Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 3:2 — Write both fractions over a common denominator of 4: 3/4 stays as 3/4, and 1/2 = 2/4. Comparing the numerators gives the ratio 3 : 2. Getting 2 : 3 swaps the two parts round. Getting 3 : 1 comes from using the numerator of the first fraction and the original numerator of the second fraction (1) without converting to a common denominator. Getting 2 : 1 comes from using only the denominators, 4 and 2, and simplifying those instead of the numerators.
- (c) 3 hours — Method: in inverse proportion the product of the two quantities is constant, and here that product is the distance. Working: 60 × 4 = 240 km, so at 80 km/h the time is 240 ÷ 80 = 3. Answer: 3 hours. The distractors: 5 hours 20 minutes comes from treating the relationship as direct, working out 4 × 80 ÷ 60; 2 hours 40 minutes comes from cutting the time by the fraction the speed rose by — the speed went up by one third, so the time was cut by one third — which is not how inverse proportion works; 4 hours comes from dividing the 240 km by the original speed of 60 km/h again instead of by the new speed.
- (d) 19% — Method: write each decrease as a multiplier, multiply the multipliers, then compare the result with 100%. Working: a 10% decrease is a multiplier of 0.9, so the two reductions together give 0.9 × 0.9 = 0.81; the final price is 81% of the original, so the price has fallen by 100% − 81% = 19%. Answer: an overall decrease of 19%. The distractors: 20% comes from adding the two reductions, 10% + 10%, which charges the second 10% against the original price instead of against the already reduced price; 21% comes from using the increase multiplier by mistake, since 1.1 × 1.1 = 1.21, and reading that 21% as a decrease; 81% is the percentage of the original price still being paid, not the percentage taken off.
- (a) 46.8 km/h — Method: 1 hour = 60 minutes, so a rate given in kilometres per minute is converted to kilometres per hour by multiplying by 60. Working: 0.78 × 60 = 46.8, so the instantaneous rate of change is 46.8 kilometres per hour. Keeping the given value unchanged and only relabelling the unit gives 0.78 km/h, which ignores that the time unit has changed. Dividing by 60 instead of multiplying — as you would when converting to a larger length unit — gives 0.78 ÷ 60 = 0.013 km/h, the wrong direction for a rate measured against a larger time unit. Adding 60 to the given rate instead of multiplying by it gives 0.78 + 60 = 60.78 km/h. Converting a rate always means multiplying or dividing by the conversion factor between the units, never adding it, and the direction depends on whether the new time unit is bigger or smaller than the old one.
- (c) 5 hours — Method: measure the job in decorator-hours, which is in the same ratio as the number of rooms, then share the decorator-hours between the decorators available. Working: 5 decorators × 6 hours = 30 decorator-hours for 3 rooms, so one room takes 30 ÷ 3 = 10 decorator-hours; 5 rooms take 5 × 10 = 50 decorator-hours; shared between 10 decorators that is 50 ÷ 10 = 5 hours. Answer: 5 hours. The distractors: 3 hours comes from halving the 6 hours because the number of decorators doubles, while forgetting that there are also more rooms to paint; 10 hours comes from scaling the 6 hours up for the rooms only, 6 × 5 ÷ 3, and leaving the workforce at 5 decorators; 6 hours comes from assuming that doubling the decorators and increasing the rooms cancel each other out, which they do not, because the rooms rise by a factor of 5/3 and the workforce by a factor of 2.
- (b) Day 3 to Day 4 — Method: the average rate of increase between two consecutive days is the difference in the number of orders divided by the number of days between them, which here is just the difference itself, since each gap is one day; comparing all four differences finds which is greatest. Working: the differences are 1,509 − 1,284 = 225 (Day 1 to Day 2), 1,830 − 1,509 = 321 (Day 2 to Day 3), 2,296 − 1,830 = 466 (Day 3 to Day 4), and 2,510 − 2,296 = 214 (Day 4 to Day 5); 466 is the greatest of the four, so the rate of increase was greatest from Day 3 to Day 4. Choosing Day 4 to Day 5 comes from picking the interval that ends on the highest total number of orders, 2,510, confusing the SIZE of the total with the RATE at which it grew. Choosing Day 1 to Day 2 comes from assuming the rate must be greatest at the very start, without working out any of the four differences. Choosing Day 2 to Day 3 comes from comparing only the first two differences, 225 and 321, and stopping there without checking Day 3 to Day 4 or Day 4 to Day 5. Finding the greatest rate of change from a table always means computing every difference between consecutive values and comparing them all — the day with the highest total, or the first pair you check, is not a shortcut.
