Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 4 — Method: find the length scale factor by taking the cube root of the volume scale factor, then square it to get the area scale factor. Working: 8 = 2³, so the length scale factor is 2, and the area scale factor is 2² = 4. Answer: 4. 8 comes from using the volume scale factor itself as if it were the area scale factor. 64 comes from squaring the volume scale factor, 8² = 64, instead of first taking its cube root. 2 comes from correctly finding the length scale factor but then forgetting to square it.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (b) 7980 — After the first year: 8000 × 0.95 = 7600. After the second year: 7600 × 1.05 = 7980. 8000 comes from assuming a 5% decrease followed by a 5% increase returns exactly to the starting number — it does not, because the increase acts on the smaller, already-reduced number. 8400 comes from applying only the second year's 5% increase to the original number: 8000 × 1.05 = 8400. 7600 comes from applying only the first year's 5% decrease and stopping there, without applying the second year's increase.
- (c) 448.00 US dollars — Method: multiply the amount in pounds by the exchange rate. Working: £350 × 1.28 = 448.00 US dollars. Wrong options: 273.44 US dollars comes from dividing by the rate instead of multiplying (350 ÷ 1.28); 351.28 US dollars comes from adding the rate to the amount instead of multiplying; 4,480.00 US dollars comes from a decimal-point slip, using 12.8 instead of 1.28.
- (b) £13,860 — Method: apply the first year's percentage decrease, then apply the second year's percentage decrease to the new value. Working: after the first year, the car is worth £17,500 × 0.88. Multiplying this result by 0.90 gives the value at the end of the second year, £13,860. Answer: £13,860. £13,650 comes from adding the two percentages together (12% + 10% = 22%) and applying a single 22% decrease, £17,500 × 0.78 = £13,650, instead of applying the decreases one after the other. £15,750 comes from applying only the second year's 10% decrease to the original price, forgetting the first year's decrease entirely, £17,500 × 0.90 = £15,750. £15,400 comes from applying only the first year's 12% decrease and stopping there, forgetting to apply the second year's decrease at all.
- (d) Faster at t = 8s — still accelerating — The gradient of a tangent on a distance-time graph is the instantaneous speed, in m/s. At t = 2 seconds the speed is 6 m/s; at t = 8 seconds it is 9.5 m/s, which is faster, so the sprinter is still accelerating between these two times. Saying the sprinter is slower at t = 8s reverses the comparison — 9.5 is greater than 6, not less. Writing 9.5 − 6 = 3.5 and calling this 'metres further covered' turns the difference of two speeds into a distance, which the units do not support: a difference of two speeds is itself a speed, not a distance. Taking 9.5 m/s, the larger of the two instantaneous speeds, as the average speed for the whole race confuses a speed at one instant with an average over the whole distance, which would need the total distance and total time, not two tangent gradients.
- (a) 6 — Since y is inversely proportional to x², y = k/x². Using x = 2, y = 45: 2² = 4, so 45 = k ÷ 4, giving k = 45 × 4 = 180. The equation is y = 180/x². When y = 5: x² = 180 ÷ 5 = 36, so x = 6, taking the positive root because the question states that x is positive. Treating the relationship as inversely proportional to x itself gives k = 45 × 2 = 90 and then x = 90 ÷ 5 = 18, a different relationship. Multiplying by y instead of dividing by it when isolating x² gives x² = 180 × 5 = 900 and x = 30, the wrong operation. Stopping at x² = 36 without taking the square root leaves 36, not the value of x. When y = 5, x = 6.
- (b) 120 minutes — Method: find the rate in bottles per minute, then divide the order size by the rate. Working: rate = 810 ÷ 45 = 18 bottles per minute. Time = 2,160 ÷ 18 = 120 minutes. Wrong options: 1,350 minutes comes from subtracting 810 from 2,160 instead of using the rate; 48 minutes comes from dividing the order size by the original time (2,160 ÷ 45) instead of the rate; 108 minutes comes from rounding the rate to 20 bottles per minute before dividing.
