Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.£5000 is invested in an account paying 4% compound interest each year. Work out the total interest earned after 3 years.
- 2.Work out the value of x when 4/x = 2/5.
- 3.The amount of fuel left in a car's tank, F litres, is plotted against the distance travelled, d miles, and the points lie on a straight line. The line passes through (0, 45) and (150, 15). Work out the gradient of the line and say what it tells you.
- 4.Two cars leave the same point at the same time and travel in opposite directions. One travels at 80 km/h and the other at 60 km/h. Work out how long it takes until the cars are 350 km apart.
- 5.A map has a scale of 1 : 25 000. Two towns are 5 km apart in real life. Work out the distance between the towns on the map, in centimetres.
- 6.A firework rocket's height above the ground, in metres, t seconds after launch, is modelled by h = 30t − 5t². Use a chord between t = 1 second and t = 3 seconds to estimate the instantaneous rate of change of the height at t = 2 seconds, in m/s.
- 7.Maya is paid £105.30 for working 9 hours. Work out her rate of pay, in £ per hour.
- 8.The tangent to a curve at the point where x = 4 has equation y = 3x − 2. Work out the instantaneous rate of change of y with respect to x at x = 4.y = 3x − 2
- 9.Given that 1 mile ≈ 1.6 km, work out a speed of 55 mph in km/h.
- 10.A process is modelled by the recurrence P_{n+1} = 0.6P_n + 40. As n increases, P_n approaches a long-run value L, which satisfies L = 0.6L + 40. Solve this equation to find L.
- 11.A mortar mix is made from sand and cement in the ratio 5 : 3. Write the ratio of sand to the total mix in its simplest form.
- 12.A rectangular garden has its length and width in the ratio 5:3. Given that the perimeter of the garden is 64 m, work out the width of the garden.
- 13.A pump fills a paddling pool at a rate of 130 litres per hour. Work out the rate in litres per minute, to 2 decimal places.
- 14.A trust fund contains £8000. Each year, 5% interest is added, and then £600 is paid out to a charity. Work out the amount remaining in the fund after 2 years.
- 15.A cyclist rides 19.3 km in 47 minutes. Work out her average speed, in km/h, to 1 decimal place.
Answer key
- (c) £624.32 — A 4% rise is a multiplier of 1.04, applied once each year. After year 1: 5000 × 1.04 = 5200. After year 2: 5200 × 1.04 = 5408. After year 3: 5408 × 1.04 = 5624.32. The question asks for the interest, not the value of the account, so take away the amount invested at the start: 5624.32 − 5000 = 624.32. The total interest earned is £624.32.
- (a) 10 — Method: two equal fractions can be rearranged by cross-multiplying, multiplying each numerator by the other denominator. Working: 4 × 5 = 2 × x, so 2x = 20 and x = 20 ÷ 2 = 10. Answer: 10. The distractors: 20 comes from cross-multiplying to 4 × 5 = 20 and stopping there, without dividing by the 2; 8 comes from multiplying the two numerators, 4 × 2; 2.5 comes from working only with the right-hand fraction, 5 ÷ 2, and ignoring the 4.
- (c) −0.2, the car uses 0.2 litres of fuel for each mile — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, which on this graph is a number of litres for each mile, and a negative gradient means the vertical quantity is going down. Working: from (0, 45) to (150, 15) the fuel changes by 15 − 45 = −30 litres while the distance changes by 150 − 0 = 150 miles, so the gradient is −30 ÷ 150 = −0.2, which says the tank loses 0.2 litres for every mile driven. Answer: −0.2, the car uses 0.2 litres of fuel for each mile. The distractors: '0.2, the car gains 0.2 litres of fuel for each mile' comes from subtracting the fuel values the other way round, 45 − 15 = 30, which drops the minus sign and reverses what the graph says; '−5, the car uses 5 litres of fuel for each mile' comes from dividing the change in distance by the change in fuel, 150 ÷ (−30), turning the gradient upside down; '−30, the car uses 30 litres of fuel for each mile' is the change in fuel on its own, never divided by the 150 miles travelled.
