Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) 4 m/s — The average rate of change of distance with respect to time over an interval is the change in distance divided by the change in time — the gradient of the chord joining the two endpoints, not the gradient of any tangent inside the interval. From t = 3 to t = 8 the change in time is 8 − 3 = 5 and the change in distance is 32 − 12 = 20, so the average speed is 20 ÷ 5 = 4 m/s. Reporting the change in distance on its own, as 20 m/s, is not a speed: those 20 metres were covered over the whole 5 seconds, not in one second, so the 20 still has to be divided by the 5. The tangent's gradient of 3 m/s is the instantaneous speed at the single moment t = 6, not the average over the whole 5-second interval, so it must not be used here. Adding the change in distance and the change in time instead of dividing gives 20 + 5 = 25, which is not a speed. The average speed of the cyclist over the interval is 4 m/s.
- (b) 1:12 — C = 12n means that for every 1 pen there are 12 pence of cost, so n : C = 1 : 12, and the highest common factor of 1 and 12 is 1, so this is already in its simplest form. Writing C : n instead of n : C gives 12 : 1, the ratio the wrong way round. Reading C = 12n as '12 more than n' instead of '12 times n', so n = 1 gives C = 13, gives 1 : 13, from adding instead of multiplying. Choosing n = 12, so C = 12 × 12 = 144, gives the correct pair of values n : C = 12 : 144, but the ratio the right way round left unsimplified — 12 and 144 share a common factor of 12, which has not been cancelled.
- (c) 48 mm — Method: extension = k × force, where k = extension ÷ force. Working: k = 12 ÷ 5 = 2.4 mm per N. At 20 N: extension = 2.4 × 20 = 48 mm. Wrong options: 32 mm comes from adding the extension and force numbers instead of scaling (12 + 20); 3 mm comes from treating the relationship as inverse proportion (12 × 5 ÷ 20); 36 mm comes from using an incorrect scale factor of 3 between the forces instead of the correct factor of 4 (20 ÷ 5).
- (b) 1 : 500 — smallest real distance per cm (5 m), most detail — Method: compare what one centimetre represents in real life for each scale — the scale with the smallest real distance per cm shows the most detail. Working: for 1 : 500, 1 cm represents 500 cm (5 m); for 1 : 5000, 1 cm represents 50 m; for 1 : 50 000, 1 cm represents 500 m. Since 5 m is the smallest, 1 : 500 shows the most detail. Wrong options: '1 : 50 000 — covers the largest real area' wrongly assumes covering more area means more detail, when it is the opposite; '1 : 5000 — the middle value' wrongly assumes the middle scale is automatically the most balanced; '1 : 500 — covers the largest real distance' picks the correct scale but states an incorrect fact, since 1 : 500 actually covers the smallest real distance per cm.
- (d) 20 km/h — Method: average speed = total distance ÷ total time, with the time written in hours. Working: 1 hour 30 minutes = 1.5 hours, and 30 ÷ 1.5 = 20. Answer: 20 km/h. The distractors: 45 km/h comes from multiplying 30 by 1.5 instead of dividing; 15 km/h comes from dividing by 2, as if the ride had taken 2 hours; 30 km/h comes from dividing by the whole hour only and ignoring the extra 30 minutes.
- (c) Height rising at 2 m/s at t = 1.5 s — A tangent's gradient on a height-time graph is the instantaneous rate of change of height, in metres per second, so gradient 2 means the ball's height is increasing at 2 m/s at t = 1.5 s. Saying the height 'is 2 m' confuses the gradient, a rate, with the y-value on the graph, which is the ball's height itself. Saying the ball 'travelled 2 m from t = 1 to t = 2' treats the instantaneous gradient at one instant as if it were the total distance risen over a whole one-second interval, which is a different quantity found from two height readings, not from one tangent. Saying the speed 'is 2 m/s²' uses the wrong units — m/s² measures acceleration, the rate of change of speed, not speed itself. Always check that the units quoted match what a height-time graph's gradient can actually give you: metres per second.
- (c) 448.00 US dollars — Method: multiply the amount in pounds by the exchange rate. Working: £350 × 1.28 = 448.00 US dollars. Wrong options: 273.44 US dollars comes from dividing by the rate instead of multiplying (350 ÷ 1.28); 351.28 US dollars comes from adding the rate to the amount instead of multiplying; 4,480.00 US dollars comes from a decimal-point slip, using 12.8 instead of 1.28.
