Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 24 — Method: let one part of the ratio be worth x, write both groups in terms of x, and use the fact that the two groups end up equal. Working: the boys are 3x and the girls are 4x; after the 6 boys join, 3x + 6 = 4x, so x = 6; the girls are 4 parts, so 4 × 6 = 24. Answer: 24 girls. The distractors: 18 is the number of boys before the 6 join, which is 3 × 6; 30 comes from adding the 6 new members to the girls as well as to the boys; 42 is the total number of members in the choir before the 6 boys join, the 18 boys and the girls together.
- (a) 4 hours — This is inverse proportion: more pumps take less time. Multiply the original numbers to find the total pump-hours needed: 2 × 10 = 20 pump-hours. Divide by the new number of pumps: 20 ÷ 5 = 4 hours. Working out 10 × 5 ÷ 2 = 25 hours treats it as direct proportion, as if more pumps needed more time. Stopping at 20 gives the total pump-hours, not the number of hours. Working out 10 − (5 − 2) = 7 hours subtracts the extra number of pumps straight from the number of hours, treating pumps and hours as the same kind of quantity. 5 pumps take 4 hours.
- (a) 1.5 km — Multiply the map length by the scale: 6 × 25 000 = 150 000 cm. Convert to kilometres: 150 000 cm = 1.5 km. Dividing by only 1000 instead of the full conversion when changing units gives 150 km, a hundred times too large. Misreading the scale as 1 : 2500 instead of 1 : 25 000 gives 6 × 2500 = 15 000 cm = 0.15 km, a hundred times too small. Leaving the answer as 150 000 without converting units at all, and calling it 150 000 km, mistakes centimetres for kilometres completely.
- (c) 16% — Method: scale each concentration to its own mass to find the salt it contains, add the two masses of salt, then write the ratio of salt to mixture per 100 g. Working: 10:100 = x:300 gives 30 g of salt, and 25:100 = y:200 gives 50 g of salt; the mixture holds 30 + 50 = 80 g of salt in 300 + 200 = 500 g of solution; 80:500 = 16:100. Answer: 16%. The distractors: 17.5% is the mean of 10% and 25%, which ignores that there is more of the weaker solution than of the stronger one; 19% comes from swapping the two concentrations over, working out (300 × 25% + 200 × 10%) ÷ 500; 26.7% comes from dividing the 80 g of salt by the 300 g of the first solution rather than by the 500 g of mixture.
- (d) 1.5 — Method: the length scale factor is the square root of the area scale factor, not the area scale factor itself. Working: the area scale factor is 45 ÷ 20 = 2.25, and the square root of 2.25 is 1.5. Answer: 1.5. Nadia's answer, 2.25, is the AREA scale factor — she never took the square root to get back to the length scale factor. 4.5 comes from doubling the area scale factor instead of taking its square root. 0.67 comes from taking the square root in the wrong direction, finding the scale factor from the larger rug to the smaller rug instead of the other way round.
- (a) 20 cm — Method: match the measurement you are given to its own part of the ratio, use it to find the value of one part, then multiply by the parts belonging to the measurement asked for. Working: the length is the second measurement listed, so it matches 4 parts and one part = 16 ÷ 4 = 4 cm; the height is 5 parts, so 5 × 4 = 20. Answer: 20 cm. The distractors: 12 cm is the width, which is the 3-part measurement; 4 cm is the value of one part only; 80 cm comes from multiplying the 16 cm by 5 without first dividing by the 4 parts the length is worth.
- (b) 2.5 hours — Method: when two objects move in opposite directions the gap between them grows at the sum of their speeds, so divide the required gap by that combined rate. Working: 80 + 60 = 140 km of gap each hour, and 350 ÷ 140 = 2.5. Answer: 2.5 hours. The distractors: 17.5 hours comes from subtracting the speeds, 80 − 60 = 20, which is the rate for two cars travelling in the same direction; 5 hours comes from using the mean of the two speeds, 70 km/h, instead of their sum; 4.375 hours comes from dividing 350 by 80 and ignoring the second car altogether.