- (b) 2.5 hours — Method: when two objects move in opposite directions the gap between them grows at the sum of their speeds, so divide the required gap by that combined rate. Working: 80 + 60 = 140 km of gap each hour, and 350 ÷ 140 = 2.5. Answer: 2.5 hours. The distractors: 17.5 hours comes from subtracting the speeds, 80 − 60 = 20, which is the rate for two cars travelling in the same direction; 5 hours comes from using the mean of the two speeds, 70 km/h, instead of their sum; 4.375 hours comes from dividing 350 by 80 and ignoring the second car altogether.
- (c) 20 cm — Convert 5 km to centimetres: 5 km = 5000 m = 500 000 cm. Divide by the scale factor: 500 000 ÷ 25 000 = 20, giving 20 cm. Converting only as far as metres, 5000 ÷ 25 000 = 0.2, gives 0.2 cm — the conversion to centimetres was never finished. Dropping a zero in the division gives 2 cm, ten times too small. Misreading the scale as 1 : 2500 instead of 1 : 25 000 gives 500 000 ÷ 2500 = 200 cm, ten times too big.
- (d) 10 — First find the height at each end of the chord. At t = 1, h = 30 × 1 − 5 × 1² = 30 − 5 = 25. At t = 3, h = 30 × 3 − 5 × 3² = 90 − 45 = 45. The gradient of the chord estimates the instantaneous rate at the midpoint t = 2: 45 − 25 = 20, then 20 ÷ (3 − 1) = 20 ÷ 2 = 10 m/s. Finding the change in height but forgetting to divide by the change in time gives 20, which is a distance, not a rate. Averaging the two heights instead of finding the difference gives (25 + 45) ÷ 2 = 70 ÷ 2 = 35. Subtracting in the wrong order, 25 − 45 = −20, then −20 ÷ 2 = −10, gives the correct size with the sign flipped — the rocket is rising, not falling, at t = 2 seconds, so a negative rate cannot be right here.
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (c) 3 — Method: for a tangent written in the form y = mx + c, the coefficient m is the gradient of the line, and the gradient of the tangent at its point of contact equals the curve's instantaneous rate of change there. Working: y = 3x − 2 has gradient 3, so the instantaneous rate of change of y with respect to x at x = 4 is 3. Reading the constant term as the rate instead of the coefficient of x gives −2, but −2 is only where the tangent crosses the y-axis, not a rate. Reading the x-coordinate of the point of contact as the rate gives 4, but 4 only tells you where on the curve the tangent touches, not how fast y is changing there. Substituting x = 4 into the tangent equation, 3 × 4 − 2 = 10, gives the y-coordinate of the point of contact, not the rate; a candidate who works out the height of the point instead of the gradient gives 10. Whenever a tangent is given as an equation, the rate of change is always the coefficient of x — do not let the constant term, the x-value or a substituted y-value stand in for it.
- (c) 88 km/h — Multiply the speed in mph by the conversion factor: 55 × 1.6 = 88 km/h. Dividing by 1.6 instead of multiplying gives 55 ÷ 1.6 ≈ 34.38 km/h, going the wrong way between the units. Adding the conversion factor instead of multiplying gives 55 + 1.6 = 56.6 km/h, treating the factor as an amount rather than a multiplier. Multiplying by 0.6 instead of 1.6 gives 55 × 0.6 = 33 km/h, using only part of the conversion factor. 55 mph is equal to 88 km/h.
