MathsUKwww.geekhero.co.uk
- (d) The population is growing at 2500 people per year. — The gradient of a tangent to a graph gives the instantaneous rate of change of the quantity on the vertical axis with respect to the quantity on the horizontal axis, at that exact point — not the total change and not an average. Here the vertical axis is population in thousands and the horizontal axis is time in years, so the gradient is measured in thousands of people per year. A gradient of 2.5 means the population is growing at an instantaneous rate of 2.5 thousand people per year, and since P is measured in thousands, 2.5 × 1000 = 2500 people per year. This describes the rate of change at that instant, not the total increase over the 6 years and not an average population.
- (d) 90 cm — Method: scale each dimension by the scale factor, then find the perimeter. Working: model height = 240 ÷ 8 = 30 cm; model width = 120 ÷ 8 = 15 cm. Perimeter = 2 × (30 + 15) = 90 cm. Wrong options: 11.25 cm comes from squaring the scale factor as if finding an area (720 ÷ 64); 510 cm comes from scaling only one dimension and leaving the other at full size; 720 cm comes from finding the real perimeter (2 × (240 + 120)) but forgetting to scale it down at all.
- (c) Falling at £950 per year — The gradient of a tangent on a value-age graph is a rate, in pounds per year, so −950 means the van's value is falling at £950 per year at that instant. Writing this as 950% per year mistakes a rate measured in pounds per year for a percentage — the units of a gradient come from the units on the two axes, £ and years, not from a percentage. Saying the value 'falls by £950 over the next year' treats the instantaneous rate at age 2 as if it stayed constant for a whole year, which finds an average future change, not the instantaneous rate at age 2 itself. Reading the sign the wrong way round gives 'rising at £950 per year', which would mean the van is gaining value. Always match the units of a gradient to the units on the two axes of the graph.
- (c) Map A, where the distance is 40 cm — 10 km = 1,000,000 cm. On Map A: 1000000 ÷ 25000 = 40 cm. On Map B: 1000000 ÷ 50000 = 20 cm. Since 40 cm is longer than 20 cm, the same real distance appears longer on Map A, the map with the smaller scale number. 'Map B, where the distance is 20 cm' has the correct working for Map B but names the wrong map as the one with the longer length. 'Map A, where the distance is 20 cm' correctly identifies Map A but pairs it with Map B's length. 'Map B, where the distance is 40 cm' correctly identifies Map A's length but attaches it to the wrong map.
- (c) 16 cm — Corresponding sides of similar triangles are all in the same ratio. Use the pair whose lengths are both known: the scale factor from triangle ABC to triangle PQR is 12 ÷ 6 = 2. Since QR corresponds to BC, multiply BC by that scale factor: 8 × 2 = 16, so QR = 16 cm.
- (d) 2748 — A 7% increase each year means the value becomes 100% + 7% = 107% of the previous year's value, and 107% = 1.07, so the multiplier is 1.07. Multiply by 1.07 for each of the 2 years: 2400 × 1.07 × 1.07 = 2747.76, which rounds to 2748. (2736 comes from using simple growth instead of compound: 2400 + 2 × (2400 × 0.07) = 2736. 2568 is the population after only 1 year, 2400 × 1.07, forgetting the second year's growth. 2747 comes from rounding 2747.76 down instead of up to the nearest whole number.)
