Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 2748 — A 7% increase each year means the value becomes 100% + 7% = 107% of the previous year's value, and 107% = 1.07, so the multiplier is 1.07. Multiply by 1.07 for each of the 2 years: 2400 × 1.07 × 1.07 = 2747.76, which rounds to 2748. (2736 comes from using simple growth instead of compound: 2400 + 2 × (2400 × 0.07) = 2736. 2568 is the population after only 1 year, 2400 × 1.07, forgetting the second year's growth. 2747 comes from rounding 2747.76 down instead of up to the nearest whole number.)
- (a) 5/12 — Work out the distance still to travel: 372 − 217 = 155 miles. Form the fraction 155/372; both numbers share a factor of 31, so 155 ÷ 31 = 5 and 372 ÷ 31 = 12, giving 5/12. 7/12 comes from writing the distance already travelled as the fraction of the journey (217/372 = 7/12), instead of the distance still to travel. 145/372 comes from miscalculating 372 − 217 as 145 instead of 155. 5/7 comes from comparing the remaining distance with the distance already travelled (155/217 = 5/7), instead of with the total journey.
- (c) 90 cm² — The perimeter ratio is 30 : 45, which simplifies to 2 : 3, so the larger frame is 1.5 times the perimeter of the smaller one. Areas scale with the square of this length scale factor: 1.5² = 2.25. 40 × 2.25 = 90, so the larger frame has an area of 90 cm². Giving 60 cm² uses the scale factor, 1.5, without squaring it (40 × 1.5 = 60). Giving 135 cm² cubes the scale factor, 1.5³ = 3.375, as if area scaled like a volume (40 × 3.375 = 135). Giving 2.25 cm² is the squared scale factor on its own, without multiplying by the smaller frame's area of 40 cm².
- (d) 500 ml — Varnish covers a surface, so the amount needed scales with the area scale factor, which is the square of the length scale factor. The length scale factor is 50 ÷ 20 = 2.5, so the area scale factor is 2.5 × 2.5 = 6.25. The varnish needed for the larger statue is 80 × 6.25 = 500 ml. Using 2.5 on its own would scale a length, not a surface.
- (b) Day 3 to Day 4 — Method: the average rate of increase between two consecutive days is the difference in the number of orders divided by the number of days between them, which here is just the difference itself, since each gap is one day; comparing all four differences finds which is greatest. Working: the differences are 1,509 − 1,284 = 225 (Day 1 to Day 2), 1,830 − 1,509 = 321 (Day 2 to Day 3), 2,296 − 1,830 = 466 (Day 3 to Day 4), and 2,510 − 2,296 = 214 (Day 4 to Day 5); 466 is the greatest of the four, so the rate of increase was greatest from Day 3 to Day 4. Choosing Day 4 to Day 5 comes from picking the interval that ends on the highest total number of orders, 2,510, confusing the SIZE of the total with the RATE at which it grew. Choosing Day 1 to Day 2 comes from assuming the rate must be greatest at the very start, without working out any of the four differences. Choosing Day 2 to Day 3 comes from comparing only the first two differences, 225 and 321, and stopping there without checking Day 3 to Day 4 or Day 4 to Day 5. Finding the greatest rate of change from a table always means computing every difference between consecutive values and comparing them all — the day with the highest total, or the first pair you check, is not a shortcut.
- (a) £14224 — Value after 2 years: £15000 × 1.04 × 1.04 = £16224. Money left after buying the trailer: £16224 − £2000 = £14224. £14200 comes from treating the two 4% increases as a single flat 8% increase applied once instead of compounding: £15000 × 1.08 = £16200, and £16200 − £2000 = £14200. £13600 comes from applying the 4% increase only once, for 1 year instead of 2: £15000 × 1.04 = £15600, and £15600 − £2000 = £13600. £18224 comes from adding the £2000 instead of subtracting it: £16224 + £2000 = £18224.
- (c) 180 pages — The gradient is (9 − 24) ÷ (300 − 0) = −15 ÷ 300 = −0.05, so the cartridge uses 0.05 ml of ink per page. At p = 300 there are 9 ml left. The extra pages before the cartridge is empty is 9 ÷ 0.05 = 180 pages. Giving 9 as the answer confuses the millilitres of ink remaining with the number of pages remaining — they are different quantities with different units. Multiplying instead of dividing, 9 × 0.05 = 0.45, does not undo the rate correctly. Working out the total number of pages a full cartridge lasts, 24 ÷ 0.05 = 480 pages, answers how many pages the cartridge prints in total from full, not how many more pages it can print from the 300-page point.
