always means multiplying or dividing by the conversion factor between the units, never adding it, and the direction depends on whether the new time unit is bigger or smaller than the old one.
- (b) 80 — Method: the difference between 40% and 25% of the number is 15% of the number, and that difference is 12. Working: 15% of the number is 12, so 1% of the number is 12 ÷ 15 = 0.8, and the number is 0.8 × 100 = 80. Check: 40% of 80 is 32, 25% of 80 is 20, and 32 − 20 = 12. Answer: 80. The distractors: 30 comes from solving 40% of the number = 12; 48 comes from solving 25% of the number = 12; 15 is the percentage difference written as the answer.
- (c) 30 km — First convert 1 hour 15 minutes to hours: 15 minutes is a quarter of an hour, so the time is 1.25 hours. Then multiply by the speed: 24 × 1.25 = 30 km. Reading 15 minutes as 0.15 hours (writing the minutes after the decimal point instead of as a fraction of 60) gives 24 × 1.15 = 27.6 km. Working out 24 × 75 = 1800 multiplies by the number of minutes instead of converting to hours first. Working out 24 ÷ 1.25 = 19.2 divides by the time instead of multiplying. The cyclist travels 30 km.
- (b) 5/7 — The enlargement multiplier is 1.4, which as a fraction is 7/5. To reverse an enlargement, use the reciprocal of the multiplier: flip 7/5 to get 5/7. 7/5 comes from using the enlargement multiplier again, instead of reversing it. 3/5 comes from treating the reverse as 'give back the extra amount', working out 1 − (1.4 − 1) = 0.6, instead of using the reciprocal. 5/2 comes from ignoring the whole number in 1.4 and inverting only the decimal part, 0.4, as if it were the whole multiplier.
- (d) d ÷ t — Average speed = distance ÷ time, so the expression is d ÷ t. Writing t ÷ d inverts the formula, giving the time per kilometre instead of the speed. Writing d × t confuses speed with the formula for distance travelled (distance = speed × time) used the wrong way round. Writing d + t treats the relationship as additive instead of using division.
Build your own mix at the worksheet builder.