Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) The 750 g box, at 36p per 100 g — Work out the cost per 100 g of each box. 750 g box: 270p ÷ 7.5 = 36p per 100 g. 500 g box: 195p ÷ 5 = 39p per 100 g. The lower cost per 100 g is the better value, so the 750 g box at 36p per 100 g is the answer. Choosing the 500 g box at 39p per 100 g gets the maths right but picks the higher unit price, not realising a smaller cost per 100 g is the better deal. Choosing the 500 g box because £1.95 is lower than £2.70 compares the total prices without allowing for the different pack sizes at all. Working out 270 ÷ 5 = 54p divides the 750 g box's price by the wrong number of hundred-grams (the 500 g box's), giving a rate that belongs to neither box. The 750 g box, at 36p per 100 g, is the better value.
- (b) 4 : 25 — For similar shapes, the ratio of areas is the ratio of lengths squared: 2² : 5² = 4 : 25. 2 : 5 comes from using the perimeter ratio itself as the area ratio, without squaring it at all. 8 : 125 comes from cubing each part instead of squaring (2³ : 5³) — cubing is the rule for volume, not area. 4 : 5 comes from squaring only the first part of the ratio (2² = 4), and leaving the second part unsquared.
- (c) 5 hours — Method: measure the job in decorator-hours, which is in the same ratio as the number of rooms, then share the decorator-hours between the decorators available. Working: 5 decorators × 6 hours = 30 decorator-hours for 3 rooms, so one room takes 30 ÷ 3 = 10 decorator-hours; 5 rooms take 5 × 10 = 50 decorator-hours; shared between 10 decorators that is 50 ÷ 10 = 5 hours. Answer: 5 hours. The distractors: 3 hours comes from halving the 6 hours because the number of decorators doubles, while forgetting that there are also more rooms to paint; 10 hours comes from scaling the 6 hours up for the rooms only, 6 × 5 ÷ 3, and leaving the workforce at 5 decorators; 6 hours comes from assuming that doubling the decorators and increasing the rooms cancel each other out, which they do not, because the rooms rise by a factor of 5/3 and the workforce by a factor of 2.
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (d) 24 — Method: split 60 into 3 + 7 = 10 equal parts, find the value of one part, then use the difference in ratio parts. Working: 60 ÷ 10 = 6, so the numbers are 3 × 6 = 18 and 7 × 6 = 42, and their difference is 42 − 18 = 24. Answer: 24. 4 comes from finding the difference between the ratio numbers, 7 − 3, but forgetting to multiply by the value of one part. 60 comes from adding the two numbers back together instead of subtracting, which just repeats the given sum. 80 comes from dividing 60 by the first ratio number, 3, instead of by the total number of parts, 10, giving a part value of 20 and a difference of 7 × 20 − 3 × 20 = 80.
- (b) £60 — £48 represents 100% − 20% = 80% of the original price. 1% = £48 ÷ 80 = £0.60, so 100% = £0.60 × 100 = £60.
- (c) Average rate, t = 2 to 6, is −2°C/min — First find the temperature at each end of the interval. At t = 2, T = 80 − 6 × 2 + 0.5 × 2² = 80 − 12 + 2 = 70. At t = 6, T = 80 − 6 × 6 + 0.5 × 6² = 80 − 36 + 18 = 62. The average rate of change over the interval is the change in T divided by the change in t: 62 − 70 = −8, then −8 ÷ 4 = −2°C per minute, so the statement about the average rate is correct. The instantaneous rate at t = 6 is not −2: completing the square gives T = 0.5(t − 6)² + 62, so t = 6 is the turning point of the curve, where the tangent is horizontal and the rate is 0°C per minute — the reaction has stopped cooling by then. The instantaneous rate at t = 2 is not −2 either: a short chord centred on t = 2, from t = 1.9 (T = 70.405) to t = 2.1 (T = 69.605), gives −0.8 ÷ 0.2 = −4°C per minute, so the reaction is cooling twice as fast at the start of the interval as the average over it. Saying the temperature falls 2°C in total confuses the RATE, −2°C per minute, with a TOTAL drop, which is 70 − 62 = 8°C over the four minutes. Always check whether a figure is a rate, per minute, or a total change.
- (c) 24p — Method: change the price to pence, then find what one tenth of 1 kg costs, since 100 g is one tenth of 1 kg. Working: £2.40 = 240p per kg, and 240 ÷ 10 = 24p per 100 g. So the cost is 24p per 100 g. Distractor 2.4p comes from dividing by 100 instead of 10. Distractor 2400p comes from multiplying by 10 instead of dividing. Distractor 240p comes from using the price per kg without scaling it down to 100 g.
- (a) 1:8 — Convert 2 kg to grams: 2 kg = 2000 g. The ratio is 250 : 2000. The highest common factor of 250 and 2000 is 250. Divide both parts by 250: 250 ÷ 250 = 1 and 2000 ÷ 250 = 8, so the ratio is 1 : 8. Leaving the kilograms unconverted gives 250 : 2, which simplifies to 125 : 1 — the units on each side are different, so this does not compare like with like. Dividing by 50 instead of 250 gives 5 : 40, which still shares a common factor of 5, so it is not fully simplified. Swapping the order gives 8 : 1, grams to kilograms the wrong way round.
