- (c) 48 mm — Method: extension = k × force, where k = extension ÷ force. Working: k = 12 ÷ 5 = 2.4 mm per N. At 20 N: extension = 2.4 × 20 = 48 mm. Wrong options: 32 mm comes from adding the extension and force numbers instead of scaling (12 + 20); 3 mm comes from treating the relationship as inverse proportion (12 × 5 ÷ 20); 36 mm comes from using an incorrect scale factor of 3 between the forces instead of the correct factor of 4 (20 ÷ 5).
- (d) £5.40 — Method: work out the reduced price at each shop separately, then subtract the smaller from the larger. Working: Shop A's reduced price is £45 × 0.8 = £36, and Shop B's reduced price is £34 × 0.9 = £30.60, so the difference is £36 − £30.60 = £5.40. Answer: £5.40. £11.00 comes from comparing the two ORIGINAL prices, £45 − £34, without applying either shop's reduction at all. £1.60 comes from finding Shop A's reduced price correctly, £36, but then subtracting Shop B's original (unreduced) price of £34 instead of its reduced price. £66.60 comes from adding the two reduced prices together, £36 + £30.60, instead of subtracting them.
- (b) £16 — Since cost is proportional to the square root of diameter, C = k√d. Using d = 9, C = 12: √9 = 3, so 12 = k × 3, giving k = 12 ÷ 3 = 4. The equation is C = 4√d. When d = 16: √16 = 4, so C = 4 × 4 = 16. Halving the new diameter instead of taking its square root gives 16 ÷ 2 = 8, and then C = 4 × 8 = 32 — halving a number is not the same as taking its square root, as √16 = 4, not 8. Multiplying k by the diameter itself instead of by its square root gives C = 4 × 16 = 64, skipping the square root altogether. Reporting √16 on its own, without multiplying by k, gives only 4, not the cost. The cost of manufacturing a lens of diameter 16 mm is £16.
- (c) 90 cm² — The perimeter ratio is 30 : 45, which simplifies to 2 : 3, so the larger frame is 1.5 times the perimeter of the smaller one. Areas scale with the square of this length scale factor: 1.5² = 2.25. 40 × 2.25 = 90, so the larger frame has an area of 90 cm². Giving 60 cm² uses the scale factor, 1.5, without squaring it (40 × 1.5 = 60). Giving 135 cm² cubes the scale factor, 1.5³ = 3.375, as if area scaled like a volume (40 × 3.375 = 135). Giving 2.25 cm² is the squared scale factor on its own, without multiplying by the smaller frame's area of 40 cm².
- (b) The 2.4 kg bag, since it costs £1.80 per kg compared with £1.90 per kg for the 1.5 kg bag. — To compare value for money, work out the cost per kilogram for each bag. 1.5 kg bag: £2.85 ÷ 1.5 = £1.90 per kg. 2.4 kg bag: £4.32 ÷ 2.4 = £1.80 per kg. Since £1.80 is less than £1.90, the 2.4 kg bag gives better value. The option comparing £2.85 with £4.32 directly is wrong because it compares the total prices, not the price per kilogram — a bigger bag naturally costs more in total even if it is better value. The option that names the 1.5 kg bag with £1.80 per kg and the 2.4 kg bag with £1.90 per kg has the correct unit prices but has swapped which bag they belong to. The option giving £1.19 per kg and £2.88 per kg comes from dividing each price by the wrong bag's mass (£2.85 ÷ 2.4 and £4.32 ÷ 1.5).
- (b) t = 5 and t = 7 (closest, evenly spaced) — To estimate the instantaneous rate of change at t = 6, use the chord centred on t = 6 with the closest readings on either side, t = 5 and t = 7. The gradient of this chord is 15.4 − 17.5 = −2.1, then −2.1 ÷ 2 = −1.05 cm per minute. The interval t = 3 to t = 9 is also centred on t = 6 but is wider: 13.4 − 18.7 = −5.3, then −5.3 ÷ 6 ≈ −0.88 cm per minute — this brings in more of the curve's own change in steepness, so it is a worse estimate of the rate at the single instant t = 6. Using t = 6 and t = 7 only gives 15.4 − 16.6 = −1.2, then −1.2 ÷ 1 = −1.2 cm per minute, but this is not centred on t = 6 — it estimates the rate over (6, 7), not at t = 6 itself. Using t = 0 and t = 6 gives 16.6 − 20.0 = −3.4, then −3.4 ÷ 6 ≈ −0.57 cm per minute, the average rate for the whole first six minutes, not the rate at the instant t = 6. Always choose the chord that brackets the point as closely as possible.
- (b) Car A, 50 km/h — Method: speed = distance ÷ time for each car, then compare. Working: Car A = 150 ÷ 3 = 50 km/h. Car B = 180 ÷ 4 = 45 km/h. Since 50 > 45, Car A is faster, travelling at 50 km/h. Wrong options: Car B, 45 km/h correctly finds Car B's speed but wrongly names the slower car as faster; Car A, 45 km/h picks the correct car but uses Car B's speed by mistake; Car B, 50 km/h picks the wrong car but uses Car A's correct speed value.
