Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 12 m² — Real length = 8 × 50 = 400 cm = 4 m. Real width = 6 × 50 = 300 cm = 3 m. Real area = 4 × 3 = 12 m². Scaling the plan area (8 × 6 = 48 cm²) by 50 instead of by 50 squared gives 48 × 50 = 2400 cm² = 0.24 m² — area scales by the square of the length scale factor, not the scale factor itself. Multiplying the real dimensions in centimetres, 400 × 300 = 120 000, and calling the result 120 000 m² mistakes square centimetres for square metres. Converting only the length to metres and leaving the width as 6 (treating centimetres as metres), 4 × 6 = 24, gives 24 m², from a scaling that was never finished.
- (d) 24.6 km/h — Average speed = distance ÷ time, with time in hours. 47 minutes = 47 ÷ 60 hours. 19.3 ÷ (47 ÷ 60) = 19.3 ÷ 47 × 60 = 24.638…, which rounds to 24.6 km/h (1 d.p.). 0.4 km/h comes from dividing the distance by 47 and treating the result as km/h directly, without converting the minutes to hours at all. 41.1 km/h comes from converting minutes to hours by dividing by 100 instead of 60 (19.3 ÷ 47 × 100). 0.3 km/h comes from dividing the distance by 60 instead of converting the 47 minutes to hours first.
- (d) 0.40 m/min — To estimate an instantaneous rate of change at a point without a diagram, use the gradient of a chord joining two points close to it, one on each side. At t = 9: 0.02 × 81 = 1.62, so h = 1.62 + 0.5 = 2.12. At t = 11: 0.02 × 121 = 2.42, so h = 2.42 + 0.5 = 2.92. The change in height is 2.92 − 2.12 = 0.80 and the change in time is 11 − 9 = 2, so the gradient of the chord is 0.80 ÷ 2 = 0.40. Reporting the change in height, 0.80, on its own is not a rate, because it has not been divided by the 2 minutes over which it happened. Using the chord from t = 0 (where h = 0.5) to t = 11 instead gives 2.92 − 0.5 = 2.42, and 2.42 ÷ 11 = 0.22, which is the average gradient over the whole 11 minutes, not the instantaneous rate at t = 10. Substituting t = 10 into the formula gives 0.02 × 100 + 0.5 = 2.50, which is the height of the water at that moment, not the rate at which the height is rising. The estimated instantaneous rate of change at t = 10 is 0.40 m/min.
- (d) 1 : 1 — Sugar and butter together make 3 + 5 = 8 parts of the mixture. Comparing flour to this, 8 : 8, simplifies to 1 : 1. Giving 1 : 2 compares flour with the whole mixture (8 + 3 + 5 = 16 parts, giving 8 : 16 = 1 : 2) instead of with the rest of the mixture. Giving 3 : 5 is the ratio of sugar to butter, not of flour to the rest of the mixture. Giving 8 : 3 compares flour only with sugar, leaving butter out altogether.
- (a) 1/9 — The ratio copper : tin is 9:1, so write tin over copper: 1/9. (9/1 comes from writing the ratio the wrong way round, copper over tin. 1/10 comes from comparing the tin to the total mass of the alloy, 1 part out of 10. 9/10 comes from comparing the copper to the total mass of the alloy, 9 parts out of 10.)
- (b) Day 3 to Day 4 — Method: the average rate of increase between two consecutive days is the difference in the number of orders divided by the number of days between them, which here is just the difference itself, since each gap is one day; comparing all four differences finds which is greatest. Working: the differences are 1,509 − 1,284 = 225 (Day 1 to Day 2), 1,830 − 1,509 = 321 (Day 2 to Day 3), 2,296 − 1,830 = 466 (Day 3 to Day 4), and 2,510 − 2,296 = 214 (Day 4 to Day 5); 466 is the greatest of the four, so the rate of increase was greatest from Day 3 to Day 4. Choosing Day 4 to Day 5 comes from picking the interval that ends on the highest total number of orders, 2,510, confusing the SIZE of the total with the RATE at which it grew. Choosing Day 1 to Day 2 comes from assuming the rate must be greatest at the very start, without working out any of the four differences. Choosing Day 2 to Day 3 comes from comparing only the first two differences, 225 and 321, and stopping there without checking Day 3 to Day 4 or Day 4 to Day 5. Finding the greatest rate of change from a table always means computing every difference between consecutive values and comparing them all — the day with the highest total, or the first pair you check, is not a shortcut.
- (a) 7 — The average rate of change of y with respect to x over an interval is the change in y divided by the change in x between its two endpoints — the gradient of the chord joining them, not a rate at a single point. At x = 1: 2 × 1 = 2, so y = 1 + 2 = 3. At x = 4: 2 × 4 = 8, so y = 16 + 8 = 24. The change in y is 24 − 3 = 21 and the change in x is 4 − 1 = 3, so the average rate of change is 21 ÷ 3 = 7. Reporting the change in y, 21, on its own is not a rate of change, because it has not been divided by the 3 units of x over which it happened. Reporting 3 is not a rate either — 3 is the width of the interval, and also the value of y at x = 1, and neither of those measures how fast y is changing. Subtracting in the wrong order gives −21 ÷ 3 = −7, the wrong sign. The average rate of change of y with respect to x over the interval is 7.
