Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 15.3 litres — Squash : water = 2 : 9, so water is 9 ÷ 2 = 4.5 times the amount of squash. Multiply: 3.4 × 4.5 = 15.3 litres. Using the multiplier upside down — treating squash as 9 ÷ 2 times water, when it is water that is 9 ÷ 2 times squash — and calculating 3.4 × (2 ÷ 9) gives about 0.8 litres (to 1 d.p.); that would be the squash needed for 3.4 litres of water, not the water needed for 3.4 litres of squash. Adding the difference between the ratio parts, 9 − 2 = 7, to the squash amount, 3.4 + 7 = 10.4, mistakes a ratio for a fixed extra amount. Using the total number of parts, 2 + 9 = 11, so the multiplier 11 ÷ 2 = 5.5, gives 3.4 × 5.5 = 18.7 litres — that finds the total mix from the squash amount, not the water alone.
- (c) 250 miles — Find the distance travelled in 1 hour: 150 ÷ 3 = 50 miles. Multiply by 5 hours: 50 × 5 = 250 miles. Giving 300 miles doubles the original distance (150 × 2 = 300) using a scale factor of 2 instead of the correct 5 ÷ 3. Giving 200 miles adds only one extra hour's distance, 50, instead of the two extra hours actually needed (150 + 50 = 200, rather than 150 + 100). Giving 90 miles divides by the scale factor instead of multiplying (150 × 3 ÷ 5 = 90).
- (d) 1 : 1 — Sugar and butter together make 3 + 5 = 8 parts of the mixture. Comparing flour to this, 8 : 8, simplifies to 1 : 1. Giving 1 : 2 compares flour with the whole mixture (8 + 3 + 5 = 16 parts, giving 8 : 16 = 1 : 2) instead of with the rest of the mixture. Giving 3 : 5 is the ratio of sugar to butter, not of flour to the rest of the mixture. Giving 8 : 3 compares flour only with sugar, leaving butter out altogether.
- (d) Profit is decreasing by £10 per £1 rise in price. — The gradient of a tangent gives the instantaneous rate of change of profit with respect to price, found from the change in profit divided by the change in price between two points on the tangent. Here the tangent passes through (12, 540) and (18, 480), so the change in profit is 480 − 540 = −60 and the change in price is 18 − 12 = 6. The gradient is −60 ÷ 6 = −10. A negative gradient means profit is decreasing as price increases, so profit is decreasing at an instantaneous rate of £10 for every £1 rise in price. Subtracting the profits in the wrong order, 540 − 480 = 60, and dividing by the same change in price, 60 ÷ 6 = 10, gives a positive value and the wrong direction — profit is not increasing at £15. Stopping after finding only the change in profit, 480 − 540 = −60, without dividing by the change in price, is not a rate at all. Reading off the change in price, 6, and calling it the rate gives £6 per £1 rise in price, but 6 is only the width of the price interval — it is not a change in profit at all, and profit falls across that interval, so the direction is wrong too. The instantaneous rate of change of profit with respect to price at £15 is a decrease of £10 per £1 rise in price.
- (d) 218 — The rule x_{n+1} = 0.8x_n + 50 must be applied once for each step, using the result of the previous step every time — not the same starting value repeated. Starting from x_0 = 200: 0.8 × 200 = 160, so x_1 = 160 + 50 = 210. Then 0.8 × 210 = 168, so x_2 = 168 + 50 = 218. Stopping after one iteration leaves x_1 = 210, not x_2. Applying only the multiplier twice without adding 50 at each step uses 0.8² = 0.64, and 0.64 × 200 = 128, which drops the 50 completely. Adding 50 twice at the end instead of once per step, 128 + 100 = 228, still does not reproduce the actual recurrence, because the 50 added at the first step is itself multiplied by 0.8 at the second step. After two iterations, x_2 = 218.
- (b) 62.5% — Total parts = 5 + 3 = 8. Apples make up 5 parts, so the percentage is 5/8 × 100 = 62.5%. A student who finds the oranges' share instead gets 3/8 × 100 = 37.5%. A student who assumes an even split gets 50%. A student who inverts the fraction gets 8/5 × 100 = 160%.
- (c) £3,200 — Method: find the value of one part of the ratio from the first investor's amount, then work out the second investor's share before adding both together. Working: £1,200 is 3 parts, so one part is £1,200 ÷ 3 = £400. The second investor's share is 5 × £400 = £2,000, and the total is £1,200 + £2,000 = £3,200. So the total invested is £3,200. Distractor £2,000 is only the second investor's share, without adding the first investor's £1,200. Distractor £2,400 comes from doubling the first investor's amount instead of using the ratio. Distractor £6,000 comes from multiplying £1,200 by 5 directly instead of first finding the value of one part.