- (d) 100 — Rearrange L = 0.6L + 40 by collecting the L terms on one side: L − 0.6L = 40, which gives 0.4L = 40, then L = 40 ÷ 0.4 = 100. Subtracting the other way round, 0.6L − L = 40, gives −0.4L = 40, then L = 40 ÷ (−0.4) = −100 — a sign error that flips the answer negative even though a long-run value here must be positive. Ignoring the 0.6L term completely and solving L = 40 directly gives 40, which throws away the recurrence's own multiplier. Dividing 40 by 0.6 instead of by the correct coefficient 0.4 gives 40 ÷ 0.6 ≈ 66.7, a slip that comes from dividing by the coefficient of L on the RIGHT of the original equation rather than by what is left once the L terms are collected on one side. Always collect the L terms first, then divide by whatever coefficient of L remains.
- (b) 5:8 — The mix has 5 parts sand and 3 parts cement, so 5 + 3 = 8 parts in total. Sand to total is 5 : 8, and since the highest common factor of 5 and 8 is 1, this is already in its simplest form. Giving 5 : 3 answers sand to cement, not sand to the total mix. Giving 3 : 8 is cement to total, the wrong part of the mix. Giving 8 : 5 has the total and the sand swapped round.
- (c) 12 m — Method: the perimeter of a rectangle is twice the sum of the length and the width, so half the perimeter is one length plus one width; split that half using the ratio. Working: half of 64 is 64 ÷ 2 = 32 m, the ratio 5:3 has 5 + 3 = 8 parts, so one part is 32 ÷ 8 = 4 m, and the width is 3 × 4 = 12 m. So the width is 12 m. Distractor 20 m is the length, 5 parts, not the width. Distractor 24 m comes from splitting the whole perimeter, 64 m, into 8 parts and multiplying by 3, forgetting to halve the perimeter first. Distractor 8 m comes from the same slip stopped one step earlier: splitting the whole perimeter into 8 parts, 64 ÷ 8 = 8, and giving that instead of the width.
- (a) 2.17 litres per minute — There are 60 minutes in an hour, so to convert litres per hour to litres per minute you divide by 60: 130 ÷ 60 = 2.1666..., which rounds to 2.17 litres per minute. Multiplying by 60 instead of dividing gives 130 × 60 = 7800.00 litres per minute, using the conversion factor the wrong way round. Leaving the rate unchanged, 130.00, ignores that 'per hour' and 'per minute' are different units. Dividing by 50 instead of 60, misremembering the number of minutes in an hour, gives 130 ÷ 50 = 2.60 litres per minute.
- (c) £7590 — Apply interest, then subtract the payment, once for each year. Year 1: 8000 × 1.05 = 8400, then 8400 − 600 = 7800. Year 2: 7800 × 1.05 = 8190, then 8190 − 600 = 7590, so £7590 remains after 2 years. Forgetting the payments altogether and only compounding the interest gives 8000 × 1.05 = 8400, then 8400 × 1.05 = 8820 — this ignores that £600 leaves the fund every year. Subtracting the £600 BEFORE adding interest each year, instead of after, gives (8000 − 600) × 1.05 = 7770, then (7770 − 600) × 1.05 = 7528.50, which changes the order the two operations happen in and so changes the amount that earns interest each year. Subtracting the two payments as one lump sum of £1200 at the very end, from the no-withdrawal total 8820 − 1200 = 7620, ignores that the first £600 withdrawal also stops earning interest during the second year. Always apply interest, then the withdrawal, in that order, once for every single year.
- (d) 24.6 km/h — Average speed = distance ÷ time, with time in hours. 47 minutes = 47 ÷ 60 hours. 19.3 ÷ (47 ÷ 60) = 19.3 ÷ 47 × 60 = 24.638…, which rounds to 24.6 km/h (1 d.p.). 0.4 km/h comes from dividing the distance by 47 and treating the result as km/h directly, without converting the minutes to hours at all. 41.1 km/h comes from converting minutes to hours by dividing by 100 instead of 60 (19.3 ÷ 47 × 100). 0.3 km/h comes from dividing the distance by 60 instead of converting the 47 minutes to hours first.
Build your own mix at the worksheet builder.