Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) 3 hours — Method: inverse proportion means speed × time is constant for the journey, so find that constant and divide it by the new speed. Working: 60 × 2 = 120, which is the distance in kilometres; at 40 km/h the time is 120 ÷ 40 = 3 hours. Answer: 3 hours. The distractors: 1.5 hours is the ratio of the speeds, 60 ÷ 40, given as a time instead of being used to scale the original 2 hours; 1 hour 20 minutes comes from treating time as directly proportional to speed, 2 × 40 ÷ 60, which has the slower train arriving sooner; 2 hours comes from finding the constant 120 and then dividing it by the original 60 km/h again, so the time never changes.
- (a) 45% — Method: percentage increase = increase ÷ original amount × 100. Working: the increase is £116 − £80 = £36, and 36 ÷ 80 = 0.45, so 0.45 × 100 = 45%. Answer: 45%. The distractors: 36% comes from quoting the £36 increase as though pounds and per cent were the same thing; 31% comes from dividing the £36 increase by the new price £116 instead of by the original £80, which gives 31% to the nearest per cent; 145% is the new price written as a percentage of the original price, which is the whole of the new price rather than the increase.
- (c) 30 km — First convert 1 hour 15 minutes to hours: 15 minutes is a quarter of an hour, so the time is 1.25 hours. Then multiply by the speed: 24 × 1.25 = 30 km. Reading 15 minutes as 0.15 hours (writing the minutes after the decimal point instead of as a fraction of 60) gives 24 × 1.15 = 27.6 km. Working out 24 × 75 = 1800 multiplies by the number of minutes instead of converting to hours first. Working out 24 ÷ 1.25 = 19.2 divides by the time instead of multiplying. The cyclist travels 30 km.
- (d) 1.00 litres — Squash is 2/9 of the mixture, so the squash volume is 4.5 × 2/9 = 1.00 litres. Using the water's fraction, 7/9, instead of squash's gives 4.5 × 7/9 = 3.50 litres — the volume of water, not squash. Dividing 4.5 by 9 but forgetting to multiply by the numerator 2 gives 4.5 ÷ 9 = 0.50 litres, which is only 1/9 of the mixture. Halving the total volume instead of applying the fraction 2/9 gives 4.5 ÷ 2 = 2.25 litres, which assumes the mixture is half squash.
- (a) 4:3 — Multiply both parts by the lowest common denominator, 6: (2/3) × 6 = 4 and (1/2) × 6 = 3, giving the ratio 4 : 3, which is already in simplest form.
- (b) 2/5 — Method: a fraction taken 'of the total' has the whole batch as its denominator, so add the two masses first and then write the butter over that total. Working: the total mass is 450 g + 300 g = 750 g, so the fraction is 300/750; the highest common factor of 300 and 750 is 150, and 300 ÷ 150 = 2 while 750 ÷ 150 = 5. Answer: 2/5 of the batch. The distractors: 2/3 comes from comparing the butter with the flour, 300/450, a part-to-part fraction when the question asks for a part compared with the whole; 3/5 comes from writing the flour over the total, 450/750, which answers about the wrong ingredient; 3/2 comes from writing the flour over the butter, 450/300, which both uses the wrong denominator and reverses the order.
- (c) 2/7 — Method: each number in a ratio counts parts, so the whole is all the parts added together, and the fraction wanted is the cement parts over that total. Working: the mix has 5 + 2 = 7 parts altogether, and 2 of those parts are cement, so the cement is 2/7 of the mix. Answer: 2/7. The distractors: 2/5 comes from writing the cement parts over the sand parts, comparing one part with the other part instead of with the whole; 5/7 comes from writing the sand parts over the total, which answers about the wrong material; 7/2 comes from writing the total over the cement parts, turning the fraction upside down.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (d) 5/4 — Work out the number of free seats: 54 − 24 = 30. Form the fraction 30/24; both numbers share a factor of 6, so 30 ÷ 6 = 5 and 24 ÷ 6 = 4, giving 5/4. 4/5 comes from writing the fraction the wrong way round, as reserved over free (24/30). 5/9 comes from comparing the free seats with the total number of seats (30/54), instead of with the reserved seats. 5/6 comes from miscalculating 54 − 24 as 20 instead of 30, then forming 20/24.
- (c) 5/7 — First find the number of children: 84 − 35 = 49. The question compares the adults with the children, not with everyone on the bus, so the denominator is 49 and the numerator is 35, giving 35/49. Both parts divide by 7: 35 ÷ 7 = 5 and 49 ÷ 7 = 7. In its simplest form the fraction is 5/7.
- (d) £3.60 per component — The gradient of a cost-against-components graph has units of pounds per component, since cost is measured in pounds and the horizontal axis counts components. So 3.60 means it costs an extra £3.60 to produce one more component at that point. Calling it '£3.60 total cost' confuses the gradient, a rate, with the y-value on the graph, which is the total cost itself. Giving it as 3.60 components per pound swaps which axis is on top, giving the units of the reciprocal gradient, not the gradient itself. Turning 3.60 into a percentage invents a unit that has no basis in the graph's axes — a gradient here is a number of pounds, not a percentage. Always build the gradient's units from the two axes' own units, in the order y-axis over x-axis.
- (b) 10000 cm² — Method: an area conversion factor is the square of the length conversion factor, because both sides of the square are scaled. Working: a square metre is a square of side 100 cm, so its area is 100 × 100 = 10000 cm². Answer: 10000 cm². The distractors: 100 cm² comes from using the length factor without squaring it; 200 cm² comes from doubling the length factor instead of squaring it; 1000000 cm² comes from cubing the factor, which is the conversion for a volume, not an area.
- (a) The gradient is 3; the candidate's method is right. — The gradient of a tangent, like any straight line, is the change in y divided by the change in x between two points on it. Here the tangent passes through (1, 2) and (5, 14), so the change in y is 14 − 2 = 12 and the change in x is 5 − 1 = 4. The gradient is 12 ÷ 4 = 3, so the candidate's calculation is correct. Subtracting in the wrong order, (2 − 14) ÷ (5 − 1), gives −12 ÷ 4 = −3, the wrong sign. Adding the two changes instead of dividing them, 12 + 4 = 16, does not find a gradient at all. Dividing the change in x by the change in y instead of the other way round, 4 ÷ 12 = 1/3, inverts the calculation completely. Before accepting or rejecting a claimed gradient, always redo the calculation yourself in the same order — change in y over change in x — rather than trusting the arithmetic as given.
- (a) 22p — First convert the hourly rate to pence: £13.20 = 1320p. Then convert from per hour to per minute by dividing by 60, since there are 60 minutes in an hour: 1320 ÷ 60 = 22p per minute. Working out 1320 × 60 = 79200p multiplies by 60 instead of dividing, going the wrong way between per hour and per minute. Working out 13.20 × 10 = 132p converts pounds to pence using the wrong power of ten, and dividing that by 60 carries the error through to give 2.2p. Working out 13.20 × 100 = 1320p converts the currency correctly but stops there, leaving the rate as pence per hour rather than completing the second conversion to pence per minute. The rate of pay is 22p per minute.
- (d) 3 : 8 — Multiply both parts by 4 to clear the decimal: 0.75 × 4 = 3 and 2 × 4 = 8, giving 3 : 8, which has no common factor other than 1. Giving 75 : 200 multiplies by 100 instead of 4, and has not then been simplified down to 3 : 8. Giving 0.75 : 2 has not been converted into whole numbers at all. Giving 3 : 2 converts the first part correctly but leaves the second part unscaled.
Build your own mix at the worksheet builder.