- (c) £2743.60 — Each year the balance is multiplied by 1.03. After the first year: 4000 × 1.03 = 4120. After the second year: 4120 × 1.03 = 4243.60, so that is what Leah takes out. She then spends £1500 of it, which leaves 4243.60 − 1500 = 2743.60. She has £2743.60 left.
- (a) 28.8 km/h — Method: first change metres per second into metres per hour, then change metres into kilometres. Working: 8 × 3600 = 28800 metres per hour, then 28800 ÷ 1000 = 28.8 km/h. So the runner's speed is 28.8 km/h. Distractor 28800 km/h comes from stopping after the first step and forgetting to change metres into kilometres. Distractor 2.22 km/h comes from dividing by 3600 instead of multiplying, then multiplying by 1000. Distractor 2.88 km/h comes from using 360 instead of 3600 seconds in an hour, missing a zero.
- (c) £840 — Method: find the total amount raised using the reverse percentage, then subtract the entry fees to find the donations. Working: £1,260 is 60% of the total, so the total is £1,260 ÷ 0.6, and subtracting the entry fees from this total leaves £840 raised through donations. Answer: £840. £2,100 comes from correctly finding the total amount raised but then forgetting to subtract the entry fees, giving the total instead of the donations alone. £504 comes from working out 40% of the entry fees themselves, £1,260 × 0.4 = £504, instead of first finding the total amount raised. £1,890 comes from treating £1,260 as 40% of the total instead of 60%, dividing by 0.4 to get a total of £3,150, and then subtracting the entry fees from that incorrect total.
- (a) 4 hours — This is inverse proportion: more pumps take less time. Multiply the original numbers to find the total pump-hours needed: 2 × 10 = 20 pump-hours. Divide by the new number of pumps: 20 ÷ 5 = 4 hours. Working out 10 × 5 ÷ 2 = 25 hours treats it as direct proportion, as if more pumps needed more time. Stopping at 20 gives the total pump-hours, not the number of hours. Working out 10 − (5 − 2) = 7 hours subtracts the extra number of pumps straight from the number of hours, treating pumps and hours as the same kind of quantity. 5 pumps take 4 hours.
- (d) 36 mph — First convert 1 hour 30 minutes to hours: 30 minutes is half an hour, so the time is 1.5 hours. Then divide the distance by the time: 54 ÷ 1.5 = 36 mph. Reading 1 hour 30 minutes as 1.3 hours (writing the minutes after the decimal point instead of as a fraction of 60) gives 54 ÷ 1.3 ≈ 41.54 mph. Working out 54 ÷ 30 = 1.8 divides by the number of minutes only, ignoring the hour. Working out 54 × 1.5 = 81 multiplies by the time instead of dividing. The coach's average speed is 36 mph.
- (c) 4 m/s — The average rate of change of distance with respect to time over an interval is the change in distance divided by the change in time — the gradient of the chord joining the two endpoints, not the gradient of any tangent inside the interval. From t = 3 to t = 8 the change in time is 8 − 3 = 5 and the change in distance is 32 − 12 = 20, so the average speed is 20 ÷ 5 = 4 m/s. Reporting the change in distance on its own, as 20 m/s, is not a speed: those 20 metres were covered over the whole 5 seconds, not in one second, so the 20 still has to be divided by the 5. The tangent's gradient of 3 m/s is the instantaneous speed at the single moment t = 6, not the average over the whole 5-second interval, so it must not be used here. Adding the change in distance and the change in time instead of dividing gives 20 + 5 = 25, which is not a speed. The average speed of the cyclist over the interval is 4 m/s.
- (d) 250 cm³/s — Method: first change litres per minute into cm³ per minute, then change per minute into per second. Working: 15 × 1000 = 15000 cm³ per minute, then 15000 ÷ 60 = 250 cm³ per second. So the tank fills at 250 cm³ per second. Distractor 15000 cm³/s comes from stopping after the first step and forgetting to change minutes into seconds. Distractor 900000 cm³/s comes from multiplying by 60 instead of dividing. Distractor 2500 cm³/s comes from dividing by 6 instead of 60.
