Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 120 minutes — Method: find the rate in bottles per minute, then divide the order size by the rate. Working: rate = 810 ÷ 45 = 18 bottles per minute. Time = 2,160 ÷ 18 = 120 minutes. Wrong options: 1,350 minutes comes from subtracting 810 from 2,160 instead of using the rate; 48 minutes comes from dividing the order size by the original time (2,160 ÷ 45) instead of the rate; 108 minutes comes from rounding the rate to 20 bottles per minute before dividing.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (c) Average rate, t = 2 to 6, is −2°C/min — First find the temperature at each end of the interval. At t = 2, T = 80 − 6 × 2 + 0.5 × 2² = 80 − 12 + 2 = 70. At t = 6, T = 80 − 6 × 6 + 0.5 × 6² = 80 − 36 + 18 = 62. The average rate of change over the interval is the change in T divided by the change in t: 62 − 70 = −8, then −8 ÷ 4 = −2°C per minute, so the statement about the average rate is correct. The instantaneous rate at t = 6 is not −2: completing the square gives T = 0.5(t − 6)² + 62, so t = 6 is the turning point of the curve, where the tangent is horizontal and the rate is 0°C per minute — the reaction has stopped cooling by then. The instantaneous rate at t = 2 is not −2 either: a short chord centred on t = 2, from t = 1.9 (T = 70.405) to t = 2.1 (T = 69.605), gives −0.8 ÷ 0.2 = −4°C per minute, so the reaction is cooling twice as fast at the start of the interval as the average over it. Saying the temperature falls 2°C in total confuses the RATE, −2°C per minute, with a TOTAL drop, which is 70 − 62 = 8°C over the four minutes. Always check whether a figure is a rate, per minute, or a total change.
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (d) The population is growing at 2500 people per year. — The gradient of a tangent to a graph gives the instantaneous rate of change of the quantity on the vertical axis with respect to the quantity on the horizontal axis, at that exact point — not the total change and not an average. Here the vertical axis is population in thousands and the horizontal axis is time in years, so the gradient is measured in thousands of people per year. A gradient of 2.5 means the population is growing at an instantaneous rate of 2.5 thousand people per year, and since P is measured in thousands, 2.5 × 1000 = 2500 people per year. This describes the rate of change at that instant, not the total increase over the 6 years and not an average population.
- (c) The tangent is horizontal, so its gradient is 0. — Method: at any point where a distance–time graph is momentarily neither increasing nor decreasing, the tangent to the graph at that point is horizontal, and the gradient of a horizontal line is 0 — this is the instantaneous rate of change at that instant. Working: since the hiker's distance is neither increasing nor decreasing at t = 45 minutes, the tangent there is horizontal, so its gradient is 0. Claiming the tangent is vertical, with an undefined gradient, is the opposite of what the stem says: a vertical tangent would mean the distance was changing infinitely fast at that instant, not that it had stopped changing, and on a distance–time graph it cannot happen at all. Reading the gradient as 45, the time value given in the stem, mistakes a value used to LOCATE the point for the rate of change AT that point. Claiming the gradient cannot be found without also knowing the distance at t = 45 minutes overlooks that 'momentarily stationary' already tells you the rate of change directly, without needing to read any distance value at all. Whenever a stem tells you a quantity is momentarily not changing, that is telling you the instantaneous rate of change directly — it is 0, and no further data is needed to find it.
- (a) Yes — the cost per metre is £1.50 each time — Direct proportion holds if the cost per metre is the same every time. Check each pair: 3.00 ÷ 2 = 1.50, 6.00 ÷ 4 = 1.50, and 10.50 ÷ 7 = 1.50. All three give the same rate, £1.50 per metre, so the data does show direct proportion. Saying only that the cost increases as the length increases is not enough on its own — many non-proportional relationships also increase, so this reason does not prove proportion. Misreading 10.50 ÷ 7 as 1.05 by misplacing the decimal point gives a false mismatch that is not actually there. Requiring every length to be a double of another confuses a special case (doubling) with the general test, which is that the rate itself stays constant. The data does show direct proportion, at £1.50 per metre.
