Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) £338.69 — To increase by 12% each year, multiply by 1.12 twice. £270 × 1.12 × 1.12 = £338.688, which rounds to £338.69 (nearest penny, since the third decimal place is 8). £334.80 comes from treating the two 12% increases as a single flat 24% increase applied once instead of compounding: £270 × 1.24 = £334.80. £302.40 comes from applying the 12% increase only once, for 1 year instead of 2: £270 × 1.12 = £302.40. £338.68 comes from rounding £338.688 down to the nearest penny instead of up.
- (d) 0.40 m/min — To estimate an instantaneous rate of change at a point without a diagram, use the gradient of a chord joining two points close to it, one on each side. At t = 9: 0.02 × 81 = 1.62, so h = 1.62 + 0.5 = 2.12. At t = 11: 0.02 × 121 = 2.42, so h = 2.42 + 0.5 = 2.92. The change in height is 2.92 − 2.12 = 0.80 and the change in time is 11 − 9 = 2, so the gradient of the chord is 0.80 ÷ 2 = 0.40. Reporting the change in height, 0.80, on its own is not a rate, because it has not been divided by the 2 minutes over which it happened. Using the chord from t = 0 (where h = 0.5) to t = 11 instead gives 2.92 − 0.5 = 2.42, and 2.42 ÷ 11 = 0.22, which is the average gradient over the whole 11 minutes, not the instantaneous rate at t = 10. Substituting t = 10 into the formula gives 0.02 × 100 + 0.5 = 2.50, which is the height of the water at that moment, not the rate at which the height is rising. The estimated instantaneous rate of change at t = 10 is 0.40 m/min.
- (d) 1.5 — Method: the length scale factor is the square root of the area scale factor, not the area scale factor itself. Working: the area scale factor is 45 ÷ 20 = 2.25, and the square root of 2.25 is 1.5. Answer: 1.5. Nadia's answer, 2.25, is the AREA scale factor — she never took the square root to get back to the length scale factor. 4.5 comes from doubling the area scale factor instead of taking its square root. 0.67 comes from taking the square root in the wrong direction, finding the scale factor from the larger rug to the smaller rug instead of the other way round.
- (b) 25 m/s — Convert km/h to m/s by multiplying by 1000 (km to m) and dividing by 3600 (hours to seconds): 90 × 1000 ÷ 3600 = 25 m/s. Working out 90 ÷ 60 = 1.5 converts using 60, as if going from hours to minutes rather than to seconds. Working out 90 × 3.6 = 324 multiplies by 3.6 instead of dividing by it, going the wrong way between the units. Working out 90 × 1000 = 90000 converts kilometres to metres but forgets to convert hours to seconds at all. The train's speed is 25 m/s.
- (c) £7617.60 — To decrease by 8% each year, multiply by 0.92 (100% − 8%) twice. £9000 × 0.92 × 0.92 = £7617.60. £7560.00 comes from treating the two 8% decreases as a single flat 16% decrease applied once instead of compounding: £9000 × 0.84 = £7560.00. £8280.00 comes from applying the 8% decrease only once, for 1 year instead of 2: £9000 × 0.92 = £8280.00. £10497.60 comes from multiplying by 1.08 twice, increasing the value instead of decreasing it: £9000 × 1.08 × 1.08 = £10497.60.
- (a) 11:00 to 12:00 — Method: the instantaneous rate of change is zero at a turning point, where a rising trend becomes a falling trend; that lies within the first interval whose difference has changed sign from the interval before it. Working: the differences between consecutive readings are +3.4 °C (09:00 to 10:00), +1.7 °C (10:00 to 11:00), −0.3 °C (11:00 to 12:00) and −2.6 °C (12:00 to 13:00); the sign changes from positive to negative within 11:00 to 12:00, since the temperature is still rising up to 11:00 (20.1 °C, the highest recorded value) and has fallen by 12:00, so the instantaneous rate of change was zero somewhere within that interval. Choosing 09:00 to 10:00 picks out the interval with the largest positive difference, +3.4 °C, confusing the fastest rise with no change at all. Choosing 10:00 to 11:00 picks the last interval where the temperature was still rising, one interval too early, without checking that the very next interval turns negative. Choosing 12:00 to 13:00 picks out the interval with the largest-magnitude difference, −2.6 °C, the fastest fall, not where the change is zero. Zero instantaneous rate of change happens at a turning point, where the readings stop rising and start falling — find the FIRST interval whose difference has flipped sign from the one before it, not the biggest change or an interval where the old sign still held.
