Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 75 pages — Method: find the number of pages printed in one minute, then scale up to 10 minutes. Working: 45 ÷ 6 = 7.5 pages per minute, so 7.5 × 10 = 75 pages. Answer: 75 pages. 27 pages comes from using the ratio upside down, 45 × 6 ÷ 10, instead of finding the rate per minute first. 55 pages comes from simply adding the extra minutes, 10, onto the original number of pages, 45. 70 pages comes from rounding the rate down to 7 pages per minute before multiplying by 10, instead of using the exact rate of 7.5.
- (b) 250 g — Method: adding water changes the total mass but not the mass of salt, so find the salt, hold it fixed, use the new ratio to find the new total mass and subtract the mass already in the beaker. Working: 12:100 = x:500 gives 12 ÷ 100 × 500 = 60 g of salt; that 60 g must be 8% of the new mixture, so 8:100 = 60:y gives y = 60 ÷ 8 × 100 = 750 g; the water added is 750 − 500 = 250 g. Answer: 250 g. The distractors: 750 g is the mass of the diluted solution, given without taking away the 500 g that was in the beaker to start with; 60 g is the mass of salt, the quantity that stays the same, given instead of the mass of water; 20 g comes from treating the fall from 12% to 8% as 4% of the original 500 g, which measures a change in concentration as though it were a mass of water.
- (a) 4/5 — Method: find the June takings first, then write them over the May takings and cancel. Working: the takings fell by £900, so June is £4500 − £900 = £3600; the fraction is 3600/4500, and dividing the numerator and the denominator by 900 gives 4/5. Answer: 4/5 of the May takings. The distractors: 1/5 comes from writing the fall over the May takings, 900/4500, which answers how far the takings dropped rather than what June's takings are compared with May's; 5/4 comes from writing May over June, 4500/3600, reversing the order the question asks for; 4/9 comes from writing June over the two months added together, 3600/8100, a part-to-whole fraction when the comparison asked for is with May alone.
- (b) 10000 cm² — Method: an area conversion factor is the square of the length conversion factor, because both sides of the square are scaled. Working: a square metre is a square of side 100 cm, so its area is 100 × 100 = 10000 cm². Answer: 10000 cm². The distractors: 100 cm² comes from using the length factor without squaring it; 200 cm² comes from doubling the length factor instead of squaring it; 1000000 cm² comes from cubing the factor, which is the conversion for a volume, not an area.
- (b) 5 litres — Method: adding water changes the total volume but adds no salt, so work out the volume of salt, then the total volume that makes that salt 20% of the mixture, then the extra water. Working: 30% of 10 litres is 0.3 × 10 = 3 litres of salt. For the same 3 litres to be 20% of the new mixture, the new total volume is 3 ÷ 0.2 = 15 litres. The water added is the extra volume, 15 − 10 = 5 litres. Answer: 5 litres. The distractors: 3 litres is the volume of salt in the solution, which is the first step and not what the question asks for; 15 litres is the total volume of the new mixture, which counts the 10 litres already in the container as water that was poured in; 2 litres comes from taking 20% of the original 10 litres, applying the new percentage to the old volume instead of to the new one.
- (a) 100 — The difference between the parts of the ratio is 7 − 3 = 4 parts, and this is worth 40 beads. Divide to find one part: 40 ÷ 4 = 10. The total number of parts is 7 + 3 = 10, so the total number of beads is 10 × 10 = 100. (40 is just the given difference between gold and silver, not the total. 70 is the number of gold beads only, using 7 parts. 30 is the number of silver beads only, using 3 parts.)
- (c) 3 : 5 — If orange juice is 3/8 of the total, apple juice is the remaining 1 − 3/8 = 5/8. The ratio of orange to apple is therefore 3 : 5. Inverting gives 5 : 3, apple to orange instead of orange to apple. Using the denominator 8 as the second part of the ratio, 3 : 8, compares orange juice to the whole drink rather than to the apple juice alone. Pairing the total 8 with the apple fraction's numerator 5 gives 8 : 5, which mixes a whole-total figure with a part figure.
- (c) C = 1.5n — Method: a fixed ratio between C and n means C is always the same multiple of n, and that multiple is the cost of one bottle. Working: 3.00 ÷ 2 = 1.5, 7.50 ÷ 5 = 1.5 and 12.00 ÷ 8 = 1.5, so every bottle costs £1.50 and C = 1.5n. Answer: C = 1.5n. The distractors: C = n + 1 comes from subtracting on the first row, 3 − 2 = 1, and adding that difference instead of multiplying; it fits the first row and fails the other two, which is why three rows are given; C = 3n reads the £3.00 as the price of one bottle when it is the price of two; C = n/1.5 divides the number of bottles by the price of one bottle, which works out how many bottles a pound buys instead of what n bottles cost.
- (c) 500 — Pressure = force ÷ area = 250 ÷ 0.5 = 500 pascals. Getting 125 comes from multiplying the force by the area instead of dividing (250 × 0.5 = 125). Getting 249.5 comes from subtracting the area from the force instead of dividing. Getting 50 comes from misreading the area as 5 m² instead of 0.5 m² and dividing 250 by 5.
- (d) 1:4 — Convert 1.4 l to millilitres: 1.4 l = 1400 ml. The ratio is 350 : 1400. Divide both parts by 350: 350 ÷ 350 = 1 and 1400 ÷ 350 = 4, giving 1 : 4. Misreading 1.4 l as 14 (moving the decimal point) gives 350 : 14, which simplifies to 25 : 1 — a very different, implausible ratio. Dividing by 175 instead of 350 gives 2 : 8, which still shares a common factor of 2, so it is not fully simplified. Swapping the order gives 4 : 1, litres to millilitres the wrong way round.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (a) 70 km/h — Method: average speed for a whole journey is the total distance divided by the total time, not the mean of the separate speeds. Working: 3 × 80 = 240 km and 1 × 40 = 40 km, giving 280 km in 3 + 1 = 4 hours, so 280 ÷ 4 = 70. Answer: 70 km/h. The distractors: 60 km/h comes from taking the mean of 80 and 40, which would only be right if equal times were spent at each speed; 280 km/h is the total distance written with a speed unit, from forgetting to divide by the total time; 80 km/h comes from quoting the speed of the longer leg as the average for the whole journey.
- (b) 48 m² — Method: lengths are multiplied by the scale factor, but areas are multiplied by its square. Working: 1 cm on the plan stands for 200 cm = 2 m, so 1 cm² on the plan stands for 2 × 2 = 4 m², and 12 × 4 = 48. Answer: 48 m². The distractors: 24 m² comes from scaling the area by the length factor 2 instead of by its square; 2400 m² comes from multiplying the area by the scale 200 as though it were a length; 4800 m² comes from working in centimetres, 12 × 200² = 480 000 cm², and then dividing by 100 instead of by 10 000 to reach square metres.
- (a) 80 km/h — Average speed = total distance ÷ total time. Total distance = 45 + 75 = 120 km. Total time = 30 minutes + 1 hour = 1.5 hours. 120 ÷ 1.5 = 80 km/h. 60 km/h comes from treating the 30 minutes as a whole hour, giving a total time of 2 hours instead of 1.5 (120 ÷ 2). 82.5 km/h comes from averaging the two separate speeds (45 ÷ 0.5 = 90 km/h and 75 ÷ 1 = 75 km/h, then (90 + 75) ÷ 2) instead of using total distance over total time. 75 km/h comes from using only the second part of the journey (75 km in 1 hour) and ignoring the first part.
Build your own mix at the worksheet builder.