Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (b) 4 : 25 — For similar shapes, the ratio of areas is the ratio of lengths squared: 2² : 5² = 4 : 25. 2 : 5 comes from using the perimeter ratio itself as the area ratio, without squaring it at all. 8 : 125 comes from cubing each part instead of squaring (2³ : 5³) — cubing is the rule for volume, not area. 4 : 5 comes from squaring only the first part of the ratio (2² = 4), and leaving the second part unsquared.
- (b) t = 5 and t = 7 (closest, evenly spaced) — To estimate the instantaneous rate of change at t = 6, use the chord centred on t = 6 with the closest readings on either side, t = 5 and t = 7. The gradient of this chord is 15.4 − 17.5 = −2.1, then −2.1 ÷ 2 = −1.05 cm per minute. The interval t = 3 to t = 9 is also centred on t = 6 but is wider: 13.4 − 18.7 = −5.3, then −5.3 ÷ 6 ≈ −0.88 cm per minute — this brings in more of the curve's own change in steepness, so it is a worse estimate of the rate at the single instant t = 6. Using t = 6 and t = 7 only gives 15.4 − 16.6 = −1.2, then −1.2 ÷ 1 = −1.2 cm per minute, but this is not centred on t = 6 — it estimates the rate over (6, 7), not at t = 6 itself. Using t = 0 and t = 6 gives 16.6 − 20.0 = −3.4, then −3.4 ÷ 6 ≈ −0.57 cm per minute, the average rate for the whole first six minutes, not the rate at the instant t = 6. Always choose the chord that brackets the point as closely as possible.
- (a) 5/12 — Work out the distance still to travel: 372 − 217 = 155 miles. Form the fraction 155/372; both numbers share a factor of 31, so 155 ÷ 31 = 5 and 372 ÷ 31 = 12, giving 5/12. 7/12 comes from writing the distance already travelled as the fraction of the journey (217/372 = 7/12), instead of the distance still to travel. 145/372 comes from miscalculating 372 − 217 as 145 instead of 155. 5/7 comes from comparing the remaining distance with the distance already travelled (155/217 = 5/7), instead of with the total journey.
- (d) 35 — Method: in direct proportion the ratio y : x is the same for every pair, so find the constant and substitute the new value of x. Working: k = 20 ÷ 8 = 2.5, so y = 2.5x; when x = 14, y = 2.5 × 14 = 35. Answer: 35. The distractors: 26 comes from additive thinking — x rises by 6, so 6 is added to y — which would keep the difference constant rather than the ratio; 28 comes from rounding the constant 2.5 down to 2 and working out 2 × 14, which loses the half in the constant; 5.6 comes from using the constant upside down, 8 ÷ 20 = 0.4, and working out 0.4 × 14.
- (a) 1/9 — The ratio copper : tin is 9:1, so write tin over copper: 1/9. (9/1 comes from writing the ratio the wrong way round, copper over tin. 1/10 comes from comparing the tin to the total mass of the alloy, 1 part out of 10. 9/10 comes from comparing the copper to the total mass of the alloy, 9 parts out of 10.)
- (c) Height rising at 2 m/s at t = 1.5 s — A tangent's gradient on a height-time graph is the instantaneous rate of change of height, in metres per second, so gradient 2 means the ball's height is increasing at 2 m/s at t = 1.5 s. Saying the height 'is 2 m' confuses the gradient, a rate, with the y-value on the graph, which is the ball's height itself. Saying the ball 'travelled 2 m from t = 1 to t = 2' treats the instantaneous gradient at one instant as if it were the total distance risen over a whole one-second interval, which is a different quantity found from two height readings, not from one tangent. Saying the speed 'is 2 m/s²' uses the wrong units — m/s² measures acceleration, the rate of change of speed, not speed itself. Always check that the units quoted match what a height-time graph's gradient can actually give you: metres per second.
- (a) 11:00 to 12:00 — Method: the instantaneous rate of change is zero at a turning point, where a rising trend becomes a falling trend; that lies within the first interval whose difference has changed sign from the interval before it. Working: the differences between consecutive readings are +3.4 °C (09:00 to 10:00), +1.7 °C (10:00 to 11:00), −0.3 °C (11:00 to 12:00) and −2.6 °C (12:00 to 13:00); the sign changes from positive to negative within 11:00 to 12:00, since the temperature is still rising up to 11:00 (20.1 °C, the highest recorded value) and has fallen by 12:00, so the instantaneous rate of change was zero somewhere within that interval. Choosing 09:00 to 10:00 picks out the interval with the largest positive difference, +3.4 °C, confusing the fastest rise with no change at all. Choosing 10:00 to 11:00 picks the last interval where the temperature was still rising, one interval too early, without checking that the very next interval turns negative. Choosing 12:00 to 13:00 picks out the interval with the largest-magnitude difference, −2.6 °C, the fastest fall, not where the change is zero. Zero instantaneous rate of change happens at a turning point, where the readings stop rising and start falling — find the FIRST interval whose difference has flipped sign from the one before it, not the biggest change or an interval where the old sign still held.
