Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 450.00 kg — 1 m³ = 100 × 100 × 100 = 1,000,000 cm³, so 0.5 m³ = 500,000 cm³. Mass = density × volume = 0.9 × 500,000 = 450,000 g. Converting to kilograms by dividing by 1000 gives 450,000 ÷ 1000 = 450.00 kg. Skipping the m³-to-cm³ conversion and multiplying 0.9 × 0.5 = 0.45 treats the volume as if it were already 0.5 cm³, giving 0.45 kg. Finding the mass correctly in grams, 450,000 g, but not converting to kilograms leaves 450000.00 kg, out by a factor of 1000. Using the area conversion factor of 10,000, as if converting m² to cm², instead of the volume factor of 1,000,000 gives 0.5 × 10,000 = 5,000 'cm³', and a mass of 0.9 × 5,000 = 4,500 g, which is 4.50 kg.
- (d) Faster at t = 8s — still accelerating — The gradient of a tangent on a distance-time graph is the instantaneous speed, in m/s. At t = 2 seconds the speed is 6 m/s; at t = 8 seconds it is 9.5 m/s, which is faster, so the sprinter is still accelerating between these two times. Saying the sprinter is slower at t = 8s reverses the comparison — 9.5 is greater than 6, not less. Writing 9.5 − 6 = 3.5 and calling this 'metres further covered' turns the difference of two speeds into a distance, which the units do not support: a difference of two speeds is itself a speed, not a distance. Taking 9.5 m/s, the larger of the two instantaneous speeds, as the average speed for the whole race confuses a speed at one instant with an average over the whole distance, which would need the total distance and total time, not two tangent gradients.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (d) 10 — First find the height at each end of the chord. At t = 1, h = 30 × 1 − 5 × 1² = 30 − 5 = 25. At t = 3, h = 30 × 3 − 5 × 3² = 90 − 45 = 45. The gradient of the chord estimates the instantaneous rate at the midpoint t = 2: 45 − 25 = 20, then 20 ÷ (3 − 1) = 20 ÷ 2 = 10 m/s. Finding the change in height but forgetting to divide by the change in time gives 20, which is a distance, not a rate. Averaging the two heights instead of finding the difference gives (25 + 45) ÷ 2 = 70 ÷ 2 = 35. Subtracting in the wrong order, 25 − 45 = −20, then −20 ÷ 2 = −10, gives the correct size with the sign flipped — the rocket is rising, not falling, at t = 2 seconds, so a negative rate cannot be right here.
- (c) Falling at £950 per year — The gradient of a tangent on a value-age graph is a rate, in pounds per year, so −950 means the van's value is falling at £950 per year at that instant. Writing this as 950% per year mistakes a rate measured in pounds per year for a percentage — the units of a gradient come from the units on the two axes, £ and years, not from a percentage. Saying the value 'falls by £950 over the next year' treats the instantaneous rate at age 2 as if it stayed constant for a whole year, which finds an average future change, not the instantaneous rate at age 2 itself. Reading the sign the wrong way round gives 'rising at £950 per year', which would mean the van is gaining value. Always match the units of a gradient to the units on the two axes of the graph.
- (c) £7617.60 — To decrease by 8% each year, multiply by 0.92 (100% − 8%) twice. £9000 × 0.92 × 0.92 = £7617.60. £7560.00 comes from treating the two 8% decreases as a single flat 16% decrease applied once instead of compounding: £9000 × 0.84 = £7560.00. £8280.00 comes from applying the 8% decrease only once, for 1 year instead of 2: £9000 × 0.92 = £8280.00. £10497.60 comes from multiplying by 1.08 twice, increasing the value instead of decreasing it: £9000 × 1.08 × 1.08 = £10497.60.
- (a) 4 hours — This is inverse proportion: more pumps take less time. Multiply the original numbers to find the total pump-hours needed: 2 × 10 = 20 pump-hours. Divide by the new number of pumps: 20 ÷ 5 = 4 hours. Working out 10 × 5 ÷ 2 = 25 hours treats it as direct proportion, as if more pumps needed more time. Stopping at 20 gives the total pump-hours, not the number of hours. Working out 10 − (5 − 2) = 7 hours subtracts the extra number of pumps straight from the number of hours, treating pumps and hours as the same kind of quantity. 5 pumps take 4 hours.
