Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 20 km/h — Method: average speed = total distance ÷ total time, with the time written in hours. Working: 1 hour 30 minutes = 1.5 hours, and 30 ÷ 1.5 = 20. Answer: 20 km/h. The distractors: 45 km/h comes from multiplying 30 by 1.5 instead of dividing; 15 km/h comes from dividing by 2, as if the ride had taken 2 hours; 30 km/h comes from dividing by the whole hour only and ignoring the extra 30 minutes.
- (d) 7/3 — Put the kettle's energy over the toaster's energy: 2.1/0.9. Multiply both numbers by 10 to clear the decimals: 21/9. Divide both by their highest common factor, 3: 21÷3 = 7, 9÷3 = 3, giving 7/3. (3/7 comes from writing the energy values the wrong way round. 4/3 comes from finding the difference, 2.1 − 0.9 = 1.2 kWh, and writing it as a fraction of the toaster's energy, 1.2/0.9. 7/10 comes from comparing the kettle's energy to the total energy used by both appliances, 2.1/3.0.)
- (c) 3 : 2 — Method: 'A is k times B' means that if B is taken as 1 part then A is k parts, and a ratio in its simplest form is written with whole numbers that have no common factor. Working: taking B as 1, A is 1.5, so A : B = 1.5 : 1; multiplying both parts by 2 clears the decimal and gives 3 : 2, and 3 and 2 share no factor. Answer: 3 : 2. The distractors: 2 : 3 comes from writing B before A, reversing the order the question asks for; 1.5 : 1 is the right relationship but is not in its simplest form, because a ratio in its simplest form uses whole numbers; 3 : 5 comes from comparing A with the combined length rather than with B, since A : (A + B) = 1.5 : 2.5 = 3 : 5.
- (d) 48 — Find the rate first: 18 ÷ 3 = 6 bottles per minute. Then apply it to the new time: 6 × 8 = 48 bottles. Working out 18 + (8 − 3) = 23 adds the extra 5 minutes onto the number of bottles instead of scaling proportionally. Working out 18 × 8 = 144 multiplies the given number of bottles by the new number of minutes without finding the rate first. Writing 18 keeps the count the same, not realising it must change with the time. In 8 minutes the machine fills 48 bottles.
- (b) 5 litres — Method: adding water changes the total volume but adds no salt, so work out the volume of salt, then the total volume that makes that salt 20% of the mixture, then the extra water. Working: 30% of 10 litres is 0.3 × 10 = 3 litres of salt. For the same 3 litres to be 20% of the new mixture, the new total volume is 3 ÷ 0.2 = 15 litres. The water added is the extra volume, 15 − 10 = 5 litres. Answer: 5 litres. The distractors: 3 litres is the volume of salt in the solution, which is the first step and not what the question asks for; 15 litres is the total volume of the new mixture, which counts the 10 litres already in the container as water that was poured in; 2 litres comes from taking 20% of the original 10 litres, applying the new percentage to the old volume instead of to the new one.
- (c) £136 — 5% interest each year means the value becomes 100% + 5% = 105% of the previous year's value, and 105% = 1.05, so the multiplier is 1.05. Account A: £3200 × 1.05 × 1.05 = £3528. Account B (simple interest): £3200 + 2 × (£3200 × 0.03) = £3392. The difference is £3528 − £3392 = £136. (£128 comes from working out Account A with simple interest too, instead of compound: £3200 + 2 × (£3200 × 0.05) = £3520, then £3520 − £3392 = £128. £3528 is the value of Account A on its own, not the difference between the two accounts. £3392 is the value of Account B on its own, not the difference.)
- (c) £32 — First find the gradient: (26 − 14) ÷ (50 − 20) = 12 ÷ 30 = £0.40 per minute. Using the point (20, 14), the charge for 65 minutes is 14 + 0.40 × (65 − 20) = 14 + 18 = £32. Choosing £26 comes from treating the charge as directly proportional to the time, multiplying the gradient by 65 minutes and ignoring the fixed part of the charge (0.40 × 65 = 26). Choosing £40 comes from treating £14 as if it were the charge at 0 minutes, then adding the gradient multiplied by the full 65 minutes (14 + 0.40 × 65 = 40), instead of multiplying by the extra time past 20 minutes. Choosing £33.80 comes from assuming the charge is directly proportional to the minutes already known, scaling up from the point (50, 26) in the ratio 65:50 (65 ÷ 50 × 26 = 33.80).
