Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) 135 g — Find the ratio of butter to sugar in the first batch: 240:160, which simplifies to 3:2. For the second batch, sugar = 90 g, so butter = 90 × 3/2 = 135 g. (60 g comes from using the ratio the wrong way round, 90 × 2/3. 170 g comes from subtracting the drop in sugar, 160 − 90 = 70 g, from the original butter amount, 240 − 70, instead of scaling. 240 g comes from not scaling the butter amount at all.)
- (d) 1 : 1 — Sugar and butter together make 3 + 5 = 8 parts of the mixture. Comparing flour to this, 8 : 8, simplifies to 1 : 1. Giving 1 : 2 compares flour with the whole mixture (8 + 3 + 5 = 16 parts, giving 8 : 16 = 1 : 2) instead of with the rest of the mixture. Giving 3 : 5 is the ratio of sugar to butter, not of flour to the rest of the mixture. Giving 8 : 3 compares flour only with sugar, leaving butter out altogether.
- (c) a decrease of 25% — Method: use multipliers. An increase of 50% is × 1.5 and a decrease of 50% is × 0.5. Working: 1.5 × 0.5 = 0.75, so the final price is 75% of the original. Answer: a decrease of 25%. The distractors: no change comes from assuming +50% and −50% cancel; a decrease of 50% comes from applying only the second change; an increase of 25% has the direction wrong.
- (d) 90 cm — Method: scale each dimension by the scale factor, then find the perimeter. Working: model height = 240 ÷ 8 = 30 cm; model width = 120 ÷ 8 = 15 cm. Perimeter = 2 × (30 + 15) = 90 cm. Wrong options: 11.25 cm comes from squaring the scale factor as if finding an area (720 ÷ 64); 510 cm comes from scaling only one dimension and leaving the other at full size; 720 cm comes from finding the real perimeter (2 × (240 + 120)) but forgetting to scale it down at all.
- (c) 150% — Percentage = (180,000 ÷ 120,000) × 100 = 150%.
- (d) 20 — Gradient = change in T ÷ change in t = (140 − 60) ÷ (6 − 2) = 80 ÷ 4 = 20. A student who subtracts in the wrong order gets −20. A student who divides 80 by 2 instead of 4 gets 40. A student who wrongly treats the line as passing through the origin and uses the point (2, 60) on its own gets 60 ÷ 2 = 30.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (d) 3 : 2 : 5 — The highest common factor of 45, 30 and 75 is 15. Divide each part by 15: 45 ÷ 15 = 3, 30 ÷ 15 = 2 and 75 ÷ 15 = 5, giving 3 : 2 : 5. Giving 9 : 6 : 15 divides by 5, a common factor but not the highest one. Giving 15 : 10 : 25 divides by 3 only, even further from simplest form. Giving 2 : 3 : 5 has the first two parts swapped.
- (d) 75 pages — Method: find the number of pages printed in one minute, then scale up to 10 minutes. Working: 45 ÷ 6 = 7.5 pages per minute, so 7.5 × 10 = 75 pages. Answer: 75 pages. 27 pages comes from using the ratio upside down, 45 × 6 ÷ 10, instead of finding the rate per minute first. 55 pages comes from simply adding the extra minutes, 10, onto the original number of pages, 45. 70 pages comes from rounding the rate down to 7 pages per minute before multiplying by 10, instead of using the exact rate of 7.5.
- (b) 2, the cost in pounds of each extra gigabyte — Method: the gradient is the change in cost divided by the change in data, so it is the cost of each extra gigabyte; the value where the line meets the vertical axis is the charge before any data is used, which is a different quantity. Working: from (0, 10) to (8, 26) the cost rises by 26 − 10 = 16 pounds while the data rises by 8 − 0 = 8 gigabytes, so the gradient is 16 ÷ 8 = 2, meaning each extra gigabyte costs £2. Answer: 2, the cost in pounds of each extra gigabyte. The distractors: '10, the cost in pounds of each extra gigabyte' reads the intercept as the gradient, but 10 is what the tariff costs when no data at all has been used; '3.25, the cost in pounds of each extra gigabyte' comes from 26 ÷ 8, treating the line as though it passed through the origin when it starts at 10; '2, the fixed monthly charge in pounds' has the gradient right but describes the intercept, and the fixed charge on this tariff is £10.
- (c) 40 cm — First find the real pitch length using Plan A's scale: 8 × 1000 = 8000 cm. Now find its length on Plan B using Plan B's scale: 8000 ÷ 200 = 40 cm. Assuming both plans use the same scale and leaving the length as 8 cm ignores that Plan B has a different scale. Using the ratio of the two scales upside down, 200 ÷ 1000 = 0.2, then 8 × 0.2 = 1.6, gives 1.6 cm — Plan B is drawn to a larger scale than Plan A, so lengths on it should be bigger, not smaller. Dividing by 2000 instead of 200 gives 4 cm, ten times too small.
- (d) 3 : 8 — Multiply both parts by 4 to clear the decimal: 0.75 × 4 = 3 and 2 × 4 = 8, giving 3 : 8, which has no common factor other than 1. Giving 75 : 200 multiplies by 100 instead of 4, and has not then been simplified down to 3 : 8. Giving 0.75 : 2 has not been converted into whole numbers at all. Giving 3 : 2 converts the first part correctly but leaves the second part unscaled.
- (a) 35/32 — Work out each weekly total first. Last week: 5 × 7 = 35 hours. This week: 4 × 8 = 32 hours. Last week's total is being written as a fraction of this week's total, so last week goes on the top and this week goes on the bottom, giving 35/32. The two totals share no common factor, so the fraction cannot be cancelled. It is greater than 1, which says that Priya worked more hours last week than this week.
- (c) Yes — 700 ÷ 7 = 100 ml for the 1 part of concentrate — Method: add the ratio parts to find the total number of parts, divide the total volume by this, then use the ratio to find concentrate's share. Working: 1 + 6 = 7 parts. 700 ÷ 7 = 100 ml per part. Concentrate = 1 part = 100 ml, so Freya is correct. Wrong options: 'divide 700 by 6' uses only one of the ratio numbers instead of the total of 7 parts, giving about 117 ml; '600 ml is concentrate' swaps which ratio number belongs to the concentrate and which belongs to the water; 'half of 700 ml should be concentrate' ignores the ratio altogether and assumes an equal split.
- (b) 35 N/m² — Pressure = force ÷ area. 84 ÷ 2.4 = 35 N/m². 201.6 N/m² comes from multiplying the force by the area instead of dividing (84 × 2.4). 81.6 N/m² comes from subtracting the area from the force (84 − 2.4) instead of dividing. 0.03 N/m² comes from dividing the area by the force instead of the force by the area (2.4 ÷ 84).
Build your own mix at the worksheet builder.