- (d) Gradient = acceleration; area = distance travelled. — Method: on a speed–time graph, the gradient of the graph at an instant is the rate of change of speed with time, which is acceleration; the area between the graph and the time-axis over an interval is the total distance covered in that interval, because it accumulates speed × time. Working: gradient = acceleration and area = distance travelled is the correct pairing. Swapping the two quantities completely, gradient = distance travelled and area = acceleration, is the reverse of what each actually measures. Keeping gradient = acceleration correct but then also claiming area = acceleration too is wrong because the area is a different physical quantity, distance, not a second way of finding the same rate. Claiming the gradient itself gives the speed confuses the RATE OF CHANGE of the plotted quantity with the plotted quantity itself — the gradient is how fast the speed is changing, not the speed. On any rate graph, the gradient of the graph is always the RATE at that instant, and the area under the graph is always the TOTAL AMOUNT accumulated — keep straight which of the two questions each one answers.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
- (c) £840 — Method: find the total amount raised using the reverse percentage, then subtract the entry fees to find the donations. Working: £1,260 is 60% of the total, so the total is £1,260 ÷ 0.6, and subtracting the entry fees from this total leaves £840 raised through donations. Answer: £840. £2,100 comes from correctly finding the total amount raised but then forgetting to subtract the entry fees, giving the total instead of the donations alone. £504 comes from working out 40% of the entry fees themselves, £1,260 × 0.4 = £504, instead of first finding the total amount raised. £1,890 comes from treating £1,260 as 40% of the total instead of 60%, dividing by 0.4 to get a total of £3,150, and then subtracting the entry fees from that incorrect total.
- (c) 448.00 US dollars — Method: multiply the amount in pounds by the exchange rate. Working: £350 × 1.28 = 448.00 US dollars. Wrong options: 273.44 US dollars comes from dividing by the rate instead of multiplying (350 ÷ 1.28); 351.28 US dollars comes from adding the rate to the amount instead of multiplying; 4,480.00 US dollars comes from a decimal-point slip, using 12.8 instead of 1.28.
- (a) 80 km/h — Average speed = total distance ÷ total time. Total distance = 45 + 75 = 120 km. Total time = 30 minutes + 1 hour = 1.5 hours. 120 ÷ 1.5 = 80 km/h. 60 km/h comes from treating the 30 minutes as a whole hour, giving a total time of 2 hours instead of 1.5 (120 ÷ 2). 82.5 km/h comes from averaging the two separate speeds (45 ÷ 0.5 = 90 km/h and 75 ÷ 1 = 75 km/h, then (90 + 75) ÷ 2) instead of using total distance over total time. 75 km/h comes from using only the second part of the journey (75 km in 1 hour) and ignoring the first part.
- (c) 4 km — Since signal strength is inversely proportional to the square of the distance, S = k/d². Using d = 2, S = 20: 2² = 4, so 20 = k ÷ 4, giving k = 20 × 4 = 80. The equation is S = 80/d². When S = 5: d² = 80 ÷ 5 = 16, so d = 4 (taking the positive root, since distance cannot be negative). Stopping at d² = 16 without taking the square root leaves 16, the square of the distance, not the distance itself. Treating the relationship as inversely proportional to distance itself, rather than to its square, gives k = 20 × 2 = 40 and then d = 40 ÷ 5 = 8, a different relationship. Multiplying by S instead of dividing by it when isolating d² gives d² = 80 × 5 = 400 and d = 20, the wrong operation. The distance at which the signal strength is 5 units is 4 km.
- (b) 24 km/h — First convert 45 minutes to hours: 45 ÷ 60 = 0.75 hours. Then divide the distance by the time: 18 ÷ 0.75 = 24 km/h. Reading 45 minutes as 0.45 hours (writing the minutes after the decimal point instead of dividing by 60) gives 18 ÷ 0.45 = 40 km/h. Working out 18 × 0.75 = 13.5 multiplies by the time instead of dividing. Working out 18 ÷ 45 = 0.4 divides by 45 without ever converting the minutes to hours. The cyclist's average speed is 24 km/h.
- (c) £338.69 — To increase by 12% each year, multiply by 1.12 twice. £270 × 1.12 × 1.12 = £338.688, which rounds to £338.69 (nearest penny, since the third decimal place is 8). £334.80 comes from treating the two 12% increases as a single flat 24% increase applied once instead of compounding: £270 × 1.24 = £334.80. £302.40 comes from applying the 12% increase only once, for 1 year instead of 2: £270 × 1.12 = £302.40. £338.68 comes from rounding £338.688 down to the nearest penny instead of up.