Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 20 litres per minute — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, and its units are the vertical unit for each one of the horizontal unit. Working: from (2, 50) to (6, 130) the volume changes by 130 − 50 = 80 litres and the time changes by 6 − 2 = 4 minutes, so the gradient is 80 ÷ 4 = 20, measured in litres for each minute. Answer: 20 litres per minute. The distractors: 25 litres per minute comes from using one point on its own, 50 ÷ 2, which assumes the line starts at the origin when the tank already held 50 litres at 2 minutes; 0.05 litres per minute comes from dividing the change in time by the change in volume, 4 ÷ 80, which gives the time for each litre but is then labelled as litres for each minute; 20 minutes for each litre has the right value with the units the wrong way round, and a tank that needed 20 minutes to gain a single litre would be filling far more slowly than this one.
- (b) 4% — Method: find the total interest earned, share it equally across the number of years to find one year's interest, then write it as a percentage of the amount invested. Working: total interest = £840 − £750 = £90, so one year's interest is £90 ÷ 3 = £30, and £30 as a percentage of £750 is (£30 ÷ £750) × 100 = 4%. Answer: 4%. 12% comes from treating the total interest of £90 as if it were earned in a single year, (£90 ÷ £750) × 100 = 12%, forgetting to divide by 3 years. 0.04% comes from finding the correct decimal, £30 ÷ £750 = 0.04, but forgetting to multiply by 100 to convert it into a percentage. 112% comes from writing the final amount, £840, as a percentage of the amount invested, £750, without first subtracting the £750 to find the interest alone.
- (a) 5/12 — Work out the distance still to travel: 372 − 217 = 155 miles. Form the fraction 155/372; both numbers share a factor of 31, so 155 ÷ 31 = 5 and 372 ÷ 31 = 12, giving 5/12. 7/12 comes from writing the distance already travelled as the fraction of the journey (217/372 = 7/12), instead of the distance still to travel. 145/372 comes from miscalculating 372 − 217 as 145 instead of 155. 5/7 comes from comparing the remaining distance with the distance already travelled (155/217 = 5/7), instead of with the total journey.
- (c) 1.2 — Add the parts of the ratio: 6 + 1 = 7. Divide the total amount by the number of parts: 8.4 ÷ 7 = 1.2 litres, which is the value of one part and also the amount of syrup, since syrup is 1 part. (7.2 litres is the amount of water, using 6 parts instead of 1. 1.4 comes from dividing 8.4 by 6 — the water's part of the ratio — instead of dividing by the total number of parts, 7. 0.84 comes from dividing 8.4 by 10 instead of by 7.)
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (a) 675 ml — How much a jug holds is a volume, and volumes of similar solids scale with the cube of the length scale factor. The length scale factor is 12 ÷ 8 = 1.5, so the volume scale factor is 1.5 × 1.5 × 1.5 = 3.375. The larger jug holds 200 × 3.375 = 675 ml. Multiplying the scale factor by 3 instead of raising it to the power 3 is the mistake to guard against here.
- (c) 120 km/h — Method: for a fixed distance the average speed multiplied by the time is constant, and that constant is the distance, so divide the distance by the new time. Working: speed × time = 240, so in 2 hours the speed needed is 240 ÷ 2 = 120 km/h. Answer: 120 km/h. The distractors: 80 km/h is the average speed of the original journey, 240 ÷ 3, which answers for the 3-hour timing rather than the 2-hour one; 160 km/h comes from halving the 3 hours to 1.5 hours and working out 240 ÷ 1.5, instead of using the 2 hours the question gives; 480 km/h comes from multiplying the distance by the 2 hours rather than dividing by it.
- (c) £840 — Method: find the total amount raised using the reverse percentage, then subtract the entry fees to find the donations. Working: £1,260 is 60% of the total, so the total is £1,260 ÷ 0.6, and subtracting the entry fees from this total leaves £840 raised through donations. Answer: £840. £2,100 comes from correctly finding the total amount raised but then forgetting to subtract the entry fees, giving the total instead of the donations alone. £504 comes from working out 40% of the entry fees themselves, £1,260 × 0.4 = £504, instead of first finding the total amount raised. £1,890 comes from treating £1,260 as 40% of the total instead of 60%, dividing by 0.4 to get a total of £3,150, and then subtracting the entry fees from that incorrect total.
