Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 2978 — A rise of 6% is a multiplier of 1.06, applied once for each year. After year 1: 2500 × 1.06 = 2650. After year 2: 2650 × 1.06 = 2809. After year 3: 2809 × 1.06 = 2977.54, which is 2978 to the nearest whole number. Multiplying by 1.18 in one go would be wrong, because the second and third years grow from larger numbers than the first.
- (b) 900 N/m² — Pressure = force ÷ area, so 45 ÷ 0.05 = 900 N/m². Working out 45 ÷ 5 = 9 misplaces the decimal point in the area, treating 0.05 m² as 5 m². Working out 45 × 0.05 = 2.25 multiplies force and area together instead of dividing. Working out 45 + 0.05 = 45.05 simply adds the two given numbers, which does not give a pressure at all. The pressure on the ground is 900 N/m².
- (c) The tangent is horizontal, so its gradient is 0. — Method: at any point where a distance–time graph is momentarily neither increasing nor decreasing, the tangent to the graph at that point is horizontal, and the gradient of a horizontal line is 0 — this is the instantaneous rate of change at that instant. Working: since the hiker's distance is neither increasing nor decreasing at t = 45 minutes, the tangent there is horizontal, so its gradient is 0. Claiming the tangent is vertical, with an undefined gradient, is the opposite of what the stem says: a vertical tangent would mean the distance was changing infinitely fast at that instant, not that it had stopped changing, and on a distance–time graph it cannot happen at all. Reading the gradient as 45, the time value given in the stem, mistakes a value used to LOCATE the point for the rate of change AT that point. Claiming the gradient cannot be found without also knowing the distance at t = 45 minutes overlooks that 'momentarily stationary' already tells you the rate of change directly, without needing to read any distance value at all. Whenever a stem tells you a quantity is momentarily not changing, that is telling you the instantaneous rate of change directly — it is 0, and no further data is needed to find it.
- (c) 1.2 — Add the parts of the ratio: 6 + 1 = 7. Divide the total amount by the number of parts: 8.4 ÷ 7 = 1.2 litres, which is the value of one part and also the amount of syrup, since syrup is 1 part. (7.2 litres is the amount of water, using 6 parts instead of 1. 1.4 comes from dividing 8.4 by 6 — the water's part of the ratio — instead of dividing by the total number of parts, 7. 0.84 comes from dividing 8.4 by 10 instead of by 7.)
- (b) The 2.4 kg bag, since it costs £1.80 per kg compared with £1.90 per kg for the 1.5 kg bag. — To compare value for money, work out the cost per kilogram for each bag. 1.5 kg bag: £2.85 ÷ 1.5 = £1.90 per kg. 2.4 kg bag: £4.32 ÷ 2.4 = £1.80 per kg. Since £1.80 is less than £1.90, the 2.4 kg bag gives better value. The option comparing £2.85 with £4.32 directly is wrong because it compares the total prices, not the price per kilogram — a bigger bag naturally costs more in total even if it is better value. The option that names the 1.5 kg bag with £1.80 per kg and the 2.4 kg bag with £1.90 per kg has the correct unit prices but has swapped which bag they belong to. The option giving £1.19 per kg and £2.88 per kg comes from dividing each price by the wrong bag's mass (£2.85 ÷ 2.4 and £4.32 ÷ 1.5).
- (d) 20 km/h — Method: average speed = total distance ÷ total time, with the time written in hours. Working: 1 hour 30 minutes = 1.5 hours, and 30 ÷ 1.5 = 20. Answer: 20 km/h. The distractors: 45 km/h comes from multiplying 30 by 1.5 instead of dividing; 15 km/h comes from dividing by 2, as if the ride had taken 2 hours; 30 km/h comes from dividing by the whole hour only and ignoring the extra 30 minutes.
- (c) £136 — 5% interest each year means the value becomes 100% + 5% = 105% of the previous year's value, and 105% = 1.05, so the multiplier is 1.05. Account A: £3200 × 1.05 × 1.05 = £3528. Account B (simple interest): £3200 + 2 × (£3200 × 0.03) = £3392. The difference is £3528 − £3392 = £136. (£128 comes from working out Account A with simple interest too, instead of compound: £3200 + 2 × (£3200 × 0.05) = £3520, then £3520 − £3392 = £128. £3528 is the value of Account A on its own, not the difference between the two accounts. £3392 is the value of Account B on its own, not the difference.)
