Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) 4/5 — Find 20% of £45: 10% is £4.50, so 20% is £9. The sale price is £45 − £9 = £36. Form the fraction 36/45; both numbers share a factor of 9, so 36 ÷ 9 = 4 and 45 ÷ 9 = 5, giving 4/5. 1/5 comes from writing the discount itself as a fraction of the normal price (9/45), instead of the sale price. 6/5 comes from adding the 20% instead of subtracting it, giving a sale price of £54, then 54/45 = 6/5. 5/9 comes from treating 'reduced by 20%' as 'reduced by £20', giving a sale price of £25, then 25/45 = 5/9.
- (c) They are in direct proportion, because y ÷ x = 2.5 for both pairs. — Testing direct proportion means checking that y ÷ x is the same for every pair: 15 ÷ 6 = 2.5 and 25 ÷ 10 = 2.5, so the quantities are in direct proportion. Saying they are not in proportion because x + y differs uses addition, which is not the correct test for proportion. Saying they are not in proportion because y − x differs also uses the wrong test — subtraction, not division. Saying they are in proportion because x × y is 90 and 250 uses multiplication, which is the test for inverse proportion, and the two products are not even equal to each other, so this option also contradicts itself.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (c) 9:15:21 — 6 : 10 : 14 simplifies to 3 : 5 : 7 (divide every part by 2). Multiplying every part of 3 : 5 : 7 by 3 gives 9 : 15 : 21, so 9 : 15 : 21 is equivalent to 6 : 10 : 14. Adding 2 to every part of 6 : 10 : 14 gives 8 : 12 : 16, which is not equivalent — ratios are equivalent when every part is multiplied by the same number, not when the same number is added to every part. Doubling only the first two parts, 6 × 2 = 12 and 10 × 2 = 20, but leaving the third part unchanged at 14, gives 12 : 20 : 14 — a scaling applied to two parts and not the third. Cancelling the first two parts correctly, 6 ÷ 2 = 3 and 10 ÷ 2 = 5, then treating the three numbers as a sequence and making the third part the sum of the first two, 3 + 5 = 8, gives 3 : 5 : 8 — the third part was never divided by 2 at all.
- (d) 12 — First find the y-values at the two ends of the chord. At x = 2, y = 2 × 2² + 5 = 2 × 4 + 5 = 8 + 5 = 13. At x = 4, y = 2 × 4² + 5 = 2 × 16 + 5 = 32 + 5 = 37. The gradient of the chord is the change in y divided by the change in x: 37 − 13 = 24, then 24 ÷ (4 − 2) = 24 ÷ 2 = 12. Stopping after finding the change in y and not dividing by the change in x gives 24, which is not a gradient at all. Inverting the fraction, change in x divided by change in y, gives 2 ÷ 24 ≈ 0.08. Averaging the two y-values instead of finding the change between them gives (13 + 37) ÷ 2 = 50 ÷ 2 = 25. A gradient is always change in y over change in x — never the other way round, and never a single y-value.
- (d) £82.50 — Find the hourly rate: £52.50 ÷ 7 = £7.50 per hour. For 11 hours: 11 × £7.50 = £82.50. £30 comes from working out the pay for only the extra 4 hours (4 × £7.50), and forgetting to include the original £52.50. £99 comes from misremembering the hourly rate as £9 instead of £7.50, then 11 × £9. £56.50 comes from adding the extra number of hours (4) straight onto the pay in pounds (52.5 + 4), confusing hours with pounds.
- (b) The ratio C : m is not constant because the formula includes a fixed charge of £3 as well as the charge per mile. — For the ratio C : m to stay constant, C must be directly proportional to m, i.e. C = km with no constant term. Because of the +3 fixed charge, C is not directly proportional to m: for example m = 1 gives C = 5.5 (ratio 5.5 : 1), while m = 10 gives C = 28 (ratio 2.8 : 1) — the ratio has changed.
- (a) 8:1 — Multiply both parts of the ratio by 4 to clear the fraction: 2 × 4 = 8 and 1/4 × 4 = 1, giving 8 : 1. Getting 1 : 8 has the two parts the wrong way round. Getting 2 : 4 comes from writing down the denominator of the fraction (4) as the second part instead of multiplying through by it. Getting 8 : 4 comes from multiplying only the first part of the ratio by 4 and leaving the second part as the fraction's denominator.
- (a) 3/8, 41%, 0.43 — Method: convert every value to a decimal so they can be compared on the same scale, then order them. Working: 3/8 = 0.375, 41% = 0.41, and 0.43 stays as 0.43, so from smallest to largest the decimals are 0.375, 0.41, 0.43, giving the order 3/8, 41%, 0.43. Answer: 3/8, 41%, 0.43. The order 3/8, 0.43, 41% comes from comparing 0.43 and 41% as raw digits (43 versus 41) without converting 41% into the decimal 0.41 first, wrongly placing 0.43 before 41%. The order 0.43, 41%, 3/8 comes from placing the values in completely reversed order, from largest to smallest instead of smallest to largest. The order 41%, 0.43, 3/8 comes from ordering the values by their TYPE (percentage, then decimal, then fraction) rather than by their actual size.
