Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 1.375 — The multiplier is the new value divided by the original value: 176 000 ÷ 128 000 = 1.375. Choosing 0.375 comes from working out the increase as a fraction of the original (48 000 ÷ 128 000 = 0.375) and stopping there, without adding on the 1 whole that represents the original turnover. Choosing 0.727 comes from dividing the 2023 turnover by the 2024 turnover, the wrong way round (128 000 ÷ 176 000, rounded to 3 decimal places). Choosing 137.5 comes from writing the multiplier as a percentage — the 2024 turnover is 137.5% of the 2023 turnover — instead of converting it to the decimal multiplier 1.375.
- (a) 2978 — A rise of 6% is a multiplier of 1.06, applied once for each year. After year 1: 2500 × 1.06 = 2650. After year 2: 2650 × 1.06 = 2809. After year 3: 2809 × 1.06 = 2977.54, which is 2978 to the nearest whole number. Multiplying by 1.18 in one go would be wrong, because the second and third years grow from larger numbers than the first.
- (b) 15 — Find the multiplier connecting y to x: 10 ÷ 4 = 2.5. Then apply it to the new value of x: 2.5 × 6 = 15. Working out 10 + (6 − 4) = 12 adds the change in x straight onto y instead of scaling proportionally. Working out 10 × 6 = 60 multiplies the given y-value by the new x-value directly, without finding the multiplier first. Writing 10 keeps y the same as before, not realising it must change with x. When x = 6, y = 15.
- (c) 27.1 cm — The model length is 20.6 ÷ 76 = 0.271052... metres. Converting to centimetres by multiplying by 100 gives 27.1052..., which rounds to 27.1 cm. Forgetting to convert metres to centimetres leaves the answer as 0.271052... metres, which rounds to 0.3 cm if the unit is simply relabelled. Multiplying by 1000 instead of 100 when converting metres to centimetres gives 271.052..., which rounds to 271.1 cm. Multiplying by 76 instead of dividing, 20.6 × 76 = 1565.6, uses the scale factor the wrong way round — that would be the real length if the model were 20.6 units long, not the other way round.
- (c) 32 km/h — Method: to change mph into km/h, multiply by the number of kilometres in a mile. Working: 20 × 1.6 = 32 km/h. So the cyclist's speed is 32 km/h. Distractor 12.5 km/h comes from dividing by 1.6 instead of multiplying. Distractor 21.6 km/h comes from adding 1.6 instead of multiplying by it. Distractor 20 km/h comes from not converting the units at all.
- (b) 24 km/h — First convert 45 minutes to hours: 45 ÷ 60 = 0.75 hours. Then divide the distance by the time: 18 ÷ 0.75 = 24 km/h. Reading 45 minutes as 0.45 hours (writing the minutes after the decimal point instead of dividing by 60) gives 18 ÷ 0.45 = 40 km/h. Working out 18 × 0.75 = 13.5 multiplies by the time instead of dividing. Working out 18 ÷ 45 = 0.4 divides by 45 without ever converting the minutes to hours. The cyclist's average speed is 24 km/h.
- (d) 0.40 m/min — To estimate an instantaneous rate of change at a point without a diagram, use the gradient of a chord joining two points close to it, one on each side. At t = 9: 0.02 × 81 = 1.62, so h = 1.62 + 0.5 = 2.12. At t = 11: 0.02 × 121 = 2.42, so h = 2.42 + 0.5 = 2.92. The change in height is 2.92 − 2.12 = 0.80 and the change in time is 11 − 9 = 2, so the gradient of the chord is 0.80 ÷ 2 = 0.40. Reporting the change in height, 0.80, on its own is not a rate, because it has not been divided by the 2 minutes over which it happened. Using the chord from t = 0 (where h = 0.5) to t = 11 instead gives 2.92 − 0.5 = 2.42, and 2.42 ÷ 11 = 0.22, which is the average gradient over the whole 11 minutes, not the instantaneous rate at t = 10. Substituting t = 10 into the formula gives 0.02 × 100 + 0.5 = 2.50, which is the height of the water at that moment, not the rate at which the height is rising. The estimated instantaneous rate of change at t = 10 is 0.40 m/min.
- (a) 20 litres per minute — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, and its units are the vertical unit for each one of the horizontal unit. Working: from (2, 50) to (6, 130) the volume changes by 130 − 50 = 80 litres and the time changes by 6 − 2 = 4 minutes, so the gradient is 80 ÷ 4 = 20, measured in litres for each minute. Answer: 20 litres per minute. The distractors: 25 litres per minute comes from using one point on its own, 50 ÷ 2, which assumes the line starts at the origin when the tank already held 50 litres at 2 minutes; 0.05 litres per minute comes from dividing the change in time by the change in volume, 4 ÷ 80, which gives the time for each litre but is then labelled as litres for each minute; 20 minutes for each litre has the right value with the units the wrong way round, and a tank that needed 20 minutes to gain a single litre would be filling far more slowly than this one.
