Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) 4 m/s — The average rate of change of distance with respect to time over an interval is the change in distance divided by the change in time — the gradient of the chord joining the two endpoints, not the gradient of any tangent inside the interval. From t = 3 to t = 8 the change in time is 8 − 3 = 5 and the change in distance is 32 − 12 = 20, so the average speed is 20 ÷ 5 = 4 m/s. Reporting the change in distance on its own, as 20 m/s, is not a speed: those 20 metres were covered over the whole 5 seconds, not in one second, so the 20 still has to be divided by the 5. The tangent's gradient of 3 m/s is the instantaneous speed at the single moment t = 6, not the average over the whole 5-second interval, so it must not be used here. Adding the change in distance and the change in time instead of dividing gives 20 + 5 = 25, which is not a speed. The average speed of the cyclist over the interval is 4 m/s.
- (c) They are in direct proportion, because y ÷ x = 2.5 for both pairs. — Testing direct proportion means checking that y ÷ x is the same for every pair: 15 ÷ 6 = 2.5 and 25 ÷ 10 = 2.5, so the quantities are in direct proportion. Saying they are not in proportion because x + y differs uses addition, which is not the correct test for proportion. Saying they are not in proportion because y − x differs also uses the wrong test — subtraction, not division. Saying they are in proportion because x × y is 90 and 250 uses multiplication, which is the test for inverse proportion, and the two products are not even equal to each other, so this option also contradicts itself.
- (d) Gradient = acceleration; area = distance travelled. — Method: on a speed–time graph, the gradient of the graph at an instant is the rate of change of speed with time, which is acceleration; the area between the graph and the time-axis over an interval is the total distance covered in that interval, because it accumulates speed × time. Working: gradient = acceleration and area = distance travelled is the correct pairing. Swapping the two quantities completely, gradient = distance travelled and area = acceleration, is the reverse of what each actually measures. Keeping gradient = acceleration correct but then also claiming area = acceleration too is wrong because the area is a different physical quantity, distance, not a second way of finding the same rate. Claiming the gradient itself gives the speed confuses the RATE OF CHANGE of the plotted quantity with the plotted quantity itself — the gradient is how fast the speed is changing, not the speed. On any rate graph, the gradient of the graph is always the RATE at that instant, and the area under the graph is always the TOTAL AMOUNT accumulated — keep straight which of the two questions each one answers.
- (c) 32 km/h — Method: to change mph into km/h, multiply by the number of kilometres in a mile. Working: 20 × 1.6 = 32 km/h. So the cyclist's speed is 32 km/h. Distractor 12.5 km/h comes from dividing by 1.6 instead of multiplying. Distractor 21.6 km/h comes from adding 1.6 instead of multiplying by it. Distractor 20 km/h comes from not converting the units at all.
- (a) No — the cost per metre differs: £2.50/m vs £2.20/m — Method: divide cost by length for each pair and compare the unit rates. Working: £7.50 ÷ 3 = £2.50 per m; £11.00 ÷ 5 = £2.20 per m. The rates are different, so this is NOT direct proportion. Wrong options: 'Yes — both amounts increase' wrongly assumes any increasing relationship is proportional; 'No — because 5 m costs more in total' judges by total cost rather than the rate per metre, which is not valid reasoning on its own; 'Yes — the cost per metre is £2.50 in both cases' miscalculates the second rate (11.00 ÷ 5 is £2.20, not £2.50).
- (b) 4.5 m² — The height ratio is 40 : 60, which simplifies to 2 : 3, so the larger bookcase is 1.5 times as tall as the smaller one. Areas scale with the square of the length scale factor, so the wood needed scales by 1.5² = 2.25. 2 × 2.25 = 4.5, so the larger bookcase needs 4.5 m² of wood. Giving 3 m² uses the length scale factor, 1.5, without squaring it (2 × 1.5 = 3). Giving 6.75 m² cubes the scale factor, 1.5³ = 3.375, as if wood coverage were a volume (2 × 3.375 = 6.75). Giving 2.25 m² is the squared scale factor on its own, without multiplying by the smaller bookcase's wood area of 2 m².
- (a) 12 m² — Real length = 8 × 50 = 400 cm = 4 m. Real width = 6 × 50 = 300 cm = 3 m. Real area = 4 × 3 = 12 m². Scaling the plan area (8 × 6 = 48 cm²) by 50 instead of by 50 squared gives 48 × 50 = 2400 cm² = 0.24 m² — area scales by the square of the length scale factor, not the scale factor itself. Multiplying the real dimensions in centimetres, 400 × 300 = 120 000, and calling the result 120 000 m² mistakes square centimetres for square metres. Converting only the length to metres and leaving the width as 6 (treating centimetres as metres), 4 × 6 = 24, gives 24 m², from a scaling that was never finished.
- (b) The 2.4 kg bag, since it costs £1.80 per kg compared with £1.90 per kg for the 1.5 kg bag. — To compare value for money, work out the cost per kilogram for each bag. 1.5 kg bag: £2.85 ÷ 1.5 = £1.90 per kg. 2.4 kg bag: £4.32 ÷ 2.4 = £1.80 per kg. Since £1.80 is less than £1.90, the 2.4 kg bag gives better value. The option comparing £2.85 with £4.32 directly is wrong because it compares the total prices, not the price per kilogram — a bigger bag naturally costs more in total even if it is better value. The option that names the 1.5 kg bag with £1.80 per kg and the 2.4 kg bag with £1.90 per kg has the correct unit prices but has swapped which bag they belong to. The option giving £1.19 per kg and £2.88 per kg comes from dividing each price by the wrong bag's mass (£2.85 ÷ 2.4 and £4.32 ÷ 1.5).