- (b) −3 — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, with both changes taken in the same direction along the line. Working: going from (1, 20) to (5, 8) the change in y is 8 − 20 = −12 and the change in x is 5 − 1 = 4, so the gradient is −12 ÷ 4 = −3. Answer: −3, and the negative sign is expected because the line falls from left to right. The distractors: 3 comes from subtracting the smaller y from the larger, 20 − 8 = 12, while still taking the x values from left to right, which loses the minus sign that says the line falls; −12 is the change in y left undivided by the change in x of 4; −1/3 comes from dividing the change in x by the change in y, 4 ÷ (−12), turning the gradient upside down.
- (d) 100 — Rearrange L = 0.6L + 40 by collecting the L terms on one side: L − 0.6L = 40, which gives 0.4L = 40, then L = 40 ÷ 0.4 = 100. Subtracting the other way round, 0.6L − L = 40, gives −0.4L = 40, then L = 40 ÷ (−0.4) = −100 — a sign error that flips the answer negative even though a long-run value here must be positive. Ignoring the 0.6L term completely and solving L = 40 directly gives 40, which throws away the recurrence's own multiplier. Dividing 40 by 0.6 instead of by the correct coefficient 0.4 gives 40 ÷ 0.6 ≈ 66.7, a slip that comes from dividing by the coefficient of L on the RIGHT of the original equation rather than by what is left once the L terms are collected on one side. Always collect the L terms first, then divide by whatever coefficient of L remains.
- (c) 70 cm — Method: convert the real length to centimetres, then divide by the scale factor. Working: 84 m = 8400 cm. 8400 ÷ 120 = 70 cm. Wrong options: 0.7 cm comes from dividing 84 by 120 without converting metres to centimetres; 1,008,000 cm comes from multiplying instead of dividing (8400 × 120); 7 cm comes from converting 84 m to 840 cm (using ×10 instead of ×100) before dividing.
- (a) 12 — Speed × time is constant: k = 20 × 15 = 300. At 25 pages per minute, the time is 300 ÷ 25 = 12 minutes. Getting 18.75 comes from treating speed and time as directly proportional and working out 15 × 25 ÷ 20 instead of dividing k by the new speed. Getting 20 comes from adding the increase in speed (25 − 20 = 5) onto the time (15 + 5 = 20). Getting 10 comes from subtracting that same increase in speed from the time (15 − 5 = 10).
- (d) £2.00 — Cost for Printer A = 200 × £0.04 = £8. Cost for Printer B = 200 × £0.05 = £10. Difference = £10 − £8 = £2.00.
- (c) 48 mm — Method: extension = k × force, where k = extension ÷ force. Working: k = 12 ÷ 5 = 2.4 mm per N. At 20 N: extension = 2.4 × 20 = 48 mm. Wrong options: 32 mm comes from adding the extension and force numbers instead of scaling (12 + 20); 3 mm comes from treating the relationship as inverse proportion (12 × 5 ÷ 20); 36 mm comes from using an incorrect scale factor of 3 between the forces instead of the correct factor of 4 (20 ÷ 5).
- (d) £30.00 — The gradient is (130 − 70) ÷ (5 − 2) = 60 ÷ 3 = £20 per hour. Using the point (2, 70): the cost for 2 hours at £20 per hour is 20 × 2 = £40, so the call-out fee is 70 − 40 = £30. Taking the C-value of the first point as the fee without subtracting the hourly cost gives £70.00 — but that point already includes 2 hours of the hourly rate. Using the gradient itself as the fee, £20.00, confuses the rate per hour with the fixed charge. Subtracting 20 × 3 = 60 instead of 20 × 2 = 40 (using the wrong h-value) gives 70 − 60 = £10.00.
- (c) 40 — Working out successive terms shows where the sequence is heading, but the terms themselves keep changing — the limit is the value where the sequence stops changing, so x_{n+1} = x_n = L there. Substituting into the rule: L = 0.5L + 20. Subtracting 0.5L from both sides: L − 0.5L = 20, so 0.5L = 20, and L = 20 ÷ 0.5 = 40. The individual terms are x_1 = 0.5 × 0 + 20 = 20, x_2 = 0.5 × 20 + 20 = 30 and x_3 = 0.5 × 30 + 20 = 35, getting closer to this value but not equal to it — 35 is only the third term, not the limit. Multiplying by 0.5 instead of dividing at the final step, 20 × 0.5 = 10, undoes the rearrangement rather than completing it, and gives a value smaller than terms the sequence has already passed. Writing the fixed-point equation with the wrong sign, L = 0.5L − 20, gives 0.5L = −20 and L = −40, which cannot be right since every term in the sequence is positive and increasing. The value the sequence is approaching is 40.
Build your own mix at the worksheet builder.