- (d) 4 years — Apply the recurrence repeatedly. V_1 = 0.85 × 18000 = 15300. V_2 = 0.85 × 15300 = 13005. V_3 = 0.85 × 13005 = 11054.25. V_4 = 0.85 × 11054.25 = 9396.1125. V_3 = £11054.25 is still above £10000, but V_4 = £9396.11 has dropped below it, so the answer is 4 years. Stopping at V_3 and calling it '3 years' misreads £11054.25 as already below £10000, or comes from wrongly modelling the fall as a flat £2700 a year (15% of the original value each time, without compounding), which crosses £10000 a year too early. Continuing one extra step to V_5 = 0.85 × 9396.1125 = 7986.70 and calling it '5 years' overshoots, since the value had already dropped below £10000 at V_4. Doubling the percentage decrease to 30% by mistake gives V_1 = 0.7 × 18000 = 12600, then V_2 = 0.7 × 12600 = 8820, which is already below £10000 after only 2 years — the wrong rate crosses the threshold too fast.
- (b) 12 — Since y is directly proportional to √x, y = k√x. Using x = 4, y = 8: √4 = 2, so 8 = k × 2, giving k = 8 ÷ 2 = 4. The equation is y = 4√x. When x = 9: √9 = 3, so y = 4 × 3 = 12. Treating the relationship as if y were proportional to x itself, rather than to √x, gives k = 8 ÷ 4 = 2 and then y = 2 × 9 = 18, which is a different relationship. Multiplying k by the new x-value instead of by its square root gives y = 4 × 9 = 36, skipping the square root altogether. Reporting √9 on its own, without multiplying by k, gives only 3, not the value of y. When x = 9, y = 12.
- (a) 3.375 — Method: the volume scale factor between similar shapes is the length scale factor cubed, not the length scale factor itself. Working: the length scale factor is 12 ÷ 8 = 1.5, and 1.5³ = 3.375. Answer: 3.375. Jayden's answer, 1.5, is only the LENGTH scale factor — he never cubed it to get the volume scale factor. 2.25 comes from squaring the length scale factor instead of cubing it, which would give the area scale factor. 4.5 comes from multiplying the length scale factor by 3 (the number of dimensions) instead of cubing it.
- (d) 120 g — Mass = density × volume, so 0.8 × 150 = 120 g. Working out 150 ÷ 0.8 = 187.5 divides by the density instead of multiplying, the wrong way round for finding a mass. Working out 150 × 8 = 1200 misplaces the decimal point in the density, treating 0.8 g/cm³ as 8 g/cm³. Working out 150 − 0.8 = 149.2 simply subtracts the density from the volume, which does not give a mass. The piece of wood has a mass of 120 g.
- (b) 4.5 m² — The height ratio is 40 : 60, which simplifies to 2 : 3, so the larger bookcase is 1.5 times as tall as the smaller one. Areas scale with the square of the length scale factor, so the wood needed scales by 1.5² = 2.25. 2 × 2.25 = 4.5, so the larger bookcase needs 4.5 m² of wood. Giving 3 m² uses the length scale factor, 1.5, without squaring it (2 × 1.5 = 3). Giving 6.75 m² cubes the scale factor, 1.5³ = 3.375, as if wood coverage were a volume (2 × 3.375 = 6.75). Giving 2.25 m² is the squared scale factor on its own, without multiplying by the smaller bookcase's wood area of 2 m².
- (c) 16 cm — Corresponding sides of similar triangles are all in the same ratio. Use the pair whose lengths are both known: the scale factor from triangle ABC to triangle PQR is 12 ÷ 6 = 2. Since QR corresponds to BC, multiply BC by that scale factor: 8 × 2 = 16, so QR = 16 cm.
- (a) £150 — Value after year 1: £800 × 0.75 = £600. Value after year 2: £600 × 0.75 = £450. The loss during the second year alone is £600 − £450 = £150. £450 comes from giving the value remaining after 2 years, not the amount lost during the second year. £200 comes from working out the loss during the first year instead of the second: £800 − £600 = £200. £350 comes from working out the total loss over both years instead of just the second year's loss: £800 − £450 = £350.
