Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) Falling at 3.2°C per minute — The gradient of a tangent gives the instantaneous rate of change, in °C per minute here, not a temperature and not a total change. The negative sign means the temperature is falling, not rising, so the tea is cooling at a rate of 3.2°C per minute at the instant t = 4. Reading the sign the wrong way round gives 'rising at 3.2°C per minute', which would mean the tea is heating up. Treating −3.2 as a total drop since the tea was poured confuses a rate with an accumulated change, which would need the temperatures at two different times, not the gradient at one instant. Treating −3.2 as the temperature reading itself confuses the gradient, a rate of change, with the y-value on the graph. Always check whether a number is a rate, a total, or a single reading before you use it.
- (b) 1:200000 — '1 cm represents 2 km' means 1 cm on the map is 2 km in real life. Convert 2 km into centimetres, the same unit as the 1: 2 km = 2000 m = 200 000 cm. So the scale is 1 : 200 000. Converting only as far as metres gives 1 : 2000 — the conversion to centimetres was never finished. Losing a zero in the conversion gives 1 : 20 000, ten times too small. Writing 1 : 2 without converting units at all compares 1 cm to 2 km directly, which is not a valid ratio since the units do not match.
- (b) t = 5 and t = 7 (closest, evenly spaced) — To estimate the instantaneous rate of change at t = 6, use the chord centred on t = 6 with the closest readings on either side, t = 5 and t = 7. The gradient of this chord is 15.4 − 17.5 = −2.1, then −2.1 ÷ 2 = −1.05 cm per minute. The interval t = 3 to t = 9 is also centred on t = 6 but is wider: 13.4 − 18.7 = −5.3, then −5.3 ÷ 6 ≈ −0.88 cm per minute — this brings in more of the curve's own change in steepness, so it is a worse estimate of the rate at the single instant t = 6. Using t = 6 and t = 7 only gives 15.4 − 16.6 = −1.2, then −1.2 ÷ 1 = −1.2 cm per minute, but this is not centred on t = 6 — it estimates the rate over (6, 7), not at t = 6 itself. Using t = 0 and t = 6 gives 16.6 − 20.0 = −3.4, then −3.4 ÷ 6 ≈ −0.57 cm per minute, the average rate for the whole first six minutes, not the rate at the instant t = 6. Always choose the chord that brackets the point as closely as possible.
- (a) y is always 4 times x. — Check the multiplier for each pair: 12 ÷ 3 = 4, 20 ÷ 5 = 4, 32 ÷ 8 = 4 — the same multiplier every time, so y is always 4 times x. 'x is always 4 times y' comes from writing the multiplier the wrong way round. 'y is always x plus 9' only works for the first pair (3 + 9 = 12); it gives 14 for x = 5 and 17 for x = 8, not 20 and 32. 'y is always double x, plus 6' also only works for the first pair (3 × 2 + 6 = 12); it gives 16 for x = 5, not 20.
- (b) 5:8 — The mix has 5 parts sand and 3 parts cement, so 5 + 3 = 8 parts in total. Sand to total is 5 : 8, and since the highest common factor of 5 and 8 is 1, this is already in its simplest form. Giving 5 : 3 answers sand to cement, not sand to the total mix. Giving 3 : 8 is cement to total, the wrong part of the mix. Giving 8 : 5 has the total and the sand swapped round.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (c) £2743.60 — Each year the balance is multiplied by 1.03. After the first year: 4000 × 1.03 = 4120. After the second year: 4120 × 1.03 = 4243.60, so that is what Leah takes out. She then spends £1500 of it, which leaves 4243.60 − 1500 = 2743.60. She has £2743.60 left.