- (d) 20 km/h — Method: average speed = total distance ÷ total time, with the time written in hours. Working: 1 hour 30 minutes = 1.5 hours, and 30 ÷ 1.5 = 20. Answer: 20 km/h. The distractors: 45 km/h comes from multiplying 30 by 1.5 instead of dividing; 15 km/h comes from dividing by 2, as if the ride had taken 2 hours; 30 km/h comes from dividing by the whole hour only and ignoring the extra 30 minutes.
- (c) 10,800 kg — Method: since the model and the real container are similar and made of the same material, mass scales with volume, so the mass scale factor is the length scale factor cubed. Working: 30³ = 27,000, so the real container's mass is 400 × 27,000 = 10,800,000 g, which is 10,800,000 ÷ 1,000 = 10,800 kg. Answer: 10,800 kg. 12 kg comes from using the length scale factor directly, 400 × 30 = 12,000 g, without cubing it. 360 kg comes from squaring the length scale factor instead of cubing it, 400 × 30² = 360,000 g. 10,800,000 kg comes from correctly cubing the scale factor but then forgetting to convert the mass from grams into kilograms.
- (b) t = 5 and t = 7 (closest, evenly spaced) — To estimate the instantaneous rate of change at t = 6, use the chord centred on t = 6 with the closest readings on either side, t = 5 and t = 7. The gradient of this chord is 15.4 − 17.5 = −2.1, then −2.1 ÷ 2 = −1.05 cm per minute. The interval t = 3 to t = 9 is also centred on t = 6 but is wider: 13.4 − 18.7 = −5.3, then −5.3 ÷ 6 ≈ −0.88 cm per minute — this brings in more of the curve's own change in steepness, so it is a worse estimate of the rate at the single instant t = 6. Using t = 6 and t = 7 only gives 15.4 − 16.6 = −1.2, then −1.2 ÷ 1 = −1.2 cm per minute, but this is not centred on t = 6 — it estimates the rate over (6, 7), not at t = 6 itself. Using t = 0 and t = 6 gives 16.6 − 20.0 = −3.4, then −3.4 ÷ 6 ≈ −0.57 cm per minute, the average rate for the whole first six minutes, not the rate at the instant t = 6. Always choose the chord that brackets the point as closely as possible.
- (c) £478.40 — Method: apply the percentage increase, then apply the percentage decrease to the new price. Working: after the increase, the laptop costs £520 × 1.15. Multiplying this result by 0.80 gives the final price, £478.40. Answer: £478.40. £494 comes from combining the two percentages into a single net change (15% − 20% = −5%) and applying it directly, £520 × 0.95 = £494, instead of applying the two changes one after the other. £416 comes from applying only the 20% decrease to the original price, £520 × 0.80 = £416, forgetting the increase entirely. £598 comes from applying only the 15% increase and stopping there, forgetting to apply the decrease at all.
- (c) 30 km — First convert 1 hour 15 minutes to hours: 15 minutes is a quarter of an hour, so the time is 1.25 hours. Then multiply by the speed: 24 × 1.25 = 30 km. Reading 15 minutes as 0.15 hours (writing the minutes after the decimal point instead of as a fraction of 60) gives 24 × 1.15 = 27.6 km. Working out 24 × 75 = 1800 multiplies by the number of minutes instead of converting to hours first. Working out 24 ÷ 1.25 = 19.2 divides by the time instead of multiplying. The cyclist travels 30 km.
- (b) 75 — The exchange rate is constant: k = 46 ÷ 40 = 1.15 euros per pound. For £65, the number of euros is 1.15 × 65 = 74.75, which rounds to 75 euros. Getting 74 comes from rounding 74.75 down instead of to the nearest whole number. Getting 57 comes from using the reciprocal rate (40 ÷ 46) instead of 46 ÷ 40. Getting 71 comes from adding the difference between 65 and 40 (25) onto 46 instead of using the proportional rate.
- (d) 26.6 — Find the constant multiplier — the mass of each metre of pipe: 12.6 ÷ 4.5 = 2.8, so the mass is always 2.8 times the length. For a length of 9.5 m, the mass is 9.5 × 2.8 = 26.6 kg. 17.6 comes from assuming an additive relationship instead of a multiplicative one — adding the increase in length (9.5 − 4.5 = 5) onto 12.6. 3.4 comes from using the multiplier the wrong way round (4.5 ÷ 12.6, rounded to 1 d.p.), then multiplying by 9.5. 12.6 comes from simply repeating the given mass, without applying the multiplier to the new length.
Build your own mix at the worksheet builder.