Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) £150 — Value after year 1: £800 × 0.75 = £600. Value after year 2: £600 × 0.75 = £450. The loss during the second year alone is £600 − £450 = £150. £450 comes from giving the value remaining after 2 years, not the amount lost during the second year. £200 comes from working out the loss during the first year instead of the second: £800 − £600 = £200. £350 comes from working out the total loss over both years instead of just the second year's loss: £800 − £450 = £350.
- (d) £144 — Method: find the length (perimeter) scale factor by taking the square root of the area ratio, then apply it to the cost. Working: 12 : 27 simplifies to 4 : 9, and the square root of each part gives the length ratio 2 : 3, so the scale factor from the smaller to the larger pond is 3 ÷ 2 = 1.5. Cost = £96 × 1.5 = £144. Answer: £144. £216 comes from using the area ratio itself as the cost ratio, £96 × (27 ÷ 12) = £216, without taking the square root. £64 comes from using the length ratio the wrong way round, £96 × (2 ÷ 3) = £64. £111 comes from simply adding the difference in area, 27 − 12 = 15, onto the original cost, £96 + £15 = £111, instead of scaling proportionally.
- (c) 4 km — Since signal strength is inversely proportional to the square of the distance, S = k/d². Using d = 2, S = 20: 2² = 4, so 20 = k ÷ 4, giving k = 20 × 4 = 80. The equation is S = 80/d². When S = 5: d² = 80 ÷ 5 = 16, so d = 4 (taking the positive root, since distance cannot be negative). Stopping at d² = 16 without taking the square root leaves 16, the square of the distance, not the distance itself. Treating the relationship as inversely proportional to distance itself, rather than to its square, gives k = 20 × 2 = 40 and then d = 40 ÷ 5 = 8, a different relationship. Multiplying by S instead of dividing by it when isolating d² gives d² = 80 × 5 = 400 and d = 20, the wrong operation. The distance at which the signal strength is 5 units is 4 km.
- (a) 4 weeks — Apply the recurrence week by week. C_1 = 0.75 × 500 + 40 = 375 + 40 = 415. C_2 = 0.75 × 415 + 40 = 311.25 + 40 = 351.25. C_3 = 0.75 × 351.25 + 40 = 263.4375 + 40 = 303.4375. C_4 = 0.75 × 303.4375 + 40 = 227.578125 + 40 = 267.578125. C_3 = 303.4375 is still above 300, but C_4 = 267.58 has dropped below it, so the lake first becomes safe after 4 weeks. Taking 25% of the ORIGINAL 500 every week instead of 25% of the current amount, a flat 125 each time, gives 500 − 125 + 40 = 415, then 415 − 125 + 40 = 330, then 330 − 125 + 40 = 245, which crosses 300 a week too early and gives the wrong answer of 3 weeks. Continuing one extra step to C_5 = 0.75 × 267.578125 + 40 = 200.68 + 40 = 240.68 and calling it 5 weeks overshoots, since the concentration had already dropped below 300 at C_4. Forgetting the 40 units of run-off each week and only applying the decay gives C_1 = 0.75 × 500 = 375, then C_2 = 0.75 × 375 = 281.25 — this is already below 300 after only 2 weeks, because without the run-off the concentration falls much faster.
- (c) £7617.60 — To decrease by 8% each year, multiply by 0.92 (100% − 8%) twice. £9000 × 0.92 × 0.92 = £7617.60. £7560.00 comes from treating the two 8% decreases as a single flat 16% decrease applied once instead of compounding: £9000 × 0.84 = £7560.00. £8280.00 comes from applying the 8% decrease only once, for 1 year instead of 2: £9000 × 0.92 = £8280.00. £10497.60 comes from multiplying by 1.08 twice, increasing the value instead of decreasing it: £9000 × 1.08 × 1.08 = £10497.60.
- (a) 35/32 — Work out each weekly total first. Last week: 5 × 7 = 35 hours. This week: 4 × 8 = 32 hours. Last week's total is being written as a fraction of this week's total, so last week goes on the top and this week goes on the bottom, giving 35/32. The two totals share no common factor, so the fraction cannot be cancelled. It is greater than 1, which says that Priya worked more hours last week than this week.
- (b) Provider Y — £21.00 against Provider X's £23.00 — Provider X's gradient is (35 − 15) ÷ 100 = 0.2, so cost = 15 + 0.2 × 40 = 15 + 8 = £23.00. Provider Y's gradient is (45 − 5) ÷ 100 = 0.4, so cost = 5 + 0.4 × 40 = 5 + 16 = £21.00. £21.00 is less than £23.00, so Provider Y is cheaper: 'Provider Y — £21.00 against Provider X's £23.00'. Getting both costs right but naming Provider X as cheaper compares the two numbers the wrong way round — £23.00 is more than £21.00, not less. Comparing only the fixed fees, £15.00 and £5.00, ignores the cost of the 40 gigabytes actually used. Reading off the costs at 100 gigabytes, £35.00 and £45.00, directly from the graph answers a different usage from the 40 gigabytes the question asks about.
