Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) £6705 — After the first year: £6400 × 1.08 = £6912. After the second year: £6912 × 0.97 = £6704.64, which rounds to £6705 (nearest pound). £6720 comes from treating the +8% and −3% changes as a single net +5% change applied to the original amount instead of applying each change in turn: £6400 × 1.05 = £6720. £6912 comes from applying only the first year's growth and stopping there, without applying the second year's fall. £7104 comes from adding the two percentages together as +11% and applying that to the original amount instead of applying each change to the correct starting amount in turn: £6400 × 1.11 = £7104.
- (c) £32 — First find the gradient: (26 − 14) ÷ (50 − 20) = 12 ÷ 30 = £0.40 per minute. Using the point (20, 14), the charge for 65 minutes is 14 + 0.40 × (65 − 20) = 14 + 18 = £32. Choosing £26 comes from treating the charge as directly proportional to the time, multiplying the gradient by 65 minutes and ignoring the fixed part of the charge (0.40 × 65 = 26). Choosing £40 comes from treating £14 as if it were the charge at 0 minutes, then adding the gradient multiplied by the full 65 minutes (14 + 0.40 × 65 = 40), instead of multiplying by the extra time past 20 minutes. Choosing £33.80 comes from assuming the charge is directly proportional to the minutes already known, scaling up from the point (50, 26) in the ratio 65:50 (65 ÷ 50 × 26 = 33.80).
- (c) 14 litres — Method: find the amount of fuel used per km first, then use it to find the fuel needed for 175 km. Working: 24 ÷ 300 = 0.08 litres per km, and 0.08 × 175 = 14 litres. So 14 litres are needed. Distractor 24 litres comes from assuming the same amount of fuel is used no matter the distance, without scaling. Distractor 21 litres comes from misreading the original distance as 200 km instead of 300 km. Distractor 1.4 litres comes from a decimal-point slip, giving an answer ten times too small.
- (c) £7617.60 — To decrease by 8% each year, multiply by 0.92 (100% − 8%) twice. £9000 × 0.92 × 0.92 = £7617.60. £7560.00 comes from treating the two 8% decreases as a single flat 16% decrease applied once instead of compounding: £9000 × 0.84 = £7560.00. £8280.00 comes from applying the 8% decrease only once, for 1 year instead of 2: £9000 × 0.92 = £8280.00. £10497.60 comes from multiplying by 1.08 twice, increasing the value instead of decreasing it: £9000 × 1.08 × 1.08 = £10497.60.
- (a) £102 — Method: find the value of one part of the ratio, then work out each group's share before comparing them. Working: the ratio 5:2 has 5 + 2 = 7 parts, so one part is £238 ÷ 7 = £34. Adults donate 5 × £34 = £170 and children donate 2 × £34 = £68, so adults donate £170 − £68 = £102 more than children. So the difference is £102. Distractor £68 is only the children's donation, without finding the difference. Distractor £170 is only the adults' donation, without finding the difference. Distractor £136 comes from doubling the children's donation instead of subtracting it from the adults' donation.
- (d) £3.60 per component — The gradient of a cost-against-components graph has units of pounds per component, since cost is measured in pounds and the horizontal axis counts components. So 3.60 means it costs an extra £3.60 to produce one more component at that point. Calling it '£3.60 total cost' confuses the gradient, a rate, with the y-value on the graph, which is the total cost itself. Giving it as 3.60 components per pound swaps which axis is on top, giving the units of the reciprocal gradient, not the gradient itself. Turning 3.60 into a percentage invents a unit that has no basis in the graph's axes — a gradient here is a number of pounds, not a percentage. Always build the gradient's units from the two axes' own units, in the order y-axis over x-axis.
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (a) 4 hours — This is inverse proportion: more pumps take less time. Multiply the original numbers to find the total pump-hours needed: 2 × 10 = 20 pump-hours. Divide by the new number of pumps: 20 ÷ 5 = 4 hours. Working out 10 × 5 ÷ 2 = 25 hours treats it as direct proportion, as if more pumps needed more time. Stopping at 20 gives the total pump-hours, not the number of hours. Working out 10 − (5 − 2) = 7 hours subtracts the extra number of pumps straight from the number of hours, treating pumps and hours as the same kind of quantity. 5 pumps take 4 hours.