- (d) 500 ml — Varnish covers a surface, so the amount needed scales with the area scale factor, which is the square of the length scale factor. The length scale factor is 50 ÷ 20 = 2.5, so the area scale factor is 2.5 × 2.5 = 6.25. The varnish needed for the larger statue is 80 × 6.25 = 500 ml. Using 2.5 on its own would scale a length, not a surface.
- (c) 40 cm — First find the real pitch length using Plan A's scale: 8 × 1000 = 8000 cm. Now find its length on Plan B using Plan B's scale: 8000 ÷ 200 = 40 cm. Assuming both plans use the same scale and leaving the length as 8 cm ignores that Plan B has a different scale. Using the ratio of the two scales upside down, 200 ÷ 1000 = 0.2, then 8 × 0.2 = 1.6, gives 1.6 cm — Plan B is drawn to a larger scale than Plan A, so lengths on it should be bigger, not smaller. Dividing by 2000 instead of 200 gives 4 cm, ten times too small.
- (b) t = 5 and t = 7 (closest, evenly spaced) — To estimate the instantaneous rate of change at t = 6, use the chord centred on t = 6 with the closest readings on either side, t = 5 and t = 7. The gradient of this chord is 15.4 − 17.5 = −2.1, then −2.1 ÷ 2 = −1.05 cm per minute. The interval t = 3 to t = 9 is also centred on t = 6 but is wider: 13.4 − 18.7 = −5.3, then −5.3 ÷ 6 ≈ −0.88 cm per minute — this brings in more of the curve's own change in steepness, so it is a worse estimate of the rate at the single instant t = 6. Using t = 6 and t = 7 only gives 15.4 − 16.6 = −1.2, then −1.2 ÷ 1 = −1.2 cm per minute, but this is not centred on t = 6 — it estimates the rate over (6, 7), not at t = 6 itself. Using t = 0 and t = 6 gives 16.6 − 20.0 = −3.4, then −3.4 ÷ 6 ≈ −0.57 cm per minute, the average rate for the whole first six minutes, not the rate at the instant t = 6. Always choose the chord that brackets the point as closely as possible.
- (c) 500 g — Method: a concentration of 10% is the ratio 10:100, and the salt and the solution in the beaker must be in that same ratio, so write 10:100 = 50:m and scale. Working: 50 ÷ 10 = 5, so the salt is 5 times the 10 of the ratio; the solution must be 5 times the 100 of the ratio, giving 5 × 100 = 500 g. Answer: 500 g. The distractors: 5 g comes from working out 10% of 50 g, which treats the 50 g as the whole solution when it is the salt inside it; 450 g comes from scaling correctly and then taking the 50 g of salt away, which gives the mass of water rather than the mass of the whole solution; 5000 g comes from dividing by 0.01 instead of 0.1, that is from writing 10% as 0.01.
- (a) 1 : 2 000 000 — Method: a scale is a ratio between two lengths written in the same unit, reduced so that the map distance is 1. Working: 120 km = 120 × 1000 × 100 = 12 000 000 cm, so the ratio is 6 : 12 000 000, and dividing both parts by 6 gives 1 : 2 000 000. Answer: 1 : 2 000 000. The distractors: 1 : 12 000 000 comes from writing the real length in centimetres without dividing by the 6 cm on the map; 1 : 200 000 comes from taking 120 km as 1 200 000 cm, one conversion step short, before dividing by 6; 1 : 20 000 comes from converting 120 km to 120 000 m and treating those metres as centimetres.
- (d) Gradient = acceleration; area = distance travelled. — Method: on a speed–time graph, the gradient of the graph at an instant is the rate of change of speed with time, which is acceleration; the area between the graph and the time-axis over an interval is the total distance covered in that interval, because it accumulates speed × time. Working: gradient = acceleration and area = distance travelled is the correct pairing. Swapping the two quantities completely, gradient = distance travelled and area = acceleration, is the reverse of what each actually measures. Keeping gradient = acceleration correct but then also claiming area = acceleration too is wrong because the area is a different physical quantity, distance, not a second way of finding the same rate. Claiming the gradient itself gives the speed confuses the RATE OF CHANGE of the plotted quantity with the plotted quantity itself — the gradient is how fast the speed is changing, not the speed. On any rate graph, the gradient of the graph is always the RATE at that instant, and the area under the graph is always the TOTAL AMOUNT accumulated — keep straight which of the two questions each one answers.
Build your own mix at the worksheet builder.