- (c) 1.25 cm — Method: find the real length using the first map's scale, then use the second map's scale to find its drawn length. Working: real length = 5 × 20 000 = 100 000 cm. On the second map: 100 000 ÷ 80 000 = 1.25 cm. Wrong options: 20 cm comes from inverting the ratio of the two scales (5 × 80 000 ÷ 20 000); 5 cm comes from wrongly assuming the length looks the same on both maps; 12.5 cm comes from dropping a zero from the second scale factor and dividing by 8 000 instead of 80 000 (100 000 ÷ 8 000).
- (d) 1.5 — Method: the length scale factor is the square root of the area scale factor, not the area scale factor itself. Working: the area scale factor is 45 ÷ 20 = 2.25, and the square root of 2.25 is 1.5. Answer: 1.5. Nadia's answer, 2.25, is the AREA scale factor — she never took the square root to get back to the length scale factor. 4.5 comes from doubling the area scale factor instead of taking its square root. 0.67 comes from taking the square root in the wrong direction, finding the scale factor from the larger rug to the smaller rug instead of the other way round.
- (b) The 2.4 kg bag, since it costs £1.80 per kg compared with £1.90 per kg for the 1.5 kg bag. — To compare value for money, work out the cost per kilogram for each bag. 1.5 kg bag: £2.85 ÷ 1.5 = £1.90 per kg. 2.4 kg bag: £4.32 ÷ 2.4 = £1.80 per kg. Since £1.80 is less than £1.90, the 2.4 kg bag gives better value. The option comparing £2.85 with £4.32 directly is wrong because it compares the total prices, not the price per kilogram — a bigger bag naturally costs more in total even if it is better value. The option that names the 1.5 kg bag with £1.80 per kg and the 2.4 kg bag with £1.90 per kg has the correct unit prices but has swapped which bag they belong to. The option giving £1.19 per kg and £2.88 per kg comes from dividing each price by the wrong bag's mass (£2.85 ÷ 2.4 and £4.32 ÷ 1.5).
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (d) £30.00 — The gradient is (130 − 70) ÷ (5 − 2) = 60 ÷ 3 = £20 per hour. Using the point (2, 70): the cost for 2 hours at £20 per hour is 20 × 2 = £40, so the call-out fee is 70 − 40 = £30. Taking the C-value of the first point as the fee without subtracting the hourly cost gives £70.00 — but that point already includes 2 hours of the hourly rate. Using the gradient itself as the fee, £20.00, confuses the rate per hour with the fixed charge. Subtracting 20 × 3 = 60 instead of 20 × 2 = 40 (using the wrong h-value) gives 70 − 60 = £10.00.
- (c) £478.40 — Method: apply the percentage increase, then apply the percentage decrease to the new price. Working: after the increase, the laptop costs £520 × 1.15. Multiplying this result by 0.80 gives the final price, £478.40. Answer: £478.40. £494 comes from combining the two percentages into a single net change (15% − 20% = −5%) and applying it directly, £520 × 0.95 = £494, instead of applying the two changes one after the other. £416 comes from applying only the 20% decrease to the original price, £520 × 0.80 = £416, forgetting the increase entirely. £598 comes from applying only the 15% increase and stopping there, forgetting to apply the decrease at all.
- (b) 4% — Method: find the total interest earned, share it equally across the number of years to find one year's interest, then write it as a percentage of the amount invested. Working: total interest = £840 − £750 = £90, so one year's interest is £90 ÷ 3 = £30, and £30 as a percentage of £750 is (£30 ÷ £750) × 100 = 4%. Answer: 4%. 12% comes from treating the total interest of £90 as if it were earned in a single year, (£90 ÷ £750) × 100 = 12%, forgetting to divide by 3 years. 0.04% comes from finding the correct decimal, £30 ÷ £750 = 0.04, but forgetting to multiply by 100 to convert it into a percentage. 112% comes from writing the final amount, £840, as a percentage of the amount invested, £750, without first subtracting the £750 to find the interest alone.
- (c) £7590 — Apply interest, then subtract the payment, once for each year. Year 1: 8000 × 1.05 = 8400, then 8400 − 600 = 7800. Year 2: 7800 × 1.05 = 8190, then 8190 − 600 = 7590, so £7590 remains after 2 years. Forgetting the payments altogether and only compounding the interest gives 8000 × 1.05 = 8400, then 8400 × 1.05 = 8820 — this ignores that £600 leaves the fund every year. Subtracting the £600 BEFORE adding interest each year, instead of after, gives (8000 − 600) × 1.05 = 7770, then (7770 − 600) × 1.05 = 7528.50, which changes the order the two operations happen in and so changes the amount that earns interest each year. Subtracting the two payments as one lump sum of £1200 at the very end, from the no-withdrawal total 8820 − 1200 = 7620, ignores that the first £600 withdrawal also stops earning interest during the second year. Always apply interest, then the withdrawal, in that order, once for every single year.
Build your own mix at the worksheet builder.