Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 80 km/h — Average speed = total distance ÷ total time. Total distance = 45 + 75 = 120 km. Total time = 30 minutes + 1 hour = 1.5 hours. 120 ÷ 1.5 = 80 km/h. 60 km/h comes from treating the 30 minutes as a whole hour, giving a total time of 2 hours instead of 1.5 (120 ÷ 2). 82.5 km/h comes from averaging the two separate speeds (45 ÷ 0.5 = 90 km/h and 75 ÷ 1 = 75 km/h, then (90 + 75) ÷ 2) instead of using total distance over total time. 75 km/h comes from using only the second part of the journey (75 km in 1 hour) and ignoring the first part.
- (b) 1 : 500 — smallest real distance per cm (5 m), most detail — Method: compare what one centimetre represents in real life for each scale — the scale with the smallest real distance per cm shows the most detail. Working: for 1 : 500, 1 cm represents 500 cm (5 m); for 1 : 5000, 1 cm represents 50 m; for 1 : 50 000, 1 cm represents 500 m. Since 5 m is the smallest, 1 : 500 shows the most detail. Wrong options: '1 : 50 000 — covers the largest real area' wrongly assumes covering more area means more detail, when it is the opposite; '1 : 5000 — the middle value' wrongly assumes the middle scale is automatically the most balanced; '1 : 500 — covers the largest real distance' picks the correct scale but states an incorrect fact, since 1 : 500 actually covers the smallest real distance per cm.
- (a) Yes — the cost per metre is £1.50 each time — Direct proportion holds if the cost per metre is the same every time. Check each pair: 3.00 ÷ 2 = 1.50, 6.00 ÷ 4 = 1.50, and 10.50 ÷ 7 = 1.50. All three give the same rate, £1.50 per metre, so the data does show direct proportion. Saying only that the cost increases as the length increases is not enough on its own — many non-proportional relationships also increase, so this reason does not prove proportion. Misreading 10.50 ÷ 7 as 1.05 by misplacing the decimal point gives a false mismatch that is not actually there. Requiring every length to be a double of another confuses a special case (doubling) with the general test, which is that the rate itself stays constant. The data does show direct proportion, at £1.50 per metre.
- (c) £672 — Simple interest per year = 3% of £600 = £18. Over 4 years the interest is 18 × 4 = £72. Total in the account = £600 + £72 = £672. A student who gives just the interest, without adding it to the principal, writes £72. A student who adds only one year's interest instead of four gets £600 + £18 = £618. A student who wrongly compounds the interest each year gets 600 × 1.03⁴ = £675.31.
- (b) 1:25 — Write the ratio time : volume using the numbers in the question: 8 : 200. Divide both parts by their highest common factor, 8, to give 1 : 25. (25:1 comes from writing the ratio the wrong way round, volume : time. 8:25 comes from dividing only the volume by 8 and leaving the time unchanged. 25:8 is that same mistake written the wrong way round.)
- (b) 450.00 kg — 1 m³ = 100 × 100 × 100 = 1,000,000 cm³, so 0.5 m³ = 500,000 cm³. Mass = density × volume = 0.9 × 500,000 = 450,000 g. Converting to kilograms by dividing by 1000 gives 450,000 ÷ 1000 = 450.00 kg. Skipping the m³-to-cm³ conversion and multiplying 0.9 × 0.5 = 0.45 treats the volume as if it were already 0.5 cm³, giving 0.45 kg. Finding the mass correctly in grams, 450,000 g, but not converting to kilograms leaves 450000.00 kg, out by a factor of 1000. Using the area conversion factor of 10,000, as if converting m² to cm², instead of the volume factor of 1,000,000 gives 0.5 × 10,000 = 5,000 'cm³', and a mass of 0.9 × 5,000 = 4,500 g, which is 4.50 kg.
- (a) S_{n+1} = 1.04S_n − 30 — Adding 4% interest multiplies the balance by 1 + 0.04 = 1.04. Withdrawing £30 afterwards subtracts a fixed 30, giving S_{n+1} = 1.04S_n − 30. Writing +30 instead of −30 mistakes a withdrawal for a deposit — the £30 leaves the account, so it must be subtracted. Writing 0.96 instead of 1.04 treats the 4% as a decrease rather than an increase, as if the interest were shrinking the balance instead of growing it. Writing 1.4 instead of 1.04 turns 4% into 40%, a common slip when converting a percentage to a multiplier — 4% as a decimal is 0.04, so the multiplier is 1.04, not 1.4. Always convert the percentage to a decimal first, then add 1 for growth or subtract from 1 for decay, before applying any fixed amount that is added or removed.
