Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 5:8 — The mix has 5 parts sand and 3 parts cement, so 5 + 3 = 8 parts in total. Sand to total is 5 : 8, and since the highest common factor of 5 and 8 is 1, this is already in its simplest form. Giving 5 : 3 answers sand to cement, not sand to the total mix. Giving 3 : 8 is cement to total, the wrong part of the mix. Giving 8 : 5 has the total and the sand swapped round.
- (c) 1:2 — Convert £1.50 into pence: £1.50 = 150p, so the ratio is 75 : 150. Dividing both parts by 75 gives 1 : 2. Getting 50 : 1 comes from not converting the units at all and simplifying 75 : 1.5. Getting 2 : 1 has the two parts the wrong way round. Getting 3 : 4 comes from reading 75p as 3/4 of a pound and then comparing it with £1 instead of £1.50.
- (a) 1:8 — Convert 2 kg to grams: 2 kg = 2000 g. The ratio is 250 : 2000. The highest common factor of 250 and 2000 is 250. Divide both parts by 250: 250 ÷ 250 = 1 and 2000 ÷ 250 = 8, so the ratio is 1 : 8. Leaving the kilograms unconverted gives 250 : 2, which simplifies to 125 : 1 — the units on each side are different, so this does not compare like with like. Dividing by 50 instead of 250 gives 5 : 40, which still shares a common factor of 5, so it is not fully simplified. Swapping the order gives 8 : 1, grams to kilograms the wrong way round.
- (a) 0.6 litres — The ratio 1 : 9 means the solution has 1 + 9 = 10 equal parts in total. Each part is 6 ÷ 10 = 0.6 litres, and disinfectant is 1 part, so Priti needs 0.6 litres of disinfectant. Giving 0.667 litres divides by 9, the number of parts of water, instead of the total number of parts, 10 (6 ÷ 9 ≈ 0.667). Giving 6 litres is the total amount of solution, not just the disinfectant's share of it. Giving 5.4 litres works out the water's share (6 × 9 ÷ 10 = 5.4), not the disinfectant's.
- (d) 12 — First find the y-values at the two ends of the chord. At x = 2, y = 2 × 2² + 5 = 2 × 4 + 5 = 8 + 5 = 13. At x = 4, y = 2 × 4² + 5 = 2 × 16 + 5 = 32 + 5 = 37. The gradient of the chord is the change in y divided by the change in x: 37 − 13 = 24, then 24 ÷ (4 − 2) = 24 ÷ 2 = 12. Stopping after finding the change in y and not dividing by the change in x gives 24, which is not a gradient at all. Inverting the fraction, change in x divided by change in y, gives 2 ÷ 24 ≈ 0.08. Averaging the two y-values instead of finding the change between them gives (13 + 37) ÷ 2 = 50 ÷ 2 = 25. A gradient is always change in y over change in x — never the other way round, and never a single y-value.
- (a) 1/9 — The ratio copper : tin is 9:1, so write tin over copper: 1/9. (9/1 comes from writing the ratio the wrong way round, copper over tin. 1/10 comes from comparing the tin to the total mass of the alloy, 1 part out of 10. 9/10 comes from comparing the copper to the total mass of the alloy, 9 parts out of 10.)
- (d) 75 pages — Method: find the number of pages printed in one minute, then scale up to 10 minutes. Working: 45 ÷ 6 = 7.5 pages per minute, so 7.5 × 10 = 75 pages. Answer: 75 pages. 27 pages comes from using the ratio upside down, 45 × 6 ÷ 10, instead of finding the rate per minute first. 55 pages comes from simply adding the extra minutes, 10, onto the original number of pages, 45. 70 pages comes from rounding the rate down to 7 pages per minute before multiplying by 10, instead of using the exact rate of 7.5.
- (c) £32 — First find the gradient: (26 − 14) ÷ (50 − 20) = 12 ÷ 30 = £0.40 per minute. Using the point (20, 14), the charge for 65 minutes is 14 + 0.40 × (65 − 20) = 14 + 18 = £32. Choosing £26 comes from treating the charge as directly proportional to the time, multiplying the gradient by 65 minutes and ignoring the fixed part of the charge (0.40 × 65 = 26). Choosing £40 comes from treating £14 as if it were the charge at 0 minutes, then adding the gradient multiplied by the full 65 minutes (14 + 0.40 × 65 = 40), instead of multiplying by the extra time past 20 minutes. Choosing £33.80 comes from assuming the charge is directly proportional to the minutes already known, scaling up from the point (50, 26) in the ratio 65:50 (65 ÷ 50 × 26 = 33.80).
