- (b) 450.00 kg — 1 m³ = 100 × 100 × 100 = 1,000,000 cm³, so 0.5 m³ = 500,000 cm³. Mass = density × volume = 0.9 × 500,000 = 450,000 g. Converting to kilograms by dividing by 1000 gives 450,000 ÷ 1000 = 450.00 kg. Skipping the m³-to-cm³ conversion and multiplying 0.9 × 0.5 = 0.45 treats the volume as if it were already 0.5 cm³, giving 0.45 kg. Finding the mass correctly in grams, 450,000 g, but not converting to kilograms leaves 450000.00 kg, out by a factor of 1000. Using the area conversion factor of 10,000, as if converting m² to cm², instead of the volume factor of 1,000,000 gives 0.5 × 10,000 = 5,000 'cm³', and a mass of 0.9 × 5,000 = 4,500 g, which is 4.50 kg.
- (a) 3.375 — Method: the volume scale factor between similar shapes is the length scale factor cubed, not the length scale factor itself. Working: the length scale factor is 12 ÷ 8 = 1.5, and 1.5³ = 3.375. Answer: 3.375. Jayden's answer, 1.5, is only the LENGTH scale factor — he never cubed it to get the volume scale factor. 2.25 comes from squaring the length scale factor instead of cubing it, which would give the area scale factor. 4.5 comes from multiplying the length scale factor by 3 (the number of dimensions) instead of cubing it.
- (c) 3 hours — Method: inverse proportion means speed × time is constant for the journey, so find that constant and divide it by the new speed. Working: 60 × 2 = 120, which is the distance in kilometres; at 40 km/h the time is 120 ÷ 40 = 3 hours. Answer: 3 hours. The distractors: 1.5 hours is the ratio of the speeds, 60 ÷ 40, given as a time instead of being used to scale the original 2 hours; 1 hour 20 minutes comes from treating time as directly proportional to speed, 2 × 40 ÷ 60, which has the slower train arriving sooner; 2 hours comes from finding the constant 120 and then dividing it by the original 60 km/h again, so the time never changes.
- (a) 46.8 km/h — Method: 1 hour = 60 minutes, so a rate given in kilometres per minute is converted to kilometres per hour by multiplying by 60. Working: 0.78 × 60 = 46.8, so the instantaneous rate of change is 46.8 kilometres per hour. Keeping the given value unchanged and only relabelling the unit gives 0.78 km/h, which ignores that the time unit has changed. Dividing by 60 instead of multiplying — as you would when converting to a larger length unit — gives 0.78 ÷ 60 = 0.013 km/h, the wrong direction for a rate measured against a larger time unit. Adding 60 to the given rate instead of multiplying by it gives 0.78 + 60 = 60.78 km/h. Converting a rate always means multiplying or dividing by the conversion factor between the units, never adding it, and the direction depends on whether the new time unit is bigger or smaller than the old one.
- (c) Map A, where the distance is 40 cm — 10 km = 1,000,000 cm. On Map A: 1000000 ÷ 25000 = 40 cm. On Map B: 1000000 ÷ 50000 = 20 cm. Since 40 cm is longer than 20 cm, the same real distance appears longer on Map A, the map with the smaller scale number. 'Map B, where the distance is 20 cm' has the correct working for Map B but names the wrong map as the one with the longer length. 'Map A, where the distance is 20 cm' correctly identifies Map A but pairs it with Map B's length. 'Map B, where the distance is 40 cm' correctly identifies Map A's length but attaches it to the wrong map.
- (d) £117.60 — Add the hours worked over the two days: 6 + 4.5 = 10.5 hours. Multiply by the rate of pay: 10.5 × £11.20 = £117.60. (£67.20 is Monday's pay only. £50.40 is Tuesday's pay only. £106.40 comes from mistakenly adding the hours as 6 + 3.5 = 9.5 — misreading Tuesday's 4.5 hours as 3.5 — and then multiplying by £11.20.)
- (a) 15.3 litres — Squash : water = 2 : 9, so water is 9 ÷ 2 = 4.5 times the amount of squash. Multiply: 3.4 × 4.5 = 15.3 litres. Using the multiplier upside down — treating squash as 9 ÷ 2 times water, when it is water that is 9 ÷ 2 times squash — and calculating 3.4 × (2 ÷ 9) gives about 0.8 litres (to 1 d.p.); that would be the squash needed for 3.4 litres of water, not the water needed for 3.4 litres of squash. Adding the difference between the ratio parts, 9 − 2 = 7, to the squash amount, 3.4 + 7 = 10.4, mistakes a ratio for a fixed extra amount. Using the total number of parts, 2 + 9 = 11, so the multiplier 11 ÷ 2 = 5.5, gives 3.4 × 5.5 = 18.7 litres — that finds the total mix from the squash amount, not the water alone.