- (c) 3 : 2 — Method: 'A is k times B' means that if B is taken as 1 part then A is k parts, and a ratio in its simplest form is written with whole numbers that have no common factor. Working: taking B as 1, A is 1.5, so A : B = 1.5 : 1; multiplying both parts by 2 clears the decimal and gives 3 : 2, and 3 and 2 share no factor. Answer: 3 : 2. The distractors: 2 : 3 comes from writing B before A, reversing the order the question asks for; 1.5 : 1 is the right relationship but is not in its simplest form, because a ratio in its simplest form uses whole numbers; 3 : 5 comes from comparing A with the combined length rather than with B, since A : (A + B) = 1.5 : 2.5 = 3 : 5.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (c) 4/5 — Find 20% of £45: 10% is £4.50, so 20% is £9. The sale price is £45 − £9 = £36. Form the fraction 36/45; both numbers share a factor of 9, so 36 ÷ 9 = 4 and 45 ÷ 9 = 5, giving 4/5. 1/5 comes from writing the discount itself as a fraction of the normal price (9/45), instead of the sale price. 6/5 comes from adding the 20% instead of subtracting it, giving a sale price of £54, then 54/45 = 6/5. 5/9 comes from treating 'reduced by 20%' as 'reduced by £20', giving a sale price of £25, then 25/45 = 5/9.
- (a) It's an average over 20 days, which may miss the day-5 rate. — Method: a chord's gradient is the AVERAGE rate of change across the whole interval it spans; it only closely approximates the INSTANTANEOUS rate of change at a point inside that interval when the rate of change is roughly constant across the interval, which usually means the interval needs to be short. Working: here the chord spans 20 days while the point of interest, t = 5, is only a quarter of the way along it, so if the reservoir's level rose or fell at different rates over that time, the chord's gradient will not be close to the true gradient of the curve at t = 5 — this is the correct reason. Claiming the chord's gradient needs the water level at every day in between is wrong: a chord's gradient needs only the two endpoint values, at t = 0 and t = 20. Claiming a chord can only estimate the rate at its own endpoints is wrong: a chord between two points can be used to estimate the instantaneous rate of change at any point inside the interval, including one that is not an endpoint — that is exactly the technique being used here, and it is the SIZE of the interval that makes the estimate poor, not the fact that t = 5 is an interior point. Claiming the units do not match is wrong: the chord's gradient and the instantaneous rate of change are both measured in metres per day, so the units are the same. A chord is only a good estimate of an instantaneous rate when the interval it spans is short enough that the rate does not change much within it — always check how long the interval is compared with how far it is to the point you actually want.
- (a) 160 g — Method: use the ratio 20:100 to find the mass of the whole solution from the mass of acid, then take the acid away to leave the water. Working: 20:100 = 40:m, and 40 ÷ 20 = 2, so m = 2 × 100 = 200 g of solution; the water is 200 − 40 = 160 g. Answer: 160 g. The distractors: 200 g is the mass of the whole solution, which is the middle step and includes the acid the question asks you to leave out; 8 g comes from working out 20% of 40 g, which treats the 40 g as the whole solution rather than as the 20% inside it; 10 g comes from reading the 40 g as the 80% that is water, giving a solution of 50 g and a difference of 50 − 40.
- (c) 9% — Method: a percentage concentration is the ratio of salt to solution written per 100 g, so scale each concentration to the mass it belongs to, add the two masses of salt, then scale the ratio of salt to mixture back to a denominator of 100. Working: 5:100 = x:400 gives 5 ÷ 100 × 400 = 20 g of salt, and 25:100 = y:100 gives 25 g of salt; the mixture holds 20 + 25 = 45 g of salt in 400 + 100 = 500 g of solution; 45:500 = 9:100. Answer: 9%. The distractors: 15% is the mean of 5% and 25%, which would only be right if the two masses were equal, and here one is four times the other; 21% comes from attaching the concentrations to the wrong masses, working out (400 × 25% + 100 × 5%) ÷ 500; 0.9% comes from working out 45 ÷ 500 = 0.09 and then moving the decimal point one place instead of two when writing the decimal as a percentage.
- (d) 5:3:2 — German = 100% − 50% − 30% = 20%. The ratio 50 : 30 : 20 simplifies by dividing every part by 10 to give 5 : 3 : 2.
- (d) 2:3:5 — The highest common factor of 12, 18 and 30 is 6. Divide every part by 6: 12 ÷ 6 = 2, 18 ÷ 6 = 3, 30 ÷ 6 = 5, giving 2 : 3 : 5. Dividing by 2 instead of 6 gives 6 : 9 : 15, which still shares a common factor of 3, so it is not fully simplified. Dividing by 3 instead of 6 gives 4 : 6 : 10, which still shares a common factor of 2, so it is not fully simplified either. Swapping the first two parts gives 3 : 2 : 5, the parts in the wrong order.
Build your own mix at the worksheet builder.