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
- (b) 4 : 25 — For similar shapes, the ratio of areas is the ratio of lengths squared: 2² : 5² = 4 : 25. 2 : 5 comes from using the perimeter ratio itself as the area ratio, without squaring it at all. 8 : 125 comes from cubing each part instead of squaring (2³ : 5³) — cubing is the rule for volume, not area. 4 : 5 comes from squaring only the first part of the ratio (2² = 4), and leaving the second part unsquared.
- (b) £13,860 — Method: apply the first year's percentage decrease, then apply the second year's percentage decrease to the new value. Working: after the first year, the car is worth £17,500 × 0.88. Multiplying this result by 0.90 gives the value at the end of the second year, £13,860. Answer: £13,860. £13,650 comes from adding the two percentages together (12% + 10% = 22%) and applying a single 22% decrease, £17,500 × 0.78 = £13,650, instead of applying the decreases one after the other. £15,750 comes from applying only the second year's 10% decrease to the original price, forgetting the first year's decrease entirely, £17,500 × 0.90 = £15,750. £15,400 comes from applying only the first year's 12% decrease and stopping there, forgetting to apply the second year's decrease at all.
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (c) 54 — Method: y = kx, so k = y ÷ x. Working: k = 18 ÷ 5 = 3.6. At x = 15: y = 3.6 × 15 = 54. Wrong options: 28 comes from adding the change in x (10) onto y instead of scaling; 6 comes from treating the relationship as inverse proportion (k = 5 × 18 = 90, then y = 90 ÷ 15 = 6); 60 comes from rounding the constant up to 4 instead of using 3.6.
- (d) 4 years — Apply the recurrence repeatedly. V_1 = 0.85 × 18000 = 15300. V_2 = 0.85 × 15300 = 13005. V_3 = 0.85 × 13005 = 11054.25. V_4 = 0.85 × 11054.25 = 9396.1125. V_3 = £11054.25 is still above £10000, but V_4 = £9396.11 has dropped below it, so the answer is 4 years. Stopping at V_3 and calling it '3 years' misreads £11054.25 as already below £10000, or comes from wrongly modelling the fall as a flat £2700 a year (15% of the original value each time, without compounding), which crosses £10000 a year too early. Continuing one extra step to V_5 = 0.85 × 9396.1125 = 7986.70 and calling it '5 years' overshoots, since the value had already dropped below £10000 at V_4. Doubling the percentage decrease to 30% by mistake gives V_1 = 0.7 × 18000 = 12600, then V_2 = 0.7 × 12600 = 8820, which is already below £10000 after only 2 years — the wrong rate crosses the threshold too fast.
- (a) 28.8 km/h — Method: first change metres per second into metres per hour, then change metres into kilometres. Working: 8 × 3600 = 28800 metres per hour, then 28800 ÷ 1000 = 28.8 km/h. So the runner's speed is 28.8 km/h. Distractor 28800 km/h comes from stopping after the first step and forgetting to change metres into kilometres. Distractor 2.22 km/h comes from dividing by 3600 instead of multiplying, then multiplying by 1000. Distractor 2.88 km/h comes from using 360 instead of 3600 seconds in an hour, missing a zero.
- (a) 12 — Speed × time is constant: k = 20 × 15 = 300. At 25 pages per minute, the time is 300 ÷ 25 = 12 minutes. Getting 18.75 comes from treating speed and time as directly proportional and working out 15 × 25 ÷ 20 instead of dividing k by the new speed. Getting 20 comes from adding the increase in speed (25 − 20 = 5) onto the time (15 + 5 = 20). Getting 10 comes from subtracting that same increase in speed from the time (15 − 5 = 10).
- (b) Provider Y — £21.00 against Provider X's £23.00 — Provider X's gradient is (35 − 15) ÷ 100 = 0.2, so cost = 15 + 0.2 × 40 = 15 + 8 = £23.00. Provider Y's gradient is (45 − 5) ÷ 100 = 0.4, so cost = 5 + 0.4 × 40 = 5 + 16 = £21.00. £21.00 is less than £23.00, so Provider Y is cheaper: 'Provider Y — £21.00 against Provider X's £23.00'. Getting both costs right but naming Provider X as cheaper compares the two numbers the wrong way round — £23.00 is more than £21.00, not less. Comparing only the fixed fees, £15.00 and £5.00, ignores the cost of the 40 gigabytes actually used. Reading off the costs at 100 gigabytes, £35.00 and £45.00, directly from the graph answers a different usage from the 40 gigabytes the question asks about.
Build your own mix at the worksheet builder.