- (c) 9% — Method: a percentage concentration is the ratio of salt to solution written per 100 g, so scale each concentration to the mass it belongs to, add the two masses of salt, then scale the ratio of salt to mixture back to a denominator of 100. Working: 5:100 = x:400 gives 5 ÷ 100 × 400 = 20 g of salt, and 25:100 = y:100 gives 25 g of salt; the mixture holds 20 + 25 = 45 g of salt in 400 + 100 = 500 g of solution; 45:500 = 9:100. Answer: 9%. The distractors: 15% is the mean of 5% and 25%, which would only be right if the two masses were equal, and here one is four times the other; 21% comes from attaching the concentrations to the wrong masses, working out (400 × 25% + 100 × 5%) ÷ 500; 0.9% comes from working out 45 ÷ 500 = 0.09 and then moving the decimal point one place instead of two when writing the decimal as a percentage.
- (c) 1 : 25 — The radii are in the ratio 4 : 20, which simplifies to 1 : 5. Areas scale with the square of the length ratio, so the area ratio is 1² : 5² = 1 : 25. Giving 1 : 5 uses the radius ratio without squaring it. Giving 1 : 10 doubles the radius ratio instead of squaring it. Giving 25 : 1 has the areas the right way round for larger to smaller, not smaller to larger.
- (a) It's an average over 20 days, which may miss the day-5 rate. — Method: a chord's gradient is the AVERAGE rate of change across the whole interval it spans; it only closely approximates the INSTANTANEOUS rate of change at a point inside that interval when the rate of change is roughly constant across the interval, which usually means the interval needs to be short. Working: here the chord spans 20 days while the point of interest, t = 5, is only a quarter of the way along it, so if the reservoir's level rose or fell at different rates over that time, the chord's gradient will not be close to the true gradient of the curve at t = 5 — this is the correct reason. Claiming the chord's gradient needs the water level at every day in between is wrong: a chord's gradient needs only the two endpoint values, at t = 0 and t = 20. Claiming a chord can only estimate the rate at its own endpoints is wrong: a chord between two points can be used to estimate the instantaneous rate of change at any point inside the interval, including one that is not an endpoint — that is exactly the technique being used here, and it is the SIZE of the interval that makes the estimate poor, not the fact that t = 5 is an interior point. Claiming the units do not match is wrong: the chord's gradient and the instantaneous rate of change are both measured in metres per day, so the units are the same. A chord is only a good estimate of an instantaneous rate when the interval it spans is short enough that the rate does not change much within it — always check how long the interval is compared with how far it is to the point you actually want.
- (b) 1.5 km — Multiply the map length by the scale factor: 6 × 25000 = 150000 cm. Convert to kilometres, using 100 cm = 1 m and 1000 m = 1 km, so 100000 cm = 1 km: 150000 ÷ 100000 = 1.5 km. (1500 km comes from converting only as far as metres, 150000 ÷ 100 = 1500 m, and then writing kilometres on the end. 15 km comes from dividing by 10000 instead of 100000. 0.15 km comes from dividing by 1000000 instead of 100000.)
- (b) t = 5 and t = 7 (closest, evenly spaced) — To estimate the instantaneous rate of change at t = 6, use the chord centred on t = 6 with the closest readings on either side, t = 5 and t = 7. The gradient of this chord is 15.4 − 17.5 = −2.1, then −2.1 ÷ 2 = −1.05 cm per minute. The interval t = 3 to t = 9 is also centred on t = 6 but is wider: 13.4 − 18.7 = −5.3, then −5.3 ÷ 6 ≈ −0.88 cm per minute — this brings in more of the curve's own change in steepness, so it is a worse estimate of the rate at the single instant t = 6. Using t = 6 and t = 7 only gives 15.4 − 16.6 = −1.2, then −1.2 ÷ 1 = −1.2 cm per minute, but this is not centred on t = 6 — it estimates the rate over (6, 7), not at t = 6 itself. Using t = 0 and t = 6 gives 16.6 − 20.0 = −3.4, then −3.4 ÷ 6 ≈ −0.57 cm per minute, the average rate for the whole first six minutes, not the rate at the instant t = 6. Always choose the chord that brackets the point as closely as possible.
- (c) m = 6c — Method: the whole is the sum of the parts in the ratio, and the cement is 1 part, so one part weighs c kg. Working: the mix has 5 + 1 = 6 parts, each of mass c kg, so the total mass is 6 × c, giving m = 6c. Answer: m = 6c. The distractors: m = 5c uses the 5 gravel parts as the multiplier and forgets that the cement is in the mix too, so it gives the mass of the gravel and not the total; m = c + 5 comes from reading the ratio as '5 more than' and adding, which treats a number of parts as a mass in kilograms; m = c/6 turns the relationship upside down, as though the total were shared into the cement rather than the cement multiplied up to the total.
Build your own mix at the worksheet builder.