- (b) The 2.4 kg bag, since it costs £1.80 per kg compared with £1.90 per kg for the 1.5 kg bag. — To compare value for money, work out the cost per kilogram for each bag. 1.5 kg bag: £2.85 ÷ 1.5 = £1.90 per kg. 2.4 kg bag: £4.32 ÷ 2.4 = £1.80 per kg. Since £1.80 is less than £1.90, the 2.4 kg bag gives better value. The option comparing £2.85 with £4.32 directly is wrong because it compares the total prices, not the price per kilogram — a bigger bag naturally costs more in total even if it is better value. The option that names the 1.5 kg bag with £1.80 per kg and the 2.4 kg bag with £1.90 per kg has the correct unit prices but has swapped which bag they belong to. The option giving £1.19 per kg and £2.88 per kg comes from dividing each price by the wrong bag's mass (£2.85 ÷ 2.4 and £4.32 ÷ 1.5).
- (a) £14224 — Value after 2 years: £15000 × 1.04 × 1.04 = £16224. Money left after buying the trailer: £16224 − £2000 = £14224. £14200 comes from treating the two 4% increases as a single flat 8% increase applied once instead of compounding: £15000 × 1.08 = £16200, and £16200 − £2000 = £14200. £13600 comes from applying the 4% increase only once, for 1 year instead of 2: £15000 × 1.04 = £15600, and £15600 − £2000 = £13600. £18224 comes from adding the £2000 instead of subtracting it: £16224 + £2000 = £18224.
- (b) £13,860 — Method: apply the first year's percentage decrease, then apply the second year's percentage decrease to the new value. Working: after the first year, the car is worth £17,500 × 0.88. Multiplying this result by 0.90 gives the value at the end of the second year, £13,860. Answer: £13,860. £13,650 comes from adding the two percentages together (12% + 10% = 22%) and applying a single 22% decrease, £17,500 × 0.78 = £13,650, instead of applying the decreases one after the other. £15,750 comes from applying only the second year's 10% decrease to the original price, forgetting the first year's decrease entirely, £17,500 × 0.90 = £15,750. £15,400 comes from applying only the first year's 12% decrease and stopping there, forgetting to apply the second year's decrease at all.
- (b) 5/7 — The enlargement multiplier is 1.4, which as a fraction is 7/5. To reverse an enlargement, use the reciprocal of the multiplier: flip 7/5 to get 5/7. 7/5 comes from using the enlargement multiplier again, instead of reversing it. 3/5 comes from treating the reverse as 'give back the extra amount', working out 1 − (1.4 − 1) = 0.6, instead of using the reciprocal. 5/2 comes from ignoring the whole number in 1.4 and inverting only the decimal part, 0.4, as if it were the whole multiplier.
- (c) £338.69 — To increase by 12% each year, multiply by 1.12 twice. £270 × 1.12 × 1.12 = £338.688, which rounds to £338.69 (nearest penny, since the third decimal place is 8). £334.80 comes from treating the two 12% increases as a single flat 24% increase applied once instead of compounding: £270 × 1.24 = £334.80. £302.40 comes from applying the 12% increase only once, for 1 year instead of 2: £270 × 1.12 = £302.40. £338.68 comes from rounding £338.688 down to the nearest penny instead of up.
- (d) 24.6 km/h — Average speed = distance ÷ time, with time in hours. 47 minutes = 47 ÷ 60 hours. 19.3 ÷ (47 ÷ 60) = 19.3 ÷ 47 × 60 = 24.638…, which rounds to 24.6 km/h (1 d.p.). 0.4 km/h comes from dividing the distance by 47 and treating the result as km/h directly, without converting the minutes to hours at all. 41.1 km/h comes from converting minutes to hours by dividing by 100 instead of 60 (19.3 ÷ 47 × 100). 0.3 km/h comes from dividing the distance by 60 instead of converting the 47 minutes to hours first.
- (d) 0.40 m/min — To estimate an instantaneous rate of change at a point without a diagram, use the gradient of a chord joining two points close to it, one on each side. At t = 9: 0.02 × 81 = 1.62, so h = 1.62 + 0.5 = 2.12. At t = 11: 0.02 × 121 = 2.42, so h = 2.42 + 0.5 = 2.92. The change in height is 2.92 − 2.12 = 0.80 and the change in time is 11 − 9 = 2, so the gradient of the chord is 0.80 ÷ 2 = 0.40. Reporting the change in height, 0.80, on its own is not a rate, because it has not been divided by the 2 minutes over which it happened. Using the chord from t = 0 (where h = 0.5) to t = 11 instead gives 2.92 − 0.5 = 2.42, and 2.42 ÷ 11 = 0.22, which is the average gradient over the whole 11 minutes, not the instantaneous rate at t = 10. Substituting t = 10 into the formula gives 0.02 × 100 + 0.5 = 2.50, which is the height of the water at that moment, not the rate at which the height is rising. The estimated instantaneous rate of change at t = 10 is 0.40 m/min.
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
Build your own mix at the worksheet builder.