- (a) 18/25 — First find the new number of rose bushes: 90 × 1.2 = 108 (a 20% increase multiplies by 1.2). Then write 108 over 150 and divide top and bottom by 6 to get 18/25. Choosing 3/5 comes from using the original 90 rose bushes without applying the 20% increase (90/150 = 3/5). Choosing 25/18 comes from writing the number of lavender bushes over the new number of rose bushes, the wrong way round. Choosing 3/25 comes from multiplying 90 by 0.2 instead of 1.2, finding only the increase (18) rather than the new total, then writing 18/150 = 3/25.
- (d) 8 — The product of price and number of tickets is constant: k = 4 × 12 = 48. At £6 per ticket, the number of tickets is 48 ÷ 6 = 8. Getting 18 comes from treating price and tickets as directly proportional and working out 12 × 6 ÷ 4 instead of dividing k by the new price. Getting 12 assumes the number of tickets does not change when the price changes. Getting 6 comes from writing down the new price instead of working out the number of tickets.
- (c) Average rate, t = 2 to 6, is −2°C/min — First find the temperature at each end of the interval. At t = 2, T = 80 − 6 × 2 + 0.5 × 2² = 80 − 12 + 2 = 70. At t = 6, T = 80 − 6 × 6 + 0.5 × 6² = 80 − 36 + 18 = 62. The average rate of change over the interval is the change in T divided by the change in t: 62 − 70 = −8, then −8 ÷ 4 = −2°C per minute, so the statement about the average rate is correct. The instantaneous rate at t = 6 is not −2: completing the square gives T = 0.5(t − 6)² + 62, so t = 6 is the turning point of the curve, where the tangent is horizontal and the rate is 0°C per minute — the reaction has stopped cooling by then. The instantaneous rate at t = 2 is not −2 either: a short chord centred on t = 2, from t = 1.9 (T = 70.405) to t = 2.1 (T = 69.605), gives −0.8 ÷ 0.2 = −4°C per minute, so the reaction is cooling twice as fast at the start of the interval as the average over it. Saying the temperature falls 2°C in total confuses the RATE, −2°C per minute, with a TOTAL drop, which is 70 − 62 = 8°C over the four minutes. Always check whether a figure is a rate, per minute, or a total change.
- (b) They are in inverse proportion, because x × y = 60 for both pairs. — Testing inverse proportion means checking that x × y is the same for every pair: 4 × 15 = 60 and 6 × 10 = 60, so the quantities are in inverse proportion. Saying they are not in inverse proportion because x + y differs uses addition, which is not the correct test. Saying they are not in inverse proportion because y ÷ x differs uses the test for direct proportion, and finding that it differs tells us nothing about inverse proportion. Saying x × y = 40 for both pairs is an arithmetic slip: 4 × 15 = 60, not 40.
- (a) 1/9 — The ratio copper : tin is 9:1, so write tin over copper: 1/9. (9/1 comes from writing the ratio the wrong way round, copper over tin. 1/10 comes from comparing the tin to the total mass of the alloy, 1 part out of 10. 9/10 comes from comparing the copper to the total mass of the alloy, 9 parts out of 10.)
- (d) 2748 — A 7% increase each year means the value becomes 100% + 7% = 107% of the previous year's value, and 107% = 1.07, so the multiplier is 1.07. Multiply by 1.07 for each of the 2 years: 2400 × 1.07 × 1.07 = 2747.76, which rounds to 2748. (2736 comes from using simple growth instead of compound: 2400 + 2 × (2400 × 0.07) = 2736. 2568 is the population after only 1 year, 2400 × 1.07, forgetting the second year's growth. 2747 comes from rounding 2747.76 down instead of up to the nearest whole number.)
- (c) £32 — First find the gradient: (26 − 14) ÷ (50 − 20) = 12 ÷ 30 = £0.40 per minute. Using the point (20, 14), the charge for 65 minutes is 14 + 0.40 × (65 − 20) = 14 + 18 = £32. Choosing £26 comes from treating the charge as directly proportional to the time, multiplying the gradient by 65 minutes and ignoring the fixed part of the charge (0.40 × 65 = 26). Choosing £40 comes from treating £14 as if it were the charge at 0 minutes, then adding the gradient multiplied by the full 65 minutes (14 + 0.40 × 65 = 40), instead of multiplying by the extra time past 20 minutes. Choosing £33.80 comes from assuming the charge is directly proportional to the minutes already known, scaling up from the point (50, 26) in the ratio 65:50 (65 ÷ 50 × 26 = 33.80).
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
Build your own mix at the worksheet builder.