Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 135 m² — Method: for area, the scale factor must be squared. Working: area scale = 300² = 90 000. 15 × 90 000 = 1,350,000 cm². Convert to m² by dividing by 10 000: 1,350,000 ÷ 10 000 = 135 m². Wrong options: 0.45 m² comes from using the linear scale factor (×300) instead of squaring it; 1,350,000 m² comes from forgetting to convert the answer from cm² to m²; 13,500 m² comes from dividing by 100 instead of 10 000 when converting units.
- (c) 14 litres — Method: find the amount of fuel used per km first, then use it to find the fuel needed for 175 km. Working: 24 ÷ 300 = 0.08 litres per km, and 0.08 × 175 = 14 litres. So 14 litres are needed. Distractor 24 litres comes from assuming the same amount of fuel is used no matter the distance, without scaling. Distractor 21 litres comes from misreading the original distance as 200 km instead of 300 km. Distractor 1.4 litres comes from a decimal-point slip, giving an answer ten times too small.
- (a) Inverse proportion — A curve that decreases and never touches either axis is the standard shape for inverse proportion, y = k/x. Direct proportion graphs are straight lines through the origin, which this is not, so it must be inverse proportion rather than neither.
- (c) £32 — First find the gradient: (26 − 14) ÷ (50 − 20) = 12 ÷ 30 = £0.40 per minute. Using the point (20, 14), the charge for 65 minutes is 14 + 0.40 × (65 − 20) = 14 + 18 = £32. Choosing £26 comes from treating the charge as directly proportional to the time, multiplying the gradient by 65 minutes and ignoring the fixed part of the charge (0.40 × 65 = 26). Choosing £40 comes from treating £14 as if it were the charge at 0 minutes, then adding the gradient multiplied by the full 65 minutes (14 + 0.40 × 65 = 40), instead of multiplying by the extra time past 20 minutes. Choosing £33.80 comes from assuming the charge is directly proportional to the minutes already known, scaling up from the point (50, 26) in the ratio 65:50 (65 ÷ 50 × 26 = 33.80).
- (c) 3 — Method: find the height scale factor, cube it to find the volume (and coverage) scale factor, use it to find one large sack's coverage, then divide the total lawn area by this and round up to a whole number of sacks. Working: height scale factor = 40 ÷ 20 = 2, so coverage scale factor = 2³ = 8, and each large sack covers 30 × 8 = 240 m². 500 ÷ 240 = 2.08…, which rounds UP to 3 whole sacks. Answer: 3. 2 comes from correctly finding that each large sack covers 240 m², but then rounding 500 ÷ 240 down instead of up, which would leave part of the lawn untreated. 5 comes from squaring the height scale factor (2² = 4) instead of cubing it, giving a coverage of only 30 × 4 = 120 m² per sack. 17 comes from forgetting to scale the coverage at all and dividing 500 by the smaller sack's coverage of 30 m².
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (a) 15.3 litres — Squash : water = 2 : 9, so water is 9 ÷ 2 = 4.5 times the amount of squash. Multiply: 3.4 × 4.5 = 15.3 litres. Using the multiplier upside down — treating squash as 9 ÷ 2 times water, when it is water that is 9 ÷ 2 times squash — and calculating 3.4 × (2 ÷ 9) gives about 0.8 litres (to 1 d.p.); that would be the squash needed for 3.4 litres of water, not the water needed for 3.4 litres of squash. Adding the difference between the ratio parts, 9 − 2 = 7, to the squash amount, 3.4 + 7 = 10.4, mistakes a ratio for a fixed extra amount. Using the total number of parts, 2 + 9 = 11, so the multiplier 11 ÷ 2 = 5.5, gives 3.4 × 5.5 = 18.7 litres — that finds the total mix from the squash amount, not the water alone.
- (c) 150% — Percentage = (180,000 ÷ 120,000) × 100 = 150%.
- (a) 2.17 litres per minute — There are 60 minutes in an hour, so to convert litres per hour to litres per minute you divide by 60: 130 ÷ 60 = 2.1666..., which rounds to 2.17 litres per minute. Multiplying by 60 instead of dividing gives 130 × 60 = 7800.00 litres per minute, using the conversion factor the wrong way round. Leaving the rate unchanged, 130.00, ignores that 'per hour' and 'per minute' are different units. Dividing by 50 instead of 60, misremembering the number of minutes in an hour, gives 130 ÷ 50 = 2.60 litres per minute.