- (d) 120 g — Mass = density × volume, so 0.8 × 150 = 120 g. Working out 150 ÷ 0.8 = 187.5 divides by the density instead of multiplying, the wrong way round for finding a mass. Working out 150 × 8 = 1200 misplaces the decimal point in the density, treating 0.8 g/cm³ as 8 g/cm³. Working out 150 − 0.8 = 149.2 simply subtracts the density from the volume, which does not give a mass. The piece of wood has a mass of 120 g.
- (a) 5/12 — Work out the distance still to travel: 372 − 217 = 155 miles. Form the fraction 155/372; both numbers share a factor of 31, so 155 ÷ 31 = 5 and 372 ÷ 31 = 12, giving 5/12. 7/12 comes from writing the distance already travelled as the fraction of the journey (217/372 = 7/12), instead of the distance still to travel. 145/372 comes from miscalculating 372 − 217 as 145 instead of 155. 5/7 comes from comparing the remaining distance with the distance already travelled (155/217 = 5/7), instead of with the total journey.
- (d) £3.60 per component — The gradient of a cost-against-components graph has units of pounds per component, since cost is measured in pounds and the horizontal axis counts components. So 3.60 means it costs an extra £3.60 to produce one more component at that point. Calling it '£3.60 total cost' confuses the gradient, a rate, with the y-value on the graph, which is the total cost itself. Giving it as 3.60 components per pound swaps which axis is on top, giving the units of the reciprocal gradient, not the gradient itself. Turning 3.60 into a percentage invents a unit that has no basis in the graph's axes — a gradient here is a number of pounds, not a percentage. Always build the gradient's units from the two axes' own units, in the order y-axis over x-axis.
- (b) €230.00 — Multiply the amount in pounds by the exchange rate: 200 × 1.15 = 230, so £200 = €230.00. Working out 200 + 1.15 = 201.15 treats the exchange rate as an amount to add rather than a multiplier. Working out 200 × 0.15 = 30 finds only the extra amount earned for every pound and forgets to add it back to the original £200. Working out 200 × 11.5 = 2300.00 misplaces the decimal point in the exchange rate, multiplying by 11.5 instead of 1.15. £200 converts to €230.00.
- (a) S_{n+1} = 1.04S_n − 30 — Adding 4% interest multiplies the balance by 1 + 0.04 = 1.04. Withdrawing £30 afterwards subtracts a fixed 30, giving S_{n+1} = 1.04S_n − 30. Writing +30 instead of −30 mistakes a withdrawal for a deposit — the £30 leaves the account, so it must be subtracted. Writing 0.96 instead of 1.04 treats the 4% as a decrease rather than an increase, as if the interest were shrinking the balance instead of growing it. Writing 1.4 instead of 1.04 turns 4% into 40%, a common slip when converting a percentage to a multiplier — 4% as a decimal is 0.04, so the multiplier is 1.04, not 1.4. Always convert the percentage to a decimal first, then add 1 for growth or subtract from 1 for decay, before applying any fixed amount that is added or removed.
- (b) 5 years — The recurrence P_{n+1} = 1.1P_n − 30 must be applied once per year, checking after each application whether the population has passed 460. Starting from P_0 = 400: 400 × 1.1 − 30 = 410, so P_1 = 410. Then 410 × 1.1 − 30 = 421, so P_2 = 421. Then 421 × 1.1 − 30 = 433.1, so P_3 = 433.1. Then 433.1 × 1.1 − 30 = 446.41, so P_4 = 446.41, which is still below 460. Then 446.41 × 1.1 − 30 = 461.051, so P_5 = 461.051, the first value above 460. The population first exceeds 460 after 5 complete years. Stopping at P_4 = 446.41 and reporting 4 years reports the last year the population was still below 460, not the first year it was above. Counting the starting value P_0 = 400 as a year of growth makes P_5 the sixth number in the list and gives 6 years, but P_0 is the population before any year has passed, so P_5 is reached after 5 years, not 6. Reading "exceed 460" as "exceed the starting population of 400" instead gives P_1 = 410, already above 400, and 1 year — but the threshold named in the question is 460, not the starting value, so always check every value against the number actually stated in the question.
- (c) 7.6 — Density = mass ÷ volume, so 356.5 ÷ 47 = 7.585..., which rounds to 7.6 g/cm³ (1 d.p.). (0.1 comes from dividing the volume by the mass instead of the mass by the volume, the wrong way round. 7.5 comes from rounding 7.585 down instead of up to 1 decimal place. 403.5 comes from adding the mass and the volume instead of dividing.)
- (c) 10,800 kg — Method: since the model and the real container are similar and made of the same material, mass scales with volume, so the mass scale factor is the length scale factor cubed. Working: 30³ = 27,000, so the real container's mass is 400 × 27,000 = 10,800,000 g, which is 10,800,000 ÷ 1,000 = 10,800 kg. Answer: 10,800 kg. 12 kg comes from using the length scale factor directly, 400 × 30 = 12,000 g, without cubing it. 360 kg comes from squaring the length scale factor instead of cubing it, 400 × 30² = 360,000 g. 10,800,000 kg comes from correctly cubing the scale factor but then forgetting to convert the mass from grams into kilograms.