- (b) £250 — Since cost is proportional to the cube of the radius, C = kr³. Using r = 3, C = 54: 3³ = 27, so 54 = k × 27, giving k = 54 ÷ 27 = 2. The equation is C = 2r³. When r = 5: 5³ = 125, so C = 2 × 125 = 250. Treating the relationship as proportional to r² instead of r³ gives k = 54 ÷ 9 = 6 and then C = 6 × 25 = 150, which models area scaling, not volume scaling. Treating it as proportional to r itself gives k = 54 ÷ 3 = 18 and then C = 18 × 5 = 90. Finding k correctly from the cube but then multiplying it by the radius instead of by the cube of the radius gives 2 × 5 = 10, which applies the right constant to the wrong power of r. The cost of a container of radius 5 cm is £250.
- (d) £3.60 per component — The gradient of a cost-against-components graph has units of pounds per component, since cost is measured in pounds and the horizontal axis counts components. So 3.60 means it costs an extra £3.60 to produce one more component at that point. Calling it '£3.60 total cost' confuses the gradient, a rate, with the y-value on the graph, which is the total cost itself. Giving it as 3.60 components per pound swaps which axis is on top, giving the units of the reciprocal gradient, not the gradient itself. Turning 3.60 into a percentage invents a unit that has no basis in the graph's axes — a gradient here is a number of pounds, not a percentage. Always build the gradient's units from the two axes' own units, in the order y-axis over x-axis.
- (b) −3 — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, with both changes taken in the same direction along the line. Working: going from (1, 20) to (5, 8) the change in y is 8 − 20 = −12 and the change in x is 5 − 1 = 4, so the gradient is −12 ÷ 4 = −3. Answer: −3, and the negative sign is expected because the line falls from left to right. The distractors: 3 comes from subtracting the smaller y from the larger, 20 − 8 = 12, while still taking the x values from left to right, which loses the minus sign that says the line falls; −12 is the change in y left undivided by the change in x of 4; −1/3 comes from dividing the change in x by the change in y, 4 ÷ (−12), turning the gradient upside down.
- (a) 0.62 miles — The gradient of the line is the change in miles divided by the change in kilometres: 31 ÷ 50 = 0.62, so 1 kilometre converts to 0.62 miles. Dividing the wrong way round, 50 ÷ 31 = 1.612..., rounds to 1.61 miles — that finds how many kilometres are in 1 mile, not the reverse. Doubling the gradient, 1.24 miles, comes from using 62 ÷ 50 instead of 31 ÷ 50. Reading off the y-coordinate of the given point without dividing by the x-coordinate gives 31.00 miles, which is the number of miles for 50 kilometres, not for 1 kilometre.
- (b) 75 — The exchange rate is constant: k = 46 ÷ 40 = 1.15 euros per pound. For £65, the number of euros is 1.15 × 65 = 74.75, which rounds to 75 euros. Getting 74 comes from rounding 74.75 down instead of to the nearest whole number. Getting 57 comes from using the reciprocal rate (40 ÷ 46) instead of 46 ÷ 40. Getting 71 comes from adding the difference between 65 and 40 (25) onto 46 instead of using the proportional rate.
- (b) 1 : 1.875 — To write a ratio in the form 1 : n, divide both parts by the first part, 8: 8 ÷ 8 = 1 and 15 ÷ 8 = 1.875, giving 1 : 1.875. Giving 1 : 0.53 divides the wrong way round, computing 8 ÷ 15 instead of 15 ÷ 8. Giving 1.875 : 1 has the two parts of the answer swapped, which is the form n : 1, not 1 : n. Giving 8 : 1.875 divides only the second part by 8, so the first part is still 8, not 1.
- (b) £76.00 — One part of the ratio is £47.50 ÷ 5 = £9.50. The school receives 8 parts, so its share is 9.50 × 8 = £76.00. Dividing £47.50 by 8 instead of 5, treating the charity's amount as if it were 8 parts, gives 47.50 ÷ 8 = 5.9375, then × 5 = £29.69. Adding the charity's amount to the school's amount instead of stopping at the school's own share gives the total collected, 9.50 × 13 = £123.50. Adding one part to the charity's amount instead of multiplying one part by 8 gives 47.50 + 9.50 = £57.00.
- (a) 150 g — Method: scale the recipe to find the total sugar needed, then subtract the sugar Sam already has. Working: 200 ÷ 8 × 20 = 500, so 500 g is needed in total; 500 − 350 = 150, so 150 g still to buy. Stopping after finding the total, 500, without subtracting what he has gives 500 g. Scaling the wrong way round, 200 × 8 ÷ 20 = 80, wrongly suggests he already has enough, giving 0 g. Adding the amount he has instead of subtracting it, 500 + 350 = 850, gives 850 g.
Build your own mix at the worksheet builder.