- (c) Height rising at 2 m/s at t = 1.5 s — A tangent's gradient on a height-time graph is the instantaneous rate of change of height, in metres per second, so gradient 2 means the ball's height is increasing at 2 m/s at t = 1.5 s. Saying the height 'is 2 m' confuses the gradient, a rate, with the y-value on the graph, which is the ball's height itself. Saying the ball 'travelled 2 m from t = 1 to t = 2' treats the instantaneous gradient at one instant as if it were the total distance risen over a whole one-second interval, which is a different quantity found from two height readings, not from one tangent. Saying the speed 'is 2 m/s²' uses the wrong units — m/s² measures acceleration, the rate of change of speed, not speed itself. Always check that the units quoted match what a height-time graph's gradient can actually give you: metres per second.
- (d) 8/5 — Two masses can only be compared once they are in the same unit. Since 1 kg is 1000 g, the recipe needs 1200 g. The recipe's mass is being written as a fraction of Dan's mass, so 1200 goes on the top and 750 on the bottom, giving 1200/750. The highest common factor of the two is 150: 1200 ÷ 150 = 8 and 750 ÷ 150 = 5. The fraction is 8/5, which is greater than 1 because the recipe needs more flour than Dan has.
- (d) 25 — Gradient = (60 − 20) ÷ (15 − 5) = 40 ÷ 10 = 4 litres per minute. Since the butt is empty at t = 0, V = 4t. Setting V = 100 gives t = 100 ÷ 4 = 25 minutes.
- (c) 27.1 cm — The model length is 20.6 ÷ 76 = 0.271052... metres. Converting to centimetres by multiplying by 100 gives 27.1052..., which rounds to 27.1 cm. Forgetting to convert metres to centimetres leaves the answer as 0.271052... metres, which rounds to 0.3 cm if the unit is simply relabelled. Multiplying by 1000 instead of 100 when converting metres to centimetres gives 271.052..., which rounds to 271.1 cm. Multiplying by 76 instead of dividing, 20.6 × 76 = 1565.6, uses the scale factor the wrong way round — that would be the real length if the model were 20.6 units long, not the other way round.
- (a) 28.8 km/h — Method: first change metres per second into metres per hour, then change metres into kilometres. Working: 8 × 3600 = 28800 metres per hour, then 28800 ÷ 1000 = 28.8 km/h. So the runner's speed is 28.8 km/h. Distractor 28800 km/h comes from stopping after the first step and forgetting to change metres into kilometres. Distractor 2.22 km/h comes from dividing by 3600 instead of multiplying, then multiplying by 1000. Distractor 2.88 km/h comes from using 360 instead of 3600 seconds in an hour, missing a zero.
- (a) 7 — The average rate of change of y with respect to x over an interval is the change in y divided by the change in x between its two endpoints — the gradient of the chord joining them, not a rate at a single point. At x = 1: 2 × 1 = 2, so y = 1 + 2 = 3. At x = 4: 2 × 4 = 8, so y = 16 + 8 = 24. The change in y is 24 − 3 = 21 and the change in x is 4 − 1 = 3, so the average rate of change is 21 ÷ 3 = 7. Reporting the change in y, 21, on its own is not a rate of change, because it has not been divided by the 3 units of x over which it happened. Reporting 3 is not a rate either — 3 is the width of the interval, and also the value of y at x = 1, and neither of those measures how fast y is changing. Subtracting in the wrong order gives −21 ÷ 3 = −7, the wrong sign. The average rate of change of y with respect to x over the interval is 7.
- (c) 4 km — Since signal strength is inversely proportional to the square of the distance, S = k/d². Using d = 2, S = 20: 2² = 4, so 20 = k ÷ 4, giving k = 20 × 4 = 80. The equation is S = 80/d². When S = 5: d² = 80 ÷ 5 = 16, so d = 4 (taking the positive root, since distance cannot be negative). Stopping at d² = 16 without taking the square root leaves 16, the square of the distance, not the distance itself. Treating the relationship as inversely proportional to distance itself, rather than to its square, gives k = 20 × 2 = 40 and then d = 40 ÷ 5 = 8, a different relationship. Multiplying by S instead of dividing by it when isolating d² gives d² = 80 × 5 = 400 and d = 20, the wrong operation. The distance at which the signal strength is 5 units is 4 km.