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (c) 40 cm — First find the real pitch length using Plan A's scale: 8 × 1000 = 8000 cm. Now find its length on Plan B using Plan B's scale: 8000 ÷ 200 = 40 cm. Assuming both plans use the same scale and leaving the length as 8 cm ignores that Plan B has a different scale. Using the ratio of the two scales upside down, 200 ÷ 1000 = 0.2, then 8 × 0.2 = 1.6, gives 1.6 cm — Plan B is drawn to a larger scale than Plan A, so lengths on it should be bigger, not smaller. Dividing by 2000 instead of 200 gives 4 cm, ten times too small.
- (a) S_{n+1} = 1.04S_n − 30 — Adding 4% interest multiplies the balance by 1 + 0.04 = 1.04. Withdrawing £30 afterwards subtracts a fixed 30, giving S_{n+1} = 1.04S_n − 30. Writing +30 instead of −30 mistakes a withdrawal for a deposit — the £30 leaves the account, so it must be subtracted. Writing 0.96 instead of 1.04 treats the 4% as a decrease rather than an increase, as if the interest were shrinking the balance instead of growing it. Writing 1.4 instead of 1.04 turns 4% into 40%, a common slip when converting a percentage to a multiplier — 4% as a decimal is 0.04, so the multiplier is 1.04, not 1.4. Always convert the percentage to a decimal first, then add 1 for growth or subtract from 1 for decay, before applying any fixed amount that is added or removed.
- (c) 10,800 kg — Method: since the model and the real container are similar and made of the same material, mass scales with volume, so the mass scale factor is the length scale factor cubed. Working: 30³ = 27,000, so the real container's mass is 400 × 27,000 = 10,800,000 g, which is 10,800,000 ÷ 1,000 = 10,800 kg. Answer: 10,800 kg. 12 kg comes from using the length scale factor directly, 400 × 30 = 12,000 g, without cubing it. 360 kg comes from squaring the length scale factor instead of cubing it, 400 × 30² = 360,000 g. 10,800,000 kg comes from correctly cubing the scale factor but then forgetting to convert the mass from grams into kilograms.
- (a) 20 litres per minute — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, and its units are the vertical unit for each one of the horizontal unit. Working: from (2, 50) to (6, 130) the volume changes by 130 − 50 = 80 litres and the time changes by 6 − 2 = 4 minutes, so the gradient is 80 ÷ 4 = 20, measured in litres for each minute. Answer: 20 litres per minute. The distractors: 25 litres per minute comes from using one point on its own, 50 ÷ 2, which assumes the line starts at the origin when the tank already held 50 litres at 2 minutes; 0.05 litres per minute comes from dividing the change in time by the change in volume, 4 ÷ 80, which gives the time for each litre but is then labelled as litres for each minute; 20 minutes for each litre has the right value with the units the wrong way round, and a tank that needed 20 minutes to gain a single litre would be filling far more slowly than this one.
- (b) The 2.4 kg bag, since it costs £1.80 per kg compared with £1.90 per kg for the 1.5 kg bag. — To compare value for money, work out the cost per kilogram for each bag. 1.5 kg bag: £2.85 ÷ 1.5 = £1.90 per kg. 2.4 kg bag: £4.32 ÷ 2.4 = £1.80 per kg. Since £1.80 is less than £1.90, the 2.4 kg bag gives better value. The option comparing £2.85 with £4.32 directly is wrong because it compares the total prices, not the price per kilogram — a bigger bag naturally costs more in total even if it is better value. The option that names the 1.5 kg bag with £1.80 per kg and the 2.4 kg bag with £1.90 per kg has the correct unit prices but has swapped which bag they belong to. The option giving £1.19 per kg and £2.88 per kg comes from dividing each price by the wrong bag's mass (£2.85 ÷ 2.4 and £4.32 ÷ 1.5).
- (b) Provider Y — £21.00 against Provider X's £23.00 — Provider X's gradient is (35 − 15) ÷ 100 = 0.2, so cost = 15 + 0.2 × 40 = 15 + 8 = £23.00. Provider Y's gradient is (45 − 5) ÷ 100 = 0.4, so cost = 5 + 0.4 × 40 = 5 + 16 = £21.00. £21.00 is less than £23.00, so Provider Y is cheaper: 'Provider Y — £21.00 against Provider X's £23.00'. Getting both costs right but naming Provider X as cheaper compares the two numbers the wrong way round — £23.00 is more than £21.00, not less. Comparing only the fixed fees, £15.00 and £5.00, ignores the cost of the 40 gigabytes actually used. Reading off the costs at 100 gigabytes, £35.00 and £45.00, directly from the graph answers a different usage from the 40 gigabytes the question asks about.