- (c) 3 : 2 — Method: 'A is k times B' means that if B is taken as 1 part then A is k parts, and a ratio in its simplest form is written with whole numbers that have no common factor. Working: taking B as 1, A is 1.5, so A : B = 1.5 : 1; multiplying both parts by 2 clears the decimal and gives 3 : 2, and 3 and 2 share no factor. Answer: 3 : 2. The distractors: 2 : 3 comes from writing B before A, reversing the order the question asks for; 1.5 : 1 is the right relationship but is not in its simplest form, because a ratio in its simplest form uses whole numbers; 3 : 5 comes from comparing A with the combined length rather than with B, since A : (A + B) = 1.5 : 2.5 = 3 : 5.
- (c) m = 6c — Method: the whole is the sum of the parts in the ratio, and the cement is 1 part, so one part weighs c kg. Working: the mix has 5 + 1 = 6 parts, each of mass c kg, so the total mass is 6 × c, giving m = 6c. Answer: m = 6c. The distractors: m = 5c uses the 5 gravel parts as the multiplier and forgets that the cement is in the mix too, so it gives the mass of the gravel and not the total; m = c + 5 comes from reading the ratio as '5 more than' and adding, which treats a number of parts as a mass in kilograms; m = c/6 turns the relationship upside down, as though the total were shared into the cement rather than the cement multiplied up to the total.
- (d) 7/3 — The ratio cranberry : apple is 3:7, so apple juice is 7 parts and cranberry juice is 3 parts. Write apple over cranberry: 7/3. (3/7 comes from writing the ratio the wrong way round, cranberry over apple. 7/10 comes from comparing the apple juice to the total amount of the mixture, 7 parts out of 10. 3/10 comes from comparing the cranberry juice to the total amount of the mixture, 3 parts out of 10.)
- (b) 4 — Method: find the length scale factor by taking the cube root of the volume scale factor, then square it to get the area scale factor. Working: 8 = 2³, so the length scale factor is 2, and the area scale factor is 2² = 4. Answer: 4. 8 comes from using the volume scale factor itself as if it were the area scale factor. 64 comes from squaring the volume scale factor, 8² = 64, instead of first taking its cube root. 2 comes from correctly finding the length scale factor but then forgetting to square it.
- (c) 500 g — Method: a concentration of 10% is the ratio 10:100, and the salt and the solution in the beaker must be in that same ratio, so write 10:100 = 50:m and scale. Working: 50 ÷ 10 = 5, so the salt is 5 times the 10 of the ratio; the solution must be 5 times the 100 of the ratio, giving 5 × 100 = 500 g. Answer: 500 g. The distractors: 5 g comes from working out 10% of 50 g, which treats the 50 g as the whole solution when it is the salt inside it; 450 g comes from scaling correctly and then taking the 50 g of salt away, which gives the mass of water rather than the mass of the whole solution; 5000 g comes from dividing by 0.01 instead of 0.1, that is from writing 10% as 0.01.
- (b) 1:200000 — '1 cm represents 2 km' means 1 cm on the map is 2 km in real life. Convert 2 km into centimetres, the same unit as the 1: 2 km = 2000 m = 200 000 cm. So the scale is 1 : 200 000. Converting only as far as metres gives 1 : 2000 — the conversion to centimetres was never finished. Losing a zero in the conversion gives 1 : 20 000, ten times too small. Writing 1 : 2 without converting units at all compares 1 cm to 2 km directly, which is not a valid ratio since the units do not match.
- (b) 2.5 hours — Method: when two objects move in opposite directions the gap between them grows at the sum of their speeds, so divide the required gap by that combined rate. Working: 80 + 60 = 140 km of gap each hour, and 350 ÷ 140 = 2.5. Answer: 2.5 hours. The distractors: 17.5 hours comes from subtracting the speeds, 80 − 60 = 20, which is the rate for two cars travelling in the same direction; 5 hours comes from using the mean of the two speeds, 70 km/h, instead of their sum; 4.375 hours comes from dividing 350 by 80 and ignoring the second car altogether.
- (c) 40 cm — First find the real pitch length using Plan A's scale: 8 × 1000 = 8000 cm. Now find its length on Plan B using Plan B's scale: 8000 ÷ 200 = 40 cm. Assuming both plans use the same scale and leaving the length as 8 cm ignores that Plan B has a different scale. Using the ratio of the two scales upside down, 200 ÷ 1000 = 0.2, then 8 × 0.2 = 1.6, gives 1.6 cm — Plan B is drawn to a larger scale than Plan A, so lengths on it should be bigger, not smaller. Dividing by 2000 instead of 200 gives 4 cm, ten times too small.