- (d) 250 cm³/s — Method: first change litres per minute into cm³ per minute, then change per minute into per second. Working: 15 × 1000 = 15000 cm³ per minute, then 15000 ÷ 60 = 250 cm³ per second. So the tank fills at 250 cm³ per second. Distractor 15000 cm³/s comes from stopping after the first step and forgetting to change minutes into seconds. Distractor 900000 cm³/s comes from multiplying by 60 instead of dividing. Distractor 2500 cm³/s comes from dividing by 6 instead of 60.
- (d) 48 — Find the rate first: 18 ÷ 3 = 6 bottles per minute. Then apply it to the new time: 6 × 8 = 48 bottles. Working out 18 + (8 − 3) = 23 adds the extra 5 minutes onto the number of bottles instead of scaling proportionally. Working out 18 × 8 = 144 multiplies the given number of bottles by the new number of minutes without finding the rate first. Writing 18 keeps the count the same, not realising it must change with the time. In 8 minutes the machine fills 48 bottles.
- (c) 7.6 — Density = mass ÷ volume, so 356.5 ÷ 47 = 7.585..., which rounds to 7.6 g/cm³ (1 d.p.). (0.1 comes from dividing the volume by the mass instead of the mass by the volume, the wrong way round. 7.5 comes from rounding 7.585 down instead of up to 1 decimal place. 403.5 comes from adding the mass and the volume instead of dividing.)
- (b) £76.00 — One part of the ratio is £47.50 ÷ 5 = £9.50. The school receives 8 parts, so its share is 9.50 × 8 = £76.00. Dividing £47.50 by 8 instead of 5, treating the charity's amount as if it were 8 parts, gives 47.50 ÷ 8 = 5.9375, then × 5 = £29.69. Adding the charity's amount to the school's amount instead of stopping at the school's own share gives the total collected, 9.50 × 13 = £123.50. Adding one part to the charity's amount instead of multiplying one part by 8 gives 47.50 + 9.50 = £57.00.
- (d) 3:8 — Convert 2 hours to minutes: 2 hours = 120 minutes. The ratio is 45 : 120. The highest common factor of 45 and 120 is 15. Divide both parts by 15: 45 ÷ 15 = 3 and 120 ÷ 15 = 8, giving 3 : 8. Leaving the hours unconverted gives 45 : 2 — the units on each side are different, so this does not compare like with like. Dividing by 5 instead of 15 gives 9 : 24, which still shares a common factor of 3, so it is not fully simplified. Swapping the order gives 8 : 3, hours to minutes instead of minutes to hours.
- (c) 1.25 cm — Method: find the real length using the first map's scale, then use the second map's scale to find its drawn length. Working: real length = 5 × 20 000 = 100 000 cm. On the second map: 100 000 ÷ 80 000 = 1.25 cm. Wrong options: 20 cm comes from inverting the ratio of the two scales (5 × 80 000 ÷ 20 000); 5 cm comes from wrongly assuming the length looks the same on both maps; 12.5 cm comes from dropping a zero from the second scale factor and dividing by 8 000 instead of 80 000 (100 000 ÷ 8 000).
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (a) S_{n+1} = 1.04S_n − 30 — Adding 4% interest multiplies the balance by 1 + 0.04 = 1.04. Withdrawing £30 afterwards subtracts a fixed 30, giving S_{n+1} = 1.04S_n − 30. Writing +30 instead of −30 mistakes a withdrawal for a deposit — the £30 leaves the account, so it must be subtracted. Writing 0.96 instead of 1.04 treats the 4% as a decrease rather than an increase, as if the interest were shrinking the balance instead of growing it. Writing 1.4 instead of 1.04 turns 4% into 40%, a common slip when converting a percentage to a multiplier — 4% as a decimal is 0.04, so the multiplier is 1.04, not 1.4. Always convert the percentage to a decimal first, then add 1 for growth or subtract from 1 for decay, before applying any fixed amount that is added or removed.
Build your own mix at the worksheet builder.