- (c) 183 mg — Apply the decay, then add the new dose, once for each hour. Hour 1: 0.7 × 200 = 140, then 140 + 50 = 190. Hour 2: 0.7 × 190 = 133, then 133 + 50 = 183, so there is 183 mg after 2 hours. Forgetting the top-up dose and only applying the decay gives 0.7 × 200 = 140, then 0.7 × 140 = 98 — this ignores that a further 50 mg is given every hour. Adding the 50 mg BEFORE the decay is applied, instead of after, gives 0.7 × (200 + 50) = 175, then 0.7 × (175 + 50) = 157.5, which changes how much of the dose is eliminated in the same hour it is given. Multiplying by 0.3, the percentage ELIMINATED, instead of by 0.7, the percentage REMAINING, gives 0.3 × 200 + 50 = 110, then 0.3 × 110 + 50 = 83 — this mixes up the amount that leaves the bloodstream with the amount that stays in it. Always check whether a percentage describes what remains or what is removed before choosing the multiplier.
- (d) A falling curve that never touches either axis — Method: inverse proportion means the product of the two quantities is constant, so P = k ÷ Q; as Q grows P shrinks, and P can never reach zero because k divided by a number is never zero. Working: taking k = 12 as an example, the pairs (1, 12), (2, 6), (3, 4), (6, 2) and (12, 1) drop steeply at first and then flatten out, so the graph is a curve that approaches both axes without meeting either of them. Answer: a falling curve that never touches either axis. The distractors: 'a straight line through the origin' is the graph of direct proportion, P = kQ, which is the opposite relationship; 'a straight line with a negative gradient' is the commonest error, reading 'P falls as Q rises' as a straight line, but on such a line P would drop by the same amount for every increase in Q and would cross the horizontal axis into negative values; 'a straight line crossing the vertical axis above zero' is a relationship of the form P = mQ + c, in which P and Q are not proportional at all.
- (d) Gradient = acceleration; area = distance travelled. — Method: on a speed–time graph, the gradient of the graph at an instant is the rate of change of speed with time, which is acceleration; the area between the graph and the time-axis over an interval is the total distance covered in that interval, because it accumulates speed × time. Working: gradient = acceleration and area = distance travelled is the correct pairing. Swapping the two quantities completely, gradient = distance travelled and area = acceleration, is the reverse of what each actually measures. Keeping gradient = acceleration correct but then also claiming area = acceleration too is wrong because the area is a different physical quantity, distance, not a second way of finding the same rate. Claiming the gradient itself gives the speed confuses the RATE OF CHANGE of the plotted quantity with the plotted quantity itself — the gradient is how fast the speed is changing, not the speed. On any rate graph, the gradient of the graph is always the RATE at that instant, and the area under the graph is always the TOTAL AMOUNT accumulated — keep straight which of the two questions each one answers.
- (a) 12 — Speed × time is constant: k = 20 × 15 = 300. At 25 pages per minute, the time is 300 ÷ 25 = 12 minutes. Getting 18.75 comes from treating speed and time as directly proportional and working out 15 × 25 ÷ 20 instead of dividing k by the new speed. Getting 20 comes from adding the increase in speed (25 − 20 = 5) onto the time (15 + 5 = 20). Getting 10 comes from subtracting that same increase in speed from the time (15 − 5 = 10).
- (c) £338.69 — To increase by 12% each year, multiply by 1.12 twice. £270 × 1.12 × 1.12 = £338.688, which rounds to £338.69 (nearest penny, since the third decimal place is 8). £334.80 comes from treating the two 12% increases as a single flat 24% increase applied once instead of compounding: £270 × 1.24 = £334.80. £302.40 comes from applying the 12% increase only once, for 1 year instead of 2: £270 × 1.12 = £302.40. £338.68 comes from rounding £338.688 down to the nearest penny instead of up.
- (d) £2.00 — Cost for Printer A = 200 × £0.04 = £8. Cost for Printer B = 200 × £0.05 = £10. Difference = £10 − £8 = £2.00.
- (d) d ÷ t — Average speed = distance ÷ time, so the expression is d ÷ t. Writing t ÷ d inverts the formula, giving the time per kilometre instead of the speed. Writing d × t confuses speed with the formula for distance travelled (distance = speed × time) used the wrong way round. Writing d + t treats the relationship as additive instead of using division.
- (a) 80 km/h — Average speed = total distance ÷ total time. Total distance = 45 + 75 = 120 km. Total time = 30 minutes + 1 hour = 1.5 hours. 120 ÷ 1.5 = 80 km/h. 60 km/h comes from treating the 30 minutes as a whole hour, giving a total time of 2 hours instead of 1.5 (120 ÷ 2). 82.5 km/h comes from averaging the two separate speeds (45 ÷ 0.5 = 90 km/h and 75 ÷ 1 = 75 km/h, then (90 + 75) ÷ 2) instead of using total distance over total time. 75 km/h comes from using only the second part of the journey (75 km in 1 hour) and ignoring the first part.
Build your own mix at the worksheet builder.