- (c) C = 1.5n — Method: a fixed ratio between C and n means C is always the same multiple of n, and that multiple is the cost of one bottle. Working: 3.00 ÷ 2 = 1.5, 7.50 ÷ 5 = 1.5 and 12.00 ÷ 8 = 1.5, so every bottle costs £1.50 and C = 1.5n. Answer: C = 1.5n. The distractors: C = n + 1 comes from subtracting on the first row, 3 − 2 = 1, and adding that difference instead of multiplying; it fits the first row and fails the other two, which is why three rows are given; C = 3n reads the £3.00 as the price of one bottle when it is the price of two; C = n/1.5 divides the number of bottles by the price of one bottle, which works out how many bottles a pound buys instead of what n bottles cost.
- (b) No — rate fell by 3.7 thousand/month — Each tangent gradient is the instantaneous growth rate, in thousand subscribers per month. To compare them, subtract the later rate from the earlier one: 4.8 − 1.1 = 3.7. Since 1.1 is less than 4.8, the growth rate has fallen by 3.7 thousand subscribers per month, so the manager is wrong — the app is growing more slowly at 18 months, not faster. Subtracting the other way round and calling the result a rise, 'rate rose by 3.7 thousand/month', gets the direction backwards: the later gradient is the smaller of the two. Adding the two gradients, 4.8 + 1.1 = 5.9, and calling this a combined rate that shows speeding up, is the wrong operation for comparing two rates. Treating the difference 3.7 as a total number of subscribers lost, rather than a rate in thousands per month, confuses a rate with a count. Always subtract the two rates in a sensible order and keep the units in thousands per month.
- (c) 10,800 kg — Method: since the model and the real container are similar and made of the same material, mass scales with volume, so the mass scale factor is the length scale factor cubed. Working: 30³ = 27,000, so the real container's mass is 400 × 27,000 = 10,800,000 g, which is 10,800,000 ÷ 1,000 = 10,800 kg. Answer: 10,800 kg. 12 kg comes from using the length scale factor directly, 400 × 30 = 12,000 g, without cubing it. 360 kg comes from squaring the length scale factor instead of cubing it, 400 × 30² = 360,000 g. 10,800,000 kg comes from correctly cubing the scale factor but then forgetting to convert the mass from grams into kilograms.
- (d) 100 — Rearrange L = 0.6L + 40 by collecting the L terms on one side: L − 0.6L = 40, which gives 0.4L = 40, then L = 40 ÷ 0.4 = 100. Subtracting the other way round, 0.6L − L = 40, gives −0.4L = 40, then L = 40 ÷ (−0.4) = −100 — a sign error that flips the answer negative even though a long-run value here must be positive. Ignoring the 0.6L term completely and solving L = 40 directly gives 40, which throws away the recurrence's own multiplier. Dividing 40 by 0.6 instead of by the correct coefficient 0.4 gives 40 ÷ 0.6 ≈ 66.7, a slip that comes from dividing by the coefficient of L on the RIGHT of the original equation rather than by what is left once the L terms are collected on one side. Always collect the L terms first, then divide by whatever coefficient of L remains.
- (b) 25 m/s — Convert km/h to m/s by multiplying by 1000 (km to m) and dividing by 3600 (hours to seconds): 90 × 1000 ÷ 3600 = 25 m/s. Working out 90 ÷ 60 = 1.5 converts using 60, as if going from hours to minutes rather than to seconds. Working out 90 × 3.6 = 324 multiplies by 3.6 instead of dividing by it, going the wrong way between the units. Working out 90 × 1000 = 90000 converts kilometres to metres but forgets to convert hours to seconds at all. The train's speed is 25 m/s.
- (c) 54 — Method: y = kx, so k = y ÷ x. Working: k = 18 ÷ 5 = 3.6. At x = 15: y = 3.6 × 15 = 54. Wrong options: 28 comes from adding the change in x (10) onto y instead of scaling; 6 comes from treating the relationship as inverse proportion (k = 5 × 18 = 90, then y = 90 ÷ 15 = 6); 60 comes from rounding the constant up to 4 instead of using 3.6.
Build your own mix at the worksheet builder.