- (b) £250 — Since cost is proportional to the cube of the radius, C = kr³. Using r = 3, C = 54: 3³ = 27, so 54 = k × 27, giving k = 54 ÷ 27 = 2. The equation is C = 2r³. When r = 5: 5³ = 125, so C = 2 × 125 = 250. Treating the relationship as proportional to r² instead of r³ gives k = 54 ÷ 9 = 6 and then C = 6 × 25 = 150, which models area scaling, not volume scaling. Treating it as proportional to r itself gives k = 54 ÷ 3 = 18 and then C = 18 × 5 = 90. Finding k correctly from the cube but then multiplying it by the radius instead of by the cube of the radius gives 2 × 5 = 10, which applies the right constant to the wrong power of r. The cost of a container of radius 5 cm is £250.
- (d) 24.6 km/h — Average speed = distance ÷ time, with time in hours. 47 minutes = 47 ÷ 60 hours. 19.3 ÷ (47 ÷ 60) = 19.3 ÷ 47 × 60 = 24.638…, which rounds to 24.6 km/h (1 d.p.). 0.4 km/h comes from dividing the distance by 47 and treating the result as km/h directly, without converting the minutes to hours at all. 41.1 km/h comes from converting minutes to hours by dividing by 100 instead of 60 (19.3 ÷ 47 × 100). 0.3 km/h comes from dividing the distance by 60 instead of converting the 47 minutes to hours first.
- (c) L = d/5 — The scale 1 : 20 means each cm on the drawing represents 20 cm in real life, so the real length in cm is 20d. Converting to metres by dividing by 100: L = 20d/100 = d/5.
- (d) 135 m² — Method: for area, the scale factor must be squared. Working: area scale = 300² = 90 000. 15 × 90 000 = 1,350,000 cm². Convert to m² by dividing by 10 000: 1,350,000 ÷ 10 000 = 135 m². Wrong options: 0.45 m² comes from using the linear scale factor (×300) instead of squaring it; 1,350,000 m² comes from forgetting to convert the answer from cm² to m²; 13,500 m² comes from dividing by 100 instead of 10 000 when converting units.
- (b) £16 — Since cost is proportional to the square root of diameter, C = k√d. Using d = 9, C = 12: √9 = 3, so 12 = k × 3, giving k = 12 ÷ 3 = 4. The equation is C = 4√d. When d = 16: √16 = 4, so C = 4 × 4 = 16. Halving the new diameter instead of taking its square root gives 16 ÷ 2 = 8, and then C = 4 × 8 = 32 — halving a number is not the same as taking its square root, as √16 = 4, not 8. Multiplying k by the diameter itself instead of by its square root gives C = 4 × 16 = 64, skipping the square root altogether. Reporting √16 on its own, without multiplying by k, gives only 4, not the cost. The cost of manufacturing a lens of diameter 16 mm is £16.
- (c) 4 km — Since signal strength is inversely proportional to the square of the distance, S = k/d². Using d = 2, S = 20: 2² = 4, so 20 = k ÷ 4, giving k = 20 × 4 = 80. The equation is S = 80/d². When S = 5: d² = 80 ÷ 5 = 16, so d = 4 (taking the positive root, since distance cannot be negative). Stopping at d² = 16 without taking the square root leaves 16, the square of the distance, not the distance itself. Treating the relationship as inversely proportional to distance itself, rather than to its square, gives k = 20 × 2 = 40 and then d = 40 ÷ 5 = 8, a different relationship. Multiplying by S instead of dividing by it when isolating d² gives d² = 80 × 5 = 400 and d = 20, the wrong operation. The distance at which the signal strength is 5 units is 4 km.
- (b) −3 — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, with both changes taken in the same direction along the line. Working: going from (1, 20) to (5, 8) the change in y is 8 − 20 = −12 and the change in x is 5 − 1 = 4, so the gradient is −12 ÷ 4 = −3. Answer: −3, and the negative sign is expected because the line falls from left to right. The distractors: 3 comes from subtracting the smaller y from the larger, 20 − 8 = 12, while still taking the x values from left to right, which loses the minus sign that says the line falls; −12 is the change in y left undivided by the change in x of 4; −1/3 comes from dividing the change in x by the change in y, 4 ÷ (−12), turning the gradient upside down.
Build your own mix at the worksheet builder.