- (c) Height rising at 2 m/s at t = 1.5 s — A tangent's gradient on a height-time graph is the instantaneous rate of change of height, in metres per second, so gradient 2 means the ball's height is increasing at 2 m/s at t = 1.5 s. Saying the height 'is 2 m' confuses the gradient, a rate, with the y-value on the graph, which is the ball's height itself. Saying the ball 'travelled 2 m from t = 1 to t = 2' treats the instantaneous gradient at one instant as if it were the total distance risen over a whole one-second interval, which is a different quantity found from two height readings, not from one tangent. Saying the speed 'is 2 m/s²' uses the wrong units — m/s² measures acceleration, the rate of change of speed, not speed itself. Always check that the units quoted match what a height-time graph's gradient can actually give you: metres per second.
- (c) 54 — Method: y = kx, so k = y ÷ x. Working: k = 18 ÷ 5 = 3.6. At x = 15: y = 3.6 × 15 = 54. Wrong options: 28 comes from adding the change in x (10) onto y instead of scaling; 6 comes from treating the relationship as inverse proportion (k = 5 × 18 = 90, then y = 90 ÷ 15 = 6); 60 comes from rounding the constant up to 4 instead of using 3.6.
- (c) 3 hours — Method: inverse proportion means speed × time is constant for the journey, so find that constant and divide it by the new speed. Working: 60 × 2 = 120, which is the distance in kilometres; at 40 km/h the time is 120 ÷ 40 = 3 hours. Answer: 3 hours. The distractors: 1.5 hours is the ratio of the speeds, 60 ÷ 40, given as a time instead of being used to scale the original 2 hours; 1 hour 20 minutes comes from treating time as directly proportional to speed, 2 × 40 ÷ 60, which has the slower train arriving sooner; 2 hours comes from finding the constant 120 and then dividing it by the original 60 km/h again, so the time never changes.
- (d) A falling curve that never touches either axis — Method: inverse proportion means the product of the two quantities is constant, so P = k ÷ Q; as Q grows P shrinks, and P can never reach zero because k divided by a number is never zero. Working: taking k = 12 as an example, the pairs (1, 12), (2, 6), (3, 4), (6, 2) and (12, 1) drop steeply at first and then flatten out, so the graph is a curve that approaches both axes without meeting either of them. Answer: a falling curve that never touches either axis. The distractors: 'a straight line through the origin' is the graph of direct proportion, P = kQ, which is the opposite relationship; 'a straight line with a negative gradient' is the commonest error, reading 'P falls as Q rises' as a straight line, but on such a line P would drop by the same amount for every increase in Q and would cross the horizontal axis into negative values; 'a straight line crossing the vertical axis above zero' is a relationship of the form P = mQ + c, in which P and Q are not proportional at all.
- (a) 12 m² — Real length = 8 × 50 = 400 cm = 4 m. Real width = 6 × 50 = 300 cm = 3 m. Real area = 4 × 3 = 12 m². Scaling the plan area (8 × 6 = 48 cm²) by 50 instead of by 50 squared gives 48 × 50 = 2400 cm² = 0.24 m² — area scales by the square of the length scale factor, not the scale factor itself. Multiplying the real dimensions in centimetres, 400 × 300 = 120 000, and calling the result 120 000 m² mistakes square centimetres for square metres. Converting only the length to metres and leaving the width as 6 (treating centimetres as metres), 4 × 6 = 24, gives 24 m², from a scaling that was never finished.
- (b) 12 — Since y is directly proportional to √x, y = k√x. Using x = 4, y = 8: √4 = 2, so 8 = k × 2, giving k = 8 ÷ 2 = 4. The equation is y = 4√x. When x = 9: √9 = 3, so y = 4 × 3 = 12. Treating the relationship as if y were proportional to x itself, rather than to √x, gives k = 8 ÷ 4 = 2 and then y = 2 × 9 = 18, which is a different relationship. Multiplying k by the new x-value instead of by its square root gives y = 4 × 9 = 36, skipping the square root altogether. Reporting √9 on its own, without multiplying by k, gives only 3, not the value of y. When x = 9, y = 12.
- (c) 150% — Percentage = (180,000 ÷ 120,000) × 100 = 150%.
Build your own mix at the worksheet builder.