- (a) 4 weeks — Apply the recurrence week by week. C_1 = 0.75 × 500 + 40 = 375 + 40 = 415. C_2 = 0.75 × 415 + 40 = 311.25 + 40 = 351.25. C_3 = 0.75 × 351.25 + 40 = 263.4375 + 40 = 303.4375. C_4 = 0.75 × 303.4375 + 40 = 227.578125 + 40 = 267.578125. C_3 = 303.4375 is still above 300, but C_4 = 267.58 has dropped below it, so the lake first becomes safe after 4 weeks. Taking 25% of the ORIGINAL 500 every week instead of 25% of the current amount, a flat 125 each time, gives 500 − 125 + 40 = 415, then 415 − 125 + 40 = 330, then 330 − 125 + 40 = 245, which crosses 300 a week too early and gives the wrong answer of 3 weeks. Continuing one extra step to C_5 = 0.75 × 267.578125 + 40 = 200.68 + 40 = 240.68 and calling it 5 weeks overshoots, since the concentration had already dropped below 300 at C_4. Forgetting the 40 units of run-off each week and only applying the decay gives C_1 = 0.75 × 500 = 375, then C_2 = 0.75 × 375 = 281.25 — this is already below 300 after only 2 weeks, because without the run-off the concentration falls much faster.
- (c) 90 cm² — The perimeter ratio is 30 : 45, which simplifies to 2 : 3, so the larger frame is 1.5 times the perimeter of the smaller one. Areas scale with the square of this length scale factor: 1.5² = 2.25. 40 × 2.25 = 90, so the larger frame has an area of 90 cm². Giving 60 cm² uses the scale factor, 1.5, without squaring it (40 × 1.5 = 60). Giving 135 cm² cubes the scale factor, 1.5³ = 3.375, as if area scaled like a volume (40 × 3.375 = 135). Giving 2.25 cm² is the squared scale factor on its own, without multiplying by the smaller frame's area of 40 cm².
- (a) 12 — Speed × time is constant: k = 20 × 15 = 300. At 25 pages per minute, the time is 300 ÷ 25 = 12 minutes. Getting 18.75 comes from treating speed and time as directly proportional and working out 15 × 25 ÷ 20 instead of dividing k by the new speed. Getting 20 comes from adding the increase in speed (25 − 20 = 5) onto the time (15 + 5 = 20). Getting 10 comes from subtracting that same increase in speed from the time (15 − 5 = 10).
- (a) 3.375 — Method: the volume scale factor between similar shapes is the length scale factor cubed, not the length scale factor itself. Working: the length scale factor is 12 ÷ 8 = 1.5, and 1.5³ = 3.375. Answer: 3.375. Jayden's answer, 1.5, is only the LENGTH scale factor — he never cubed it to get the volume scale factor. 2.25 comes from squaring the length scale factor instead of cubing it, which would give the area scale factor. 4.5 comes from multiplying the length scale factor by 3 (the number of dimensions) instead of cubing it.
- (d) £144 — Method: find the length (perimeter) scale factor by taking the square root of the area ratio, then apply it to the cost. Working: 12 : 27 simplifies to 4 : 9, and the square root of each part gives the length ratio 2 : 3, so the scale factor from the smaller to the larger pond is 3 ÷ 2 = 1.5. Cost = £96 × 1.5 = £144. Answer: £144. £216 comes from using the area ratio itself as the cost ratio, £96 × (27 ÷ 12) = £216, without taking the square root. £64 comes from using the length ratio the wrong way round, £96 × (2 ÷ 3) = £64. £111 comes from simply adding the difference in area, 27 − 12 = 15, onto the original cost, £96 + £15 = £111, instead of scaling proportionally.
- (d) £117.60 — Add the hours worked over the two days: 6 + 4.5 = 10.5 hours. Multiply by the rate of pay: 10.5 × £11.20 = £117.60. (£67.20 is Monday's pay only. £50.40 is Tuesday's pay only. £106.40 comes from mistakenly adding the hours as 6 + 3.5 = 9.5 — misreading Tuesday's 4.5 hours as 3.5 — and then multiplying by £11.20.)
- (b) 4% — Method: find the total interest earned, share it equally across the number of years to find one year's interest, then write it as a percentage of the amount invested. Working: total interest = £840 − £750 = £90, so one year's interest is £90 ÷ 3 = £30, and £30 as a percentage of £750 is (£30 ÷ £750) × 100 = 4%. Answer: 4%. 12% comes from treating the total interest of £90 as if it were earned in a single year, (£90 ÷ £750) × 100 = 12%, forgetting to divide by 3 years. 0.04% comes from finding the correct decimal, £30 ÷ £750 = 0.04, but forgetting to multiply by 100 to convert it into a percentage. 112% comes from writing the final amount, £840, as a percentage of the amount invested, £750, without first subtracting the £750 to find the interest alone.
- (c) 2:3 — The white paint is 5 − 2 = 3 litres. The ratio of blue paint to white paint is 2 : 3, which has no common factor, so it is already in simplest form. Getting 2 : 5 compares the blue paint to the total amount of shade instead of to the white paint. Getting 3 : 2 has the two parts the wrong way round. Getting 5 : 3 uses the total amount of shade instead of the blue paint as the first part.
Build your own mix at the worksheet builder.