- (c) They are in direct proportion, because y ÷ x = 2.5 for both pairs. — Testing direct proportion means checking that y ÷ x is the same for every pair: 15 ÷ 6 = 2.5 and 25 ÷ 10 = 2.5, so the quantities are in direct proportion. Saying they are not in proportion because x + y differs uses addition, which is not the correct test for proportion. Saying they are not in proportion because y − x differs also uses the wrong test — subtraction, not division. Saying they are in proportion because x × y is 90 and 250 uses multiplication, which is the test for inverse proportion, and the two products are not even equal to each other, so this option also contradicts itself.
- (c) 88 km/h — Multiply the speed in mph by the conversion factor: 55 × 1.6 = 88 km/h. Dividing by 1.6 instead of multiplying gives 55 ÷ 1.6 ≈ 34.38 km/h, going the wrong way between the units. Adding the conversion factor instead of multiplying gives 55 + 1.6 = 56.6 km/h, treating the factor as an amount rather than a multiplier. Multiplying by 0.6 instead of 1.6 gives 55 × 0.6 = 33 km/h, using only part of the conversion factor. 55 mph is equal to 88 km/h.
- (d) 48 — Find the rate first: 18 ÷ 3 = 6 bottles per minute. Then apply it to the new time: 6 × 8 = 48 bottles. Working out 18 + (8 − 3) = 23 adds the extra 5 minutes onto the number of bottles instead of scaling proportionally. Working out 18 × 8 = 144 multiplies the given number of bottles by the new number of minutes without finding the rate first. Writing 18 keeps the count the same, not realising it must change with the time. In 8 minutes the machine fills 48 bottles.
- (d) £30.00 — The gradient is (130 − 70) ÷ (5 − 2) = 60 ÷ 3 = £20 per hour. Using the point (2, 70): the cost for 2 hours at £20 per hour is 20 × 2 = £40, so the call-out fee is 70 − 40 = £30. Taking the C-value of the first point as the fee without subtracting the hourly cost gives £70.00 — but that point already includes 2 hours of the hourly rate. Using the gradient itself as the fee, £20.00, confuses the rate per hour with the fixed charge. Subtracting 20 × 3 = 60 instead of 20 × 2 = 40 (using the wrong h-value) gives 70 − 60 = £10.00.
- (a) 1.375 — The multiplier is the new value divided by the original value: 176 000 ÷ 128 000 = 1.375. Choosing 0.375 comes from working out the increase as a fraction of the original (48 000 ÷ 128 000 = 0.375) and stopping there, without adding on the 1 whole that represents the original turnover. Choosing 0.727 comes from dividing the 2023 turnover by the 2024 turnover, the wrong way round (128 000 ÷ 176 000, rounded to 3 decimal places). Choosing 137.5 comes from writing the multiplier as a percentage — the 2024 turnover is 137.5% of the 2023 turnover — instead of converting it to the decimal multiplier 1.375.
- (c) 20 cm — Convert 5 km to centimetres: 5 km = 5000 m = 500 000 cm. Divide by the scale factor: 500 000 ÷ 25 000 = 20, giving 20 cm. Converting only as far as metres, 5000 ÷ 25 000 = 0.2, gives 0.2 cm — the conversion to centimetres was never finished. Dropping a zero in the division gives 2 cm, ten times too small. Misreading the scale as 1 : 2500 instead of 1 : 25 000 gives 500 000 ÷ 2500 = 200 cm, ten times too big.
- (a) 40 m² — A scale of 1 : 10 is a length scale factor of 10 from model to real. Areas scale with the square of the length scale factor: 10² = 100. 0.4 × 100 = 40, so the real staircase covers 40 m². Giving 4 m² uses the length scale factor, 10, without squaring it (0.4 × 10 = 4). Giving 0.04 m² divides by the scale factor instead of multiplying by its square (0.4 ÷ 10 = 0.04). Giving 400 m² cubes the scale factor, 10³ = 1000, as if area scaled like a volume (0.4 × 1000 = 400).
- (a) 12 — Speed × time is constant: k = 20 × 15 = 300. At 25 pages per minute, the time is 300 ÷ 25 = 12 minutes. Getting 18.75 comes from treating speed and time as directly proportional and working out 15 × 25 ÷ 20 instead of dividing k by the new speed. Getting 20 comes from adding the increase in speed (25 − 20 = 5) onto the time (15 + 5 = 20). Getting 10 comes from subtracting that same increase in speed from the time (15 − 5 = 10).