- (b) Day 3 to Day 4 — Method: the average rate of increase between two consecutive days is the difference in the number of orders divided by the number of days between them, which here is just the difference itself, since each gap is one day; comparing all four differences finds which is greatest. Working: the differences are 1,509 − 1,284 = 225 (Day 1 to Day 2), 1,830 − 1,509 = 321 (Day 2 to Day 3), 2,296 − 1,830 = 466 (Day 3 to Day 4), and 2,510 − 2,296 = 214 (Day 4 to Day 5); 466 is the greatest of the four, so the rate of increase was greatest from Day 3 to Day 4. Choosing Day 4 to Day 5 comes from picking the interval that ends on the highest total number of orders, 2,510, confusing the SIZE of the total with the RATE at which it grew. Choosing Day 1 to Day 2 comes from assuming the rate must be greatest at the very start, without working out any of the four differences. Choosing Day 2 to Day 3 comes from comparing only the first two differences, 225 and 321, and stopping there without checking Day 3 to Day 4 or Day 4 to Day 5. Finding the greatest rate of change from a table always means computing every difference between consecutive values and comparing them all — the day with the highest total, or the first pair you check, is not a shortcut.
- (d) 4.7 km — Multiply the map length by the scale factor: 9.4 × 50 000 = 470 000 cm. Convert to kilometres: 470 000 cm = 4700 m = 4.7 km. Converting only to metres and calling the answer 4700 kilometres mistakes metres for kilometres. Misreading the scale as 1 : 5000 instead of 1 : 50 000, 9.4 × 5000 = 47 000 cm = 0.47 km, is ten times too small. Misplacing the decimal point in 9.4 and effectively using 94, 94 × 50 000 = 4 700 000 cm = 47 km, is ten times too big.
- (b) 7.2 m — Multiply the model wingspan by the scale factor: 15 × 48 = 720. This is in centimetres, and 720 cm = 7.2 m, since 1 m = 100 cm. Giving 0.31 m divides by the scale factor instead of multiplying (15 ÷ 48 ≈ 0.31), scaling the model down rather than the real aircraft up. Giving 72 m converts centimetres to metres by dividing by 10 instead of 100. Giving 0.72 m converts by dividing by 1000 instead of 100.
- (b) £250 — Since cost is proportional to the cube of the radius, C = kr³. Using r = 3, C = 54: 3³ = 27, so 54 = k × 27, giving k = 54 ÷ 27 = 2. The equation is C = 2r³. When r = 5: 5³ = 125, so C = 2 × 125 = 250. Treating the relationship as proportional to r² instead of r³ gives k = 54 ÷ 9 = 6 and then C = 6 × 25 = 150, which models area scaling, not volume scaling. Treating it as proportional to r itself gives k = 54 ÷ 3 = 18 and then C = 18 × 5 = 90. Finding k correctly from the cube but then multiplying it by the radius instead of by the cube of the radius gives 2 × 5 = 10, which applies the right constant to the wrong power of r. The cost of a container of radius 5 cm is £250.
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (d) 4 years — Apply the recurrence repeatedly. V_1 = 0.85 × 18000 = 15300. V_2 = 0.85 × 15300 = 13005. V_3 = 0.85 × 13005 = 11054.25. V_4 = 0.85 × 11054.25 = 9396.1125. V_3 = £11054.25 is still above £10000, but V_4 = £9396.11 has dropped below it, so the answer is 4 years. Stopping at V_3 and calling it '3 years' misreads £11054.25 as already below £10000, or comes from wrongly modelling the fall as a flat £2700 a year (15% of the original value each time, without compounding), which crosses £10000 a year too early. Continuing one extra step to V_5 = 0.85 × 9396.1125 = 7986.70 and calling it '5 years' overshoots, since the value had already dropped below £10000 at V_4. Doubling the percentage decrease to 30% by mistake gives V_1 = 0.7 × 18000 = 12600, then V_2 = 0.7 × 12600 = 8820, which is already below £10000 after only 2 years — the wrong rate crosses the threshold too fast.
- (d) 3:8 — Convert 2 hours to minutes: 2 hours = 120 minutes. The ratio is 45 : 120. The highest common factor of 45 and 120 is 15. Divide both parts by 15: 45 ÷ 15 = 3 and 120 ÷ 15 = 8, giving 3 : 8. Leaving the hours unconverted gives 45 : 2 — the units on each side are different, so this does not compare like with like. Dividing by 5 instead of 15 gives 9 : 24, which still shares a common factor of 3, so it is not fully simplified. Swapping the order gives 8 : 3, hours to minutes instead of minutes to hours.
- (c) £3,200 — Method: find the value of one part of the ratio from the first investor's amount, then work out the second investor's share before adding both together. Working: £1,200 is 3 parts, so one part is £1,200 ÷ 3 = £400. The second investor's share is 5 × £400 = £2,000, and the total is £1,200 + £2,000 = £3,200. So the total invested is £3,200. Distractor £2,000 is only the second investor's share, without adding the first investor's £1,200. Distractor £2,400 comes from doubling the first investor's amount instead of using the ratio. Distractor £6,000 comes from multiplying £1,200 by 5 directly instead of first finding the value of one part.