- (b) £60 — £48 represents 100% − 20% = 80% of the original price. 1% = £48 ÷ 80 = £0.60, so 100% = £0.60 × 100 = £60.
- (b) The ratio C : m is not constant because the formula includes a fixed charge of £3 as well as the charge per mile. — For the ratio C : m to stay constant, C must be directly proportional to m, i.e. C = km with no constant term. Because of the +3 fixed charge, C is not directly proportional to m: for example m = 1 gives C = 5.5 (ratio 5.5 : 1), while m = 10 gives C = 28 (ratio 2.8 : 1) — the ratio has changed.
- (d) £117.60 — Add the hours worked over the two days: 6 + 4.5 = 10.5 hours. Multiply by the rate of pay: 10.5 × £11.20 = £117.60. (£67.20 is Monday's pay only. £50.40 is Tuesday's pay only. £106.40 comes from mistakenly adding the hours as 6 + 3.5 = 9.5 — misreading Tuesday's 4.5 hours as 3.5 — and then multiplying by £11.20.)
- (c) 2/7 — Method: each number in a ratio counts parts, so the whole is all the parts added together, and the fraction wanted is the cement parts over that total. Working: the mix has 5 + 2 = 7 parts altogether, and 2 of those parts are cement, so the cement is 2/7 of the mix. Answer: 2/7. The distractors: 2/5 comes from writing the cement parts over the sand parts, comparing one part with the other part instead of with the whole; 5/7 comes from writing the sand parts over the total, which answers about the wrong material; 7/2 comes from writing the total over the cement parts, turning the fraction upside down.
- (b) Car A, 50 km/h — Method: speed = distance ÷ time for each car, then compare. Working: Car A = 150 ÷ 3 = 50 km/h. Car B = 180 ÷ 4 = 45 km/h. Since 50 > 45, Car A is faster, travelling at 50 km/h. Wrong options: Car B, 45 km/h correctly finds Car B's speed but wrongly names the slower car as faster; Car A, 45 km/h picks the correct car but uses Car B's speed by mistake; Car B, 50 km/h picks the wrong car but uses Car A's correct speed value.
- (c) 3 : 2 — Method: 'A is k times B' means that if B is taken as 1 part then A is k parts, and a ratio in its simplest form is written with whole numbers that have no common factor. Working: taking B as 1, A is 1.5, so A : B = 1.5 : 1; multiplying both parts by 2 clears the decimal and gives 3 : 2, and 3 and 2 share no factor. Answer: 3 : 2. The distractors: 2 : 3 comes from writing B before A, reversing the order the question asks for; 1.5 : 1 is the right relationship but is not in its simplest form, because a ratio in its simplest form uses whole numbers; 3 : 5 comes from comparing A with the combined length rather than with B, since A : (A + B) = 1.5 : 2.5 = 3 : 5.
- (b) −3 — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, with both changes taken in the same direction along the line. Working: going from (1, 20) to (5, 8) the change in y is 8 − 20 = −12 and the change in x is 5 − 1 = 4, so the gradient is −12 ÷ 4 = −3. Answer: −3, and the negative sign is expected because the line falls from left to right. The distractors: 3 comes from subtracting the smaller y from the larger, 20 − 8 = 12, while still taking the x values from left to right, which loses the minus sign that says the line falls; −12 is the change in y left undivided by the change in x of 4; −1/3 comes from dividing the change in x by the change in y, 4 ÷ (−12), turning the gradient upside down.
- (b) 1.5 km — Multiply the map length by the scale factor: 6 × 25000 = 150000 cm. Convert to kilometres, using 100 cm = 1 m and 1000 m = 1 km, so 100000 cm = 1 km: 150000 ÷ 100000 = 1.5 km. (1500 km comes from converting only as far as metres, 150000 ÷ 100 = 1500 m, and then writing kilometres on the end. 15 km comes from dividing by 10000 instead of 100000. 0.15 km comes from dividing by 1000000 instead of 100000.)
Build your own mix at the worksheet builder.