- (b) 15 — Find the multiplier connecting y to x: 10 ÷ 4 = 2.5. Then apply it to the new value of x: 2.5 × 6 = 15. Working out 10 + (6 − 4) = 12 adds the change in x straight onto y instead of scaling proportionally. Working out 10 × 6 = 60 multiplies the given y-value by the new x-value directly, without finding the multiplier first. Writing 10 keeps y the same as before, not realising it must change with x. When x = 6, y = 15.
- (d) 10 — First find the height at each end of the chord. At t = 1, h = 30 × 1 − 5 × 1² = 30 − 5 = 25. At t = 3, h = 30 × 3 − 5 × 3² = 90 − 45 = 45. The gradient of the chord estimates the instantaneous rate at the midpoint t = 2: 45 − 25 = 20, then 20 ÷ (3 − 1) = 20 ÷ 2 = 10 m/s. Finding the change in height but forgetting to divide by the change in time gives 20, which is a distance, not a rate. Averaging the two heights instead of finding the difference gives (25 + 45) ÷ 2 = 70 ÷ 2 = 35. Subtracting in the wrong order, 25 − 45 = −20, then −20 ÷ 2 = −10, gives the correct size with the sign flipped — the rocket is rising, not falling, at t = 2 seconds, so a negative rate cannot be right here.
- (a) 46.8 km/h — Method: 1 hour = 60 minutes, so a rate given in kilometres per minute is converted to kilometres per hour by multiplying by 60. Working: 0.78 × 60 = 46.8, so the instantaneous rate of change is 46.8 kilometres per hour. Keeping the given value unchanged and only relabelling the unit gives 0.78 km/h, which ignores that the time unit has changed. Dividing by 60 instead of multiplying — as you would when converting to a larger length unit — gives 0.78 ÷ 60 = 0.013 km/h, the wrong direction for a rate measured against a larger time unit. Adding 60 to the given rate instead of multiplying by it gives 0.78 + 60 = 60.78 km/h. Converting a rate always means multiplying or dividing by the conversion factor between the units, never adding it, and the direction depends on whether the new time unit is bigger or smaller than the old one.
- (b) 2, the cost in pounds of each extra gigabyte — Method: the gradient is the change in cost divided by the change in data, so it is the cost of each extra gigabyte; the value where the line meets the vertical axis is the charge before any data is used, which is a different quantity. Working: from (0, 10) to (8, 26) the cost rises by 26 − 10 = 16 pounds while the data rises by 8 − 0 = 8 gigabytes, so the gradient is 16 ÷ 8 = 2, meaning each extra gigabyte costs £2. Answer: 2, the cost in pounds of each extra gigabyte. The distractors: '10, the cost in pounds of each extra gigabyte' reads the intercept as the gradient, but 10 is what the tariff costs when no data at all has been used; '3.25, the cost in pounds of each extra gigabyte' comes from 26 ÷ 8, treating the line as though it passed through the origin when it starts at 10; '2, the fixed monthly charge in pounds' has the gradient right but describes the intercept, and the fixed charge on this tariff is £10.
- (c) 1.05 litres — Method: find the value of one part of the ratio from the total volume, then find the share for pineapple juice. Working: the ratio 5:3:2 has 5 + 3 + 2 = 10 parts, so one part is 3.5 ÷ 10 = 0.35 litres, and the pineapple juice is 3 × 0.35 = 1.05 litres. So 1.05 litres of pineapple juice is needed. Distractor 1.75 litres is the volume of orange juice, not pineapple juice. Distractor 0.7 litres is the volume of lemonade, not pineapple juice. Distractor 0.35 litres is the value of one part, found correctly but never multiplied by 3.
- (b) 5 years — The recurrence P_{n+1} = 1.1P_n − 30 must be applied once per year, checking after each application whether the population has passed 460. Starting from P_0 = 400: 400 × 1.1 − 30 = 410, so P_1 = 410. Then 410 × 1.1 − 30 = 421, so P_2 = 421. Then 421 × 1.1 − 30 = 433.1, so P_3 = 433.1. Then 433.1 × 1.1 − 30 = 446.41, so P_4 = 446.41, which is still below 460. Then 446.41 × 1.1 − 30 = 461.051, so P_5 = 461.051, the first value above 460. The population first exceeds 460 after 5 complete years. Stopping at P_4 = 446.41 and reporting 4 years reports the last year the population was still below 460, not the first year it was above. Counting the starting value P_0 = 400 as a year of growth makes P_5 the sixth number in the list and gives 6 years, but P_0 is the population before any year has passed, so P_5 is reached after 5 years, not 6. Reading "exceed 460" as "exceed the starting population of 400" instead gives P_1 = 410, already above 400, and 1 year — but the threshold named in the question is 460, not the starting value, so always check every value against the number actually stated in the question.
- (c) £338.69 — To increase by 12% each year, multiply by 1.12 twice. £270 × 1.12 × 1.12 = £338.688, which rounds to £338.69 (nearest penny, since the third decimal place is 8). £334.80 comes from treating the two 12% increases as a single flat 24% increase applied once instead of compounding: £270 × 1.24 = £334.80. £302.40 comes from applying the 12% increase only once, for 1 year instead of 2: £270 × 1.12 = £302.40. £338.68 comes from rounding £338.688 down to the nearest penny instead of up.
Build your own mix at the worksheet builder.