- (d) 3:8 — Convert 2 hours to minutes: 2 hours = 120 minutes. The ratio is 45 : 120. The highest common factor of 45 and 120 is 15. Divide both parts by 15: 45 ÷ 15 = 3 and 120 ÷ 15 = 8, giving 3 : 8. Leaving the hours unconverted gives 45 : 2 — the units on each side are different, so this does not compare like with like. Dividing by 5 instead of 15 gives 9 : 24, which still shares a common factor of 3, so it is not fully simplified. Swapping the order gives 8 : 3, hours to minutes instead of minutes to hours.
- (a) 24 N/m² — Pressure = force ÷ area. 68.4 ÷ 2.85 = 24 N/m². 194.94 N/m² comes from multiplying the force by the area instead of dividing (68.4 × 2.85). 65.55 N/m² comes from subtracting the area from the force (68.4 − 2.85) instead of dividing. 0.04 N/m² comes from dividing the area by the force instead of the force by the area (2.85 ÷ 68.4).
- (a) 36 — Pressure = force ÷ area, so 126 ÷ 3.5 = 36 N/m². (0.03 comes from dividing the area by the force instead of the force by the area, the wrong way round. 129.5 comes from adding 126 and 3.5 instead of dividing. 441 comes from multiplying 126 by 3.5 instead of dividing.)
- (d) 218 — The rule x_{n+1} = 0.8x_n + 50 must be applied once for each step, using the result of the previous step every time — not the same starting value repeated. Starting from x_0 = 200: 0.8 × 200 = 160, so x_1 = 160 + 50 = 210. Then 0.8 × 210 = 168, so x_2 = 168 + 50 = 218. Stopping after one iteration leaves x_1 = 210, not x_2. Applying only the multiplier twice without adding 50 at each step uses 0.8² = 0.64, and 0.64 × 200 = 128, which drops the 50 completely. Adding 50 twice at the end instead of once per step, 128 + 100 = 228, still does not reproduce the actual recurrence, because the 50 added at the first step is itself multiplied by 0.8 at the second step. After two iterations, x_2 = 218.
- (a) £14224 — Value after 2 years: £15000 × 1.04 × 1.04 = £16224. Money left after buying the trailer: £16224 − £2000 = £14224. £14200 comes from treating the two 4% increases as a single flat 8% increase applied once instead of compounding: £15000 × 1.08 = £16200, and £16200 − £2000 = £14200. £13600 comes from applying the 4% increase only once, for 1 year instead of 2: £15000 × 1.04 = £15600, and £15600 − £2000 = £13600. £18224 comes from adding the £2000 instead of subtracting it: £16224 + £2000 = £18224.
- (d) £8262 — A fall of 15% is a multiplier of 0.85 and a fall of 10% is a multiplier of 0.9, and each multiplier acts on the value at the start of its own year. After year 1: 12000 × 0.85 = 10200. After year 2: 10200 × 0.9 = 9180. After year 3: 9180 × 0.9 = 8262. The value 3 years after the car was bought is £8262. Adding the percentages to make a single fall of 35% would be wrong, because the later falls are taken from smaller values.
- (c) 3 — Method: find the height scale factor, cube it to find the volume (and coverage) scale factor, use it to find one large sack's coverage, then divide the total lawn area by this and round up to a whole number of sacks. Working: height scale factor = 40 ÷ 20 = 2, so coverage scale factor = 2³ = 8, and each large sack covers 30 × 8 = 240 m². 500 ÷ 240 = 2.08…, which rounds UP to 3 whole sacks. Answer: 3. 2 comes from correctly finding that each large sack covers 240 m², but then rounding 500 ÷ 240 down instead of up, which would leave part of the lawn untreated. 5 comes from squaring the height scale factor (2² = 4) instead of cubing it, giving a coverage of only 30 × 4 = 120 m² per sack. 17 comes from forgetting to scale the coverage at all and dividing 500 by the smaller sack's coverage of 30 m².
Build your own mix at the worksheet builder.