- (a) 1 : 2 000 000 — Method: a scale is a ratio between two lengths written in the same unit, reduced so that the map distance is 1. Working: 120 km = 120 × 1000 × 100 = 12 000 000 cm, so the ratio is 6 : 12 000 000, and dividing both parts by 6 gives 1 : 2 000 000. Answer: 1 : 2 000 000. The distractors: 1 : 12 000 000 comes from writing the real length in centimetres without dividing by the 6 cm on the map; 1 : 200 000 comes from taking 120 km as 1 200 000 cm, one conversion step short, before dividing by 6; 1 : 20 000 comes from converting 120 km to 120 000 m and treating those metres as centimetres.
- (d) d ÷ t — Average speed = distance ÷ time, so the expression is d ÷ t. Writing t ÷ d inverts the formula, giving the time per kilometre instead of the speed. Writing d × t confuses speed with the formula for distance travelled (distance = speed × time) used the wrong way round. Writing d + t treats the relationship as additive instead of using division.
- (d) 20 — Gradient = change in T ÷ change in t = (140 − 60) ÷ (6 − 2) = 80 ÷ 4 = 20. A student who subtracts in the wrong order gets −20. A student who divides 80 by 2 instead of 4 gets 40. A student who wrongly treats the line as passing through the origin and uses the point (2, 60) on its own gets 60 ÷ 2 = 30.
- (b) 1 : 500 — smallest real distance per cm (5 m), most detail — Method: compare what one centimetre represents in real life for each scale — the scale with the smallest real distance per cm shows the most detail. Working: for 1 : 500, 1 cm represents 500 cm (5 m); for 1 : 5000, 1 cm represents 50 m; for 1 : 50 000, 1 cm represents 500 m. Since 5 m is the smallest, 1 : 500 shows the most detail. Wrong options: '1 : 50 000 — covers the largest real area' wrongly assumes covering more area means more detail, when it is the opposite; '1 : 5000 — the middle value' wrongly assumes the middle scale is automatically the most balanced; '1 : 500 — covers the largest real distance' picks the correct scale but states an incorrect fact, since 1 : 500 actually covers the smallest real distance per cm.
- (c) 920 kg/m³ — Convert each unit in turn. Mass: 1 g = 0.001 kg. Volume: 1 m³ = 100 × 100 × 100 = 1 000 000 cm³. So a density of 0.92 g per cm³ is 0.92 × 1 000 000 = 920 000 g in every cubic metre, and 920 000 g = 920 000 × 0.001 = 920 kg. The two conversions leave a single factor of 1 000 000 × 0.001 = 1000, so in one step multiply g/cm³ by 1000: 0.92 × 1000 = 920 kg/m³. Multiplying by 100 instead of 1000 gives 92 kg/m³, using the factor for 1 m² rather than 1 m³ of volume. Multiplying by 10 instead of 1000 gives 9.2 kg/m³, moving the decimal point one place for a conversion that moves it three. Dividing by 1000 instead of multiplying gives 0.00092 kg/m³, going the wrong way between the units — a kilogram is heavier than a gram, but a cubic metre is a million times bigger than a cubic centimetre, so the number must get larger, not smaller. The liquid's density is 920 kg/m³.
- (d) £82.50 — Find the hourly rate: £52.50 ÷ 7 = £7.50 per hour. For 11 hours: 11 × £7.50 = £82.50. £30 comes from working out the pay for only the extra 4 hours (4 × £7.50), and forgetting to include the original £52.50. £99 comes from misremembering the hourly rate as £9 instead of £7.50, then 11 × £9. £56.50 comes from adding the extra number of hours (4) straight onto the pay in pounds (52.5 + 4), confusing hours with pounds.
- (a) 45% — Method: percentage increase = increase ÷ original amount × 100. Working: the increase is £116 − £80 = £36, and 36 ÷ 80 = 0.45, so 0.45 × 100 = 45%. Answer: 45%. The distractors: 36% comes from quoting the £36 increase as though pounds and per cent were the same thing; 31% comes from dividing the £36 increase by the new price £116 instead of by the original £80, which gives 31% to the nearest per cent; 145% is the new price written as a percentage of the original price, which is the whole of the new price rather than the increase.