Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 4% — Method: find the total interest earned, share it equally across the number of years to find one year's interest, then write it as a percentage of the amount invested. Working: total interest = £840 − £750 = £90, so one year's interest is £90 ÷ 3 = £30, and £30 as a percentage of £750 is (£30 ÷ £750) × 100 = 4%. Answer: 4%. 12% comes from treating the total interest of £90 as if it were earned in a single year, (£90 ÷ £750) × 100 = 12%, forgetting to divide by 3 years. 0.04% comes from finding the correct decimal, £30 ÷ £750 = 0.04, but forgetting to multiply by 100 to convert it into a percentage. 112% comes from writing the final amount, £840, as a percentage of the amount invested, £750, without first subtracting the £750 to find the interest alone.
- (d) £8262 — A fall of 15% is a multiplier of 0.85 and a fall of 10% is a multiplier of 0.9, and each multiplier acts on the value at the start of its own year. After year 1: 12000 × 0.85 = 10200. After year 2: 10200 × 0.9 = 9180. After year 3: 9180 × 0.9 = 8262. The value 3 years after the car was bought is £8262. Adding the percentages to make a single fall of 35% would be wrong, because the later falls are taken from smaller values.
- (d) 218 — The rule x_{n+1} = 0.8x_n + 50 must be applied once for each step, using the result of the previous step every time — not the same starting value repeated. Starting from x_0 = 200: 0.8 × 200 = 160, so x_1 = 160 + 50 = 210. Then 0.8 × 210 = 168, so x_2 = 168 + 50 = 218. Stopping after one iteration leaves x_1 = 210, not x_2. Applying only the multiplier twice without adding 50 at each step uses 0.8² = 0.64, and 0.64 × 200 = 128, which drops the 50 completely. Adding 50 twice at the end instead of once per step, 128 + 100 = 228, still does not reproduce the actual recurrence, because the 50 added at the first step is itself multiplied by 0.8 at the second step. After two iterations, x_2 = 218.
- (a) 4 weeks — Apply the recurrence week by week. C_1 = 0.75 × 500 + 40 = 375 + 40 = 415. C_2 = 0.75 × 415 + 40 = 311.25 + 40 = 351.25. C_3 = 0.75 × 351.25 + 40 = 263.4375 + 40 = 303.4375. C_4 = 0.75 × 303.4375 + 40 = 227.578125 + 40 = 267.578125. C_3 = 303.4375 is still above 300, but C_4 = 267.58 has dropped below it, so the lake first becomes safe after 4 weeks. Taking 25% of the ORIGINAL 500 every week instead of 25% of the current amount, a flat 125 each time, gives 500 − 125 + 40 = 415, then 415 − 125 + 40 = 330, then 330 − 125 + 40 = 245, which crosses 300 a week too early and gives the wrong answer of 3 weeks. Continuing one extra step to C_5 = 0.75 × 267.578125 + 40 = 200.68 + 40 = 240.68 and calling it 5 weeks overshoots, since the concentration had already dropped below 300 at C_4. Forgetting the 40 units of run-off each week and only applying the decay gives C_1 = 0.75 × 500 = 375, then C_2 = 0.75 × 375 = 281.25 — this is already below 300 after only 2 weeks, because without the run-off the concentration falls much faster.
- (c) £478.40 — Method: apply the percentage increase, then apply the percentage decrease to the new price. Working: after the increase, the laptop costs £520 × 1.15. Multiplying this result by 0.80 gives the final price, £478.40. Answer: £478.40. £494 comes from combining the two percentages into a single net change (15% − 20% = −5%) and applying it directly, £520 × 0.95 = £494, instead of applying the two changes one after the other. £416 comes from applying only the 20% decrease to the original price, £520 × 0.80 = £416, forgetting the increase entirely. £598 comes from applying only the 15% increase and stopping there, forgetting to apply the decrease at all.
- (b) 7.2 m — Multiply the model wingspan by the scale factor: 15 × 48 = 720. This is in centimetres, and 720 cm = 7.2 m, since 1 m = 100 cm. Giving 0.31 m divides by the scale factor instead of multiplying (15 ÷ 48 ≈ 0.31), scaling the model down rather than the real aircraft up. Giving 72 m converts centimetres to metres by dividing by 10 instead of 100. Giving 0.72 m converts by dividing by 1000 instead of 100.
- (c) £7590 — Apply interest, then subtract the payment, once for each year. Year 1: 8000 × 1.05 = 8400, then 8400 − 600 = 7800. Year 2: 7800 × 1.05 = 8190, then 8190 − 600 = 7590, so £7590 remains after 2 years. Forgetting the payments altogether and only compounding the interest gives 8000 × 1.05 = 8400, then 8400 × 1.05 = 8820 — this ignores that £600 leaves the fund every year. Subtracting the £600 BEFORE adding interest each year, instead of after, gives (8000 − 600) × 1.05 = 7770, then (7770 − 600) × 1.05 = 7528.50, which changes the order the two operations happen in and so changes the amount that earns interest each year. Subtracting the two payments as one lump sum of £1200 at the very end, from the no-withdrawal total 8820 − 1200 = 7620, ignores that the first £600 withdrawal also stops earning interest during the second year. Always apply interest, then the withdrawal, in that order, once for every single year.