- (a) 2 km — Method: multiply the map distance by the scale to get the real distance in centimetres, then convert centimetres to kilometres using 100 cm = 1 m and 1000 m = 1 km. Working: 4 × 50 000 = 200 000 cm; 200 000 ÷ 100 = 2000 m; 2000 ÷ 1000 = 2. Answer: 2 km. The distractors: 200 km comes from dividing the 200 000 cm by 1000 in a single step, as if a kilometre were 1000 cm rather than the 100 000 cm it is; 20 km comes from converting to metres correctly, 200 000 ÷ 100 = 2000 m, and then dividing those metres by 100 instead of by 1000; 0.2 km comes from dividing by 1000 to reach metres, as if a metre were 1000 cm, and then dividing by 1000 again, so 200 000 is divided by 1 000 000 altogether.
- (c) £624.32 — A 4% rise is a multiplier of 1.04, applied once each year. After year 1: 5000 × 1.04 = 5200. After year 2: 5200 × 1.04 = 5408. After year 3: 5408 × 1.04 = 5624.32. The question asks for the interest, not the value of the account, so take away the amount invested at the start: 5624.32 − 5000 = 624.32. The total interest earned is £624.32.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (a) 12/5 — If A is 5/12 of B, then B is the reciprocal of that fraction times A: flip 5/12 to get 12/5, so B is 12/5 of A. 5/12 comes from keeping the same fraction without flipping it, treating the relationship as if it works the same way in both directions. 7/12 comes from computing 1 − 5/12 = 7/12, which is not how a fraction reverses. 12/7 comes from subtracting 5 from 12 to get 7, and writing 12 over that, instead of swapping the numerator and denominator of 5/12.
- (d) 8 — The product of price and number of tickets is constant: k = 4 × 12 = 48. At £6 per ticket, the number of tickets is 48 ÷ 6 = 8. Getting 18 comes from treating price and tickets as directly proportional and working out 12 × 6 ÷ 4 instead of dividing k by the new price. Getting 12 assumes the number of tickets does not change when the price changes. Getting 6 comes from writing down the new price instead of working out the number of tickets.
- (c) 27 : 64 — For similar solids, the ratio of volumes is the ratio of lengths cubed: 3³ : 4³ = 27 : 64. 3 : 4 comes from using the height ratio itself as the volume ratio, without cubing it at all. 9 : 16 comes from squaring each part instead of cubing (3² : 4²) — squaring is the rule for area, not volume. 27 : 4 comes from cubing only the first part of the ratio (3³ = 27), and leaving the second part uncubed.
- (a) 3/2 — Find each average speed: car = 180 ÷ 3 = 60 mph; lorry = 160 ÷ 4 = 40 mph. Put the car's speed over the lorry's speed: 60/40. Divide both numbers by their highest common factor, 20: 60÷20 = 3, 40÷20 = 2, giving 3/2. (2/3 comes from writing the speeds the wrong way round. 9/8 comes from comparing the distances travelled, 180/160, without working out the speeds. 3/4 comes from comparing the times taken, 3/4, instead of the speeds.)
- (c) Height rising at 2 m/s at t = 1.5 s — A tangent's gradient on a height-time graph is the instantaneous rate of change of height, in metres per second, so gradient 2 means the ball's height is increasing at 2 m/s at t = 1.5 s. Saying the height 'is 2 m' confuses the gradient, a rate, with the y-value on the graph, which is the ball's height itself. Saying the ball 'travelled 2 m from t = 1 to t = 2' treats the instantaneous gradient at one instant as if it were the total distance risen over a whole one-second interval, which is a different quantity found from two height readings, not from one tangent. Saying the speed 'is 2 m/s²' uses the wrong units — m/s² measures acceleration, the rate of change of speed, not speed itself. Always check that the units quoted match what a height-time graph's gradient can actually give you: metres per second.
Build your own mix at the worksheet builder.