- (d) 120 g — Mass = density × volume, so 0.8 × 150 = 120 g. Working out 150 ÷ 0.8 = 187.5 divides by the density instead of multiplying, the wrong way round for finding a mass. Working out 150 × 8 = 1200 misplaces the decimal point in the density, treating 0.8 g/cm³ as 8 g/cm³. Working out 150 − 0.8 = 149.2 simply subtracts the density from the volume, which does not give a mass. The piece of wood has a mass of 120 g.
- (d) 7/4 — A part-to-part ratio a : b gives the fraction a/b when the first quantity is written as a fraction of the second, so 7 : 4 gives 7/4. Writing 4/7 puts the parts the wrong way round — blue as a fraction of red, not red as a fraction of blue. Writing 7/11 uses the total number of counters, 7 + 4 = 11, as the denominator instead of the number of blue counters — that is red as a fraction of the whole bag, not red as a fraction of blue. Writing 11/7 has both the wrong denominator and the parts inverted.
- (b) 3:2 — Write both fractions over a common denominator of 4: 3/4 stays as 3/4, and 1/2 = 2/4. Comparing the numerators gives the ratio 3 : 2. Getting 2 : 3 swaps the two parts round. Getting 3 : 1 comes from using the numerator of the first fraction and the original numerator of the second fraction (1) without converting to a common denominator. Getting 2 : 1 comes from using only the denominators, 4 and 2, and simplifying those instead of the numerators.
- (b) 4 — Method: find the length scale factor by taking the cube root of the volume scale factor, then square it to get the area scale factor. Working: 8 = 2³, so the length scale factor is 2, and the area scale factor is 2² = 4. Answer: 4. 8 comes from using the volume scale factor itself as if it were the area scale factor. 64 comes from squaring the volume scale factor, 8² = 64, instead of first taking its cube root. 2 comes from correctly finding the length scale factor but then forgetting to square it.
- (c) 135 g — Find the ratio of butter to sugar in the first batch: 240:160, which simplifies to 3:2. For the second batch, sugar = 90 g, so butter = 90 × 3/2 = 135 g. (60 g comes from using the ratio the wrong way round, 90 × 2/3. 170 g comes from subtracting the drop in sugar, 160 − 90 = 70 g, from the original butter amount, 240 − 70, instead of scaling. 240 g comes from not scaling the butter amount at all.)
- (c) Average rate, t = 2 to 6, is −2°C/min — First find the temperature at each end of the interval. At t = 2, T = 80 − 6 × 2 + 0.5 × 2² = 80 − 12 + 2 = 70. At t = 6, T = 80 − 6 × 6 + 0.5 × 6² = 80 − 36 + 18 = 62. The average rate of change over the interval is the change in T divided by the change in t: 62 − 70 = −8, then −8 ÷ 4 = −2°C per minute, so the statement about the average rate is correct. The instantaneous rate at t = 6 is not −2: completing the square gives T = 0.5(t − 6)² + 62, so t = 6 is the turning point of the curve, where the tangent is horizontal and the rate is 0°C per minute — the reaction has stopped cooling by then. The instantaneous rate at t = 2 is not −2 either: a short chord centred on t = 2, from t = 1.9 (T = 70.405) to t = 2.1 (T = 69.605), gives −0.8 ÷ 0.2 = −4°C per minute, so the reaction is cooling twice as fast at the start of the interval as the average over it. Saying the temperature falls 2°C in total confuses the RATE, −2°C per minute, with a TOTAL drop, which is 70 − 62 = 8°C over the four minutes. Always check whether a figure is a rate, per minute, or a total change.
- (a) It's an average over 20 days, which may miss the day-5 rate. — Method: a chord's gradient is the AVERAGE rate of change across the whole interval it spans; it only closely approximates the INSTANTANEOUS rate of change at a point inside that interval when the rate of change is roughly constant across the interval, which usually means the interval needs to be short. Working: here the chord spans 20 days while the point of interest, t = 5, is only a quarter of the way along it, so if the reservoir's level rose or fell at different rates over that time, the chord's gradient will not be close to the true gradient of the curve at t = 5 — this is the correct reason. Claiming the chord's gradient needs the water level at every day in between is wrong: a chord's gradient needs only the two endpoint values, at t = 0 and t = 20. Claiming a chord can only estimate the rate at its own endpoints is wrong: a chord between two points can be used to estimate the instantaneous rate of change at any point inside the interval, including one that is not an endpoint — that is exactly the technique being used here, and it is the SIZE of the interval that makes the estimate poor, not the fact that t = 5 is an interior point. Claiming the units do not match is wrong: the chord's gradient and the instantaneous rate of change are both measured in metres per day, so the units are the same. A chord is only a good estimate of an instantaneous rate when the interval it spans is short enough that the rate does not change much within it — always check how long the interval is compared with how far it is to the point you actually want.
Build your own mix at the worksheet builder.