- (d) £30.00 — The gradient is (130 − 70) ÷ (5 − 2) = 60 ÷ 3 = £20 per hour. Using the point (2, 70): the cost for 2 hours at £20 per hour is 20 × 2 = £40, so the call-out fee is 70 − 40 = £30. Taking the C-value of the first point as the fee without subtracting the hourly cost gives £70.00 — but that point already includes 2 hours of the hourly rate. Using the gradient itself as the fee, £20.00, confuses the rate per hour with the fixed charge. Subtracting 20 × 3 = 60 instead of 20 × 2 = 40 (using the wrong h-value) gives 70 − 60 = £10.00.
- (c) £338.69 — To increase by 12% each year, multiply by 1.12 twice. £270 × 1.12 × 1.12 = £338.688, which rounds to £338.69 (nearest penny, since the third decimal place is 8). £334.80 comes from treating the two 12% increases as a single flat 24% increase applied once instead of compounding: £270 × 1.24 = £334.80. £302.40 comes from applying the 12% increase only once, for 1 year instead of 2: £270 × 1.12 = £302.40. £338.68 comes from rounding £338.688 down to the nearest penny instead of up.
- (c) £2743.60 — Each year the balance is multiplied by 1.03. After the first year: 4000 × 1.03 = 4120. After the second year: 4120 × 1.03 = 4243.60, so that is what Leah takes out. She then spends £1500 of it, which leaves 4243.60 − 1500 = 2743.60. She has £2743.60 left.
- (d) Faster at t = 8s — still accelerating — The gradient of a tangent on a distance-time graph is the instantaneous speed, in m/s. At t = 2 seconds the speed is 6 m/s; at t = 8 seconds it is 9.5 m/s, which is faster, so the sprinter is still accelerating between these two times. Saying the sprinter is slower at t = 8s reverses the comparison — 9.5 is greater than 6, not less. Writing 9.5 − 6 = 3.5 and calling this 'metres further covered' turns the difference of two speeds into a distance, which the units do not support: a difference of two speeds is itself a speed, not a distance. Taking 9.5 m/s, the larger of the two instantaneous speeds, as the average speed for the whole race confuses a speed at one instant with an average over the whole distance, which would need the total distance and total time, not two tangent gradients.
- (c) 10,800 kg — Method: since the model and the real container are similar and made of the same material, mass scales with volume, so the mass scale factor is the length scale factor cubed. Working: 30³ = 27,000, so the real container's mass is 400 × 27,000 = 10,800,000 g, which is 10,800,000 ÷ 1,000 = 10,800 kg. Answer: 10,800 kg. 12 kg comes from using the length scale factor directly, 400 × 30 = 12,000 g, without cubing it. 360 kg comes from squaring the length scale factor instead of cubing it, 400 × 30² = 360,000 g. 10,800,000 kg comes from correctly cubing the scale factor but then forgetting to convert the mass from grams into kilograms.
- (c) 16 cm — Corresponding sides of similar triangles are all in the same ratio. Use the pair whose lengths are both known: the scale factor from triangle ABC to triangle PQR is 12 ÷ 6 = 2. Since QR corresponds to BC, multiply BC by that scale factor: 8 × 2 = 16, so QR = 16 cm.
- (d) 250 cm³/s — Method: first change litres per minute into cm³ per minute, then change per minute into per second. Working: 15 × 1000 = 15000 cm³ per minute, then 15000 ÷ 60 = 250 cm³ per second. So the tank fills at 250 cm³ per second. Distractor 15000 cm³/s comes from stopping after the first step and forgetting to change minutes into seconds. Distractor 900000 cm³/s comes from multiplying by 60 instead of dividing. Distractor 2500 cm³/s comes from dividing by 6 instead of 60.
- (b) £250 — Since cost is proportional to the cube of the radius, C = kr³. Using r = 3, C = 54: 3³ = 27, so 54 = k × 27, giving k = 54 ÷ 27 = 2. The equation is C = 2r³. When r = 5: 5³ = 125, so C = 2 × 125 = 250. Treating the relationship as proportional to r² instead of r³ gives k = 54 ÷ 9 = 6 and then C = 6 × 25 = 150, which models area scaling, not volume scaling. Treating it as proportional to r itself gives k = 54 ÷ 3 = 18 and then C = 18 × 5 = 90. Finding k correctly from the cube but then multiplying it by the radius instead of by the cube of the radius gives 2 × 5 = 10, which applies the right constant to the wrong power of r. The cost of a container of radius 5 cm is £250.
Build your own mix at the worksheet builder.