- (d) 3/2 — Work out the number of altos: 40% of 30 = 12. The rest are sopranos, so there are 30 − 12 = 18 sopranos. Form the fraction 18/12; both numbers share a factor of 6, so 18 ÷ 6 = 3 and 12 ÷ 6 = 2, giving 3/2. 2/3 comes from writing the fraction the wrong way round, as altos over sopranos (12/18). 3/5 comes from comparing the sopranos with the whole choir (18/30), instead of with the altos. 7/3 comes from miscalculating 30 − 12 as 28 instead of 18, then forming 28/12.
- (d) £5.40 — Method: work out the reduced price at each shop separately, then subtract the smaller from the larger. Working: Shop A's reduced price is £45 × 0.8 = £36, and Shop B's reduced price is £34 × 0.9 = £30.60, so the difference is £36 − £30.60 = £5.40. Answer: £5.40. £11.00 comes from comparing the two ORIGINAL prices, £45 − £34, without applying either shop's reduction at all. £1.60 comes from finding Shop A's reduced price correctly, £36, but then subtracting Shop B's original (unreduced) price of £34 instead of its reduced price. £66.60 comes from adding the two reduced prices together, £36 + £30.60, instead of subtracting them.
- (d) 7/3 — Put the kettle's energy over the toaster's energy: 2.1/0.9. Multiply both numbers by 10 to clear the decimals: 21/9. Divide both by their highest common factor, 3: 21÷3 = 7, 9÷3 = 3, giving 7/3. (3/7 comes from writing the energy values the wrong way round. 4/3 comes from finding the difference, 2.1 − 0.9 = 1.2 kWh, and writing it as a fraction of the toaster's energy, 1.2/0.9. 7/10 comes from comparing the kettle's energy to the total energy used by both appliances, 2.1/3.0.)
- (d) 20 km/h — Method: average speed = total distance ÷ total time, with the time written in hours. Working: 1 hour 30 minutes = 1.5 hours, and 30 ÷ 1.5 = 20. Answer: 20 km/h. The distractors: 45 km/h comes from multiplying 30 by 1.5 instead of dividing; 15 km/h comes from dividing by 2, as if the ride had taken 2 hours; 30 km/h comes from dividing by the whole hour only and ignoring the extra 30 minutes.
- (b) 7.2 m — Multiply the model wingspan by the scale factor: 15 × 48 = 720. This is in centimetres, and 720 cm = 7.2 m, since 1 m = 100 cm. Giving 0.31 m divides by the scale factor instead of multiplying (15 ÷ 48 ≈ 0.31), scaling the model down rather than the real aircraft up. Giving 72 m converts centimetres to metres by dividing by 10 instead of 100. Giving 0.72 m converts by dividing by 1000 instead of 100.
- (a) 6 — Since y is inversely proportional to x², y = k/x². Using x = 2, y = 45: 2² = 4, so 45 = k ÷ 4, giving k = 45 × 4 = 180. The equation is y = 180/x². When y = 5: x² = 180 ÷ 5 = 36, so x = 6, taking the positive root because the question states that x is positive. Treating the relationship as inversely proportional to x itself gives k = 45 × 2 = 90 and then x = 90 ÷ 5 = 18, a different relationship. Multiplying by y instead of dividing by it when isolating x² gives x² = 180 × 5 = 900 and x = 30, the wrong operation. Stopping at x² = 36 without taking the square root leaves 36, not the value of x. When y = 5, x = 6.
- (a) 5/12 — Work out the distance still to travel: 372 − 217 = 155 miles. Form the fraction 155/372; both numbers share a factor of 31, so 155 ÷ 31 = 5 and 372 ÷ 31 = 12, giving 5/12. 7/12 comes from writing the distance already travelled as the fraction of the journey (217/372 = 7/12), instead of the distance still to travel. 145/372 comes from miscalculating 372 − 217 as 145 instead of 155. 5/7 comes from comparing the remaining distance with the distance already travelled (155/217 = 5/7), instead of with the total journey.
- (a) 24 N/m² — Pressure = force ÷ area. 68.4 ÷ 2.85 = 24 N/m². 194.94 N/m² comes from multiplying the force by the area instead of dividing (68.4 × 2.85). 65.55 N/m² comes from subtracting the area from the force (68.4 − 2.85) instead of dividing. 0.04 N/m² comes from dividing the area by the force instead of the force by the area (2.85 ÷ 68.4).