- (d) £3.60 per component — The gradient of a cost-against-components graph has units of pounds per component, since cost is measured in pounds and the horizontal axis counts components. So 3.60 means it costs an extra £3.60 to produce one more component at that point. Calling it '£3.60 total cost' confuses the gradient, a rate, with the y-value on the graph, which is the total cost itself. Giving it as 3.60 components per pound swaps which axis is on top, giving the units of the reciprocal gradient, not the gradient itself. Turning 3.60 into a percentage invents a unit that has no basis in the graph's axes — a gradient here is a number of pounds, not a percentage. Always build the gradient's units from the two axes' own units, in the order y-axis over x-axis.
- (d) 64 — Since y is directly proportional to √x, y = k√x. Using x = 25, y = 20: √25 = 5, so 20 = k × 5, giving k = 20 ÷ 5 = 4. The equation is y = 4√x. When y = 32: √x = 32 ÷ 4 = 8, and x = 8² = 64. Stopping at √x = 8 without squaring leaves the square root of x, not x itself. Treating the relationship as if y were proportional to x itself gives k = 20 ÷ 25 = 0.8 and then x = 32 ÷ 0.8 = 40, which is a different relationship entirely. Multiplying instead of dividing when isolating √x gives √x = 32 × 4 = 128, far too large to be a square root here. When y = 32, x = 64.
- (d) 36 mph — First convert 1 hour 30 minutes to hours: 30 minutes is half an hour, so the time is 1.5 hours. Then divide the distance by the time: 54 ÷ 1.5 = 36 mph. Reading 1 hour 30 minutes as 1.3 hours (writing the minutes after the decimal point instead of as a fraction of 60) gives 54 ÷ 1.3 ≈ 41.54 mph. Working out 54 ÷ 30 = 1.8 divides by the number of minutes only, ignoring the hour. Working out 54 × 1.5 = 81 multiplies by the time instead of dividing. The coach's average speed is 36 mph.
- (d) 90 cm — Method: scale each dimension by the scale factor, then find the perimeter. Working: model height = 240 ÷ 8 = 30 cm; model width = 120 ÷ 8 = 15 cm. Perimeter = 2 × (30 + 15) = 90 cm. Wrong options: 11.25 cm comes from squaring the scale factor as if finding an area (720 ÷ 64); 510 cm comes from scaling only one dimension and leaving the other at full size; 720 cm comes from finding the real perimeter (2 × (240 + 120)) but forgetting to scale it down at all.
- (b) Provider Y — £21.00 against Provider X's £23.00 — Provider X's gradient is (35 − 15) ÷ 100 = 0.2, so cost = 15 + 0.2 × 40 = 15 + 8 = £23.00. Provider Y's gradient is (45 − 5) ÷ 100 = 0.4, so cost = 5 + 0.4 × 40 = 5 + 16 = £21.00. £21.00 is less than £23.00, so Provider Y is cheaper: 'Provider Y — £21.00 against Provider X's £23.00'. Getting both costs right but naming Provider X as cheaper compares the two numbers the wrong way round — £23.00 is more than £21.00, not less. Comparing only the fixed fees, £15.00 and £5.00, ignores the cost of the 40 gigabytes actually used. Reading off the costs at 100 gigabytes, £35.00 and £45.00, directly from the graph answers a different usage from the 40 gigabytes the question asks about.
- (b) 1500 — The rate is 3 ÷ 2 = 1.5 litres per minute. Converting to cm³: 1.5 × 1000 = 1500 cm³ per minute. Getting 3000 comes from converting 3 litres to cm³ first (3000 cm³) and forgetting to divide by the 2 minutes. Getting 750 comes from dividing by the 2 minutes a second time after converting (1500 ÷ 2). Getting 2000 comes from converting the 2 minutes as if it were litres (2 × 1000) instead of using the correct rate of 1.5 litres per minute.
- (a) 12 m² — Real length = 8 × 50 = 400 cm = 4 m. Real width = 6 × 50 = 300 cm = 3 m. Real area = 4 × 3 = 12 m². Scaling the plan area (8 × 6 = 48 cm²) by 50 instead of by 50 squared gives 48 × 50 = 2400 cm² = 0.24 m² — area scales by the square of the length scale factor, not the scale factor itself. Multiplying the real dimensions in centimetres, 400 × 300 = 120 000, and calling the result 120 000 m² mistakes square centimetres for square metres. Converting only the length to metres and leaving the width as 6 (treating centimetres as metres), 4 × 6 = 24, gives 24 m², from a scaling that was never finished.
- (b) They are in inverse proportion, because x × y = 60 for both pairs. — Testing inverse proportion means checking that x × y is the same for every pair: 4 × 15 = 60 and 6 × 10 = 60, so the quantities are in inverse proportion. Saying they are not in inverse proportion because x + y differs uses addition, which is not the correct test. Saying they are not in inverse proportion because y ÷ x differs uses the test for direct proportion, and finding that it differs tells us nothing about inverse proportion. Saying x × y = 40 for both pairs is an arithmetic slip: 4 × 15 = 60, not 40.