- (c) 1.2 — Add the parts of the ratio: 6 + 1 = 7. Divide the total amount by the number of parts: 8.4 ÷ 7 = 1.2 litres, which is the value of one part and also the amount of syrup, since syrup is 1 part. (7.2 litres is the amount of water, using 6 parts instead of 1. 1.4 comes from dividing 8.4 by 6 — the water's part of the ratio — instead of dividing by the total number of parts, 7. 0.84 comes from dividing 8.4 by 10 instead of by 7.)
- (d) Faster at t = 8s — still accelerating — The gradient of a tangent on a distance-time graph is the instantaneous speed, in m/s. At t = 2 seconds the speed is 6 m/s; at t = 8 seconds it is 9.5 m/s, which is faster, so the sprinter is still accelerating between these two times. Saying the sprinter is slower at t = 8s reverses the comparison — 9.5 is greater than 6, not less. Writing 9.5 − 6 = 3.5 and calling this 'metres further covered' turns the difference of two speeds into a distance, which the units do not support: a difference of two speeds is itself a speed, not a distance. Taking 9.5 m/s, the larger of the two instantaneous speeds, as the average speed for the whole race confuses a speed at one instant with an average over the whole distance, which would need the total distance and total time, not two tangent gradients.
- (c) 30 km — First convert 1 hour 15 minutes to hours: 15 minutes is a quarter of an hour, so the time is 1.25 hours. Then multiply by the speed: 24 × 1.25 = 30 km. Reading 15 minutes as 0.15 hours (writing the minutes after the decimal point instead of as a fraction of 60) gives 24 × 1.15 = 27.6 km. Working out 24 × 75 = 1800 multiplies by the number of minutes instead of converting to hours first. Working out 24 ÷ 1.25 = 19.2 divides by the time instead of multiplying. The cyclist travels 30 km.
- (c) 183 mg — Apply the decay, then add the new dose, once for each hour. Hour 1: 0.7 × 200 = 140, then 140 + 50 = 190. Hour 2: 0.7 × 190 = 133, then 133 + 50 = 183, so there is 183 mg after 2 hours. Forgetting the top-up dose and only applying the decay gives 0.7 × 200 = 140, then 0.7 × 140 = 98 — this ignores that a further 50 mg is given every hour. Adding the 50 mg BEFORE the decay is applied, instead of after, gives 0.7 × (200 + 50) = 175, then 0.7 × (175 + 50) = 157.5, which changes how much of the dose is eliminated in the same hour it is given. Multiplying by 0.3, the percentage ELIMINATED, instead of by 0.7, the percentage REMAINING, gives 0.3 × 200 + 50 = 110, then 0.3 × 110 + 50 = 83 — this mixes up the amount that leaves the bloodstream with the amount that stays in it. Always check whether a percentage describes what remains or what is removed before choosing the multiplier.
- (a) 35/32 — Work out each weekly total first. Last week: 5 × 7 = 35 hours. This week: 4 × 8 = 32 hours. Last week's total is being written as a fraction of this week's total, so last week goes on the top and this week goes on the bottom, giving 35/32. The two totals share no common factor, so the fraction cannot be cancelled. It is greater than 1, which says that Priya worked more hours last week than this week.
- (a) 2 : 3 — Simplify the volume ratio first: 64 : 216 divides by 8 to give 8 : 27. Volumes scale with the cube of the height ratio, so take the cube root of each part: the cube root of 8 is 2, and the cube root of 27 is 3, giving a height ratio of 2 : 3. Giving 3 : 2 has the ratio the right way round for larger to smaller, not smaller to larger. Giving 8 : 27 is the simplified volume ratio, without cube-rooting it. Giving 64 : 216 is the volume ratio before it has even been simplified.
- (b) The 2.4 kg bag, since it costs £1.80 per kg compared with £1.90 per kg for the 1.5 kg bag. — To compare value for money, work out the cost per kilogram for each bag. 1.5 kg bag: £2.85 ÷ 1.5 = £1.90 per kg. 2.4 kg bag: £4.32 ÷ 2.4 = £1.80 per kg. Since £1.80 is less than £1.90, the 2.4 kg bag gives better value. The option comparing £2.85 with £4.32 directly is wrong because it compares the total prices, not the price per kilogram — a bigger bag naturally costs more in total even if it is better value. The option that names the 1.5 kg bag with £1.80 per kg and the 2.4 kg bag with £1.90 per kg has the correct unit prices but has swapped which bag they belong to. The option giving £1.19 per kg and £2.88 per kg comes from dividing each price by the wrong bag's mass (£2.85 ÷ 2.4 and £4.32 ÷ 1.5).
- (c) 70 cm — Method: convert the real length to centimetres, then divide by the scale factor. Working: 84 m = 8400 cm. 8400 ÷ 120 = 70 cm. Wrong options: 0.7 cm comes from dividing 84 by 120 without converting metres to centimetres; 1,008,000 cm comes from multiplying instead of dividing (8400 × 120); 7 cm comes from converting 84 m to 840 cm (using ×10 instead of ×100) before dividing.
Build your own mix at the worksheet builder.