- (b) 75 — The exchange rate is constant: k = 46 ÷ 40 = 1.15 euros per pound. For £65, the number of euros is 1.15 × 65 = 74.75, which rounds to 75 euros. Getting 74 comes from rounding 74.75 down instead of to the nearest whole number. Getting 57 comes from using the reciprocal rate (40 ÷ 46) instead of 46 ÷ 40. Getting 71 comes from adding the difference between 65 and 40 (25) onto 46 instead of using the proportional rate.
- (a) 45% — Method: percentage increase = increase ÷ original amount × 100. Working: the increase is £116 − £80 = £36, and 36 ÷ 80 = 0.45, so 0.45 × 100 = 45%. Answer: 45%. The distractors: 36% comes from quoting the £36 increase as though pounds and per cent were the same thing; 31% comes from dividing the £36 increase by the new price £116 instead of by the original £80, which gives 31% to the nearest per cent; 145% is the new price written as a percentage of the original price, which is the whole of the new price rather than the increase.
- (b) 4% — Method: find the total interest earned, share it equally across the number of years to find one year's interest, then write it as a percentage of the amount invested. Working: total interest = £840 − £750 = £90, so one year's interest is £90 ÷ 3 = £30, and £30 as a percentage of £750 is (£30 ÷ £750) × 100 = 4%. Answer: 4%. 12% comes from treating the total interest of £90 as if it were earned in a single year, (£90 ÷ £750) × 100 = 12%, forgetting to divide by 3 years. 0.04% comes from finding the correct decimal, £30 ÷ £750 = 0.04, but forgetting to multiply by 100 to convert it into a percentage. 112% comes from writing the final amount, £840, as a percentage of the amount invested, £750, without first subtracting the £750 to find the interest alone.
- (d) 12 — First find the y-values at the two ends of the chord. At x = 2, y = 2 × 2² + 5 = 2 × 4 + 5 = 8 + 5 = 13. At x = 4, y = 2 × 4² + 5 = 2 × 16 + 5 = 32 + 5 = 37. The gradient of the chord is the change in y divided by the change in x: 37 − 13 = 24, then 24 ÷ (4 − 2) = 24 ÷ 2 = 12. Stopping after finding the change in y and not dividing by the change in x gives 24, which is not a gradient at all. Inverting the fraction, change in x divided by change in y, gives 2 ÷ 24 ≈ 0.08. Averaging the two y-values instead of finding the change between them gives (13 + 37) ÷ 2 = 50 ÷ 2 = 25. A gradient is always change in y over change in x — never the other way round, and never a single y-value.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
- (d) 26.6 — Find the constant multiplier — the mass of each metre of pipe: 12.6 ÷ 4.5 = 2.8, so the mass is always 2.8 times the length. For a length of 9.5 m, the mass is 9.5 × 2.8 = 26.6 kg. 17.6 comes from assuming an additive relationship instead of a multiplicative one — adding the increase in length (9.5 − 4.5 = 5) onto 12.6. 3.4 comes from using the multiplier the wrong way round (4.5 ÷ 12.6, rounded to 1 d.p.), then multiplying by 9.5. 12.6 comes from simply repeating the given mass, without applying the multiplier to the new length.
- (d) 218 — The rule x_{n+1} = 0.8x_n + 50 must be applied once for each step, using the result of the previous step every time — not the same starting value repeated. Starting from x_0 = 200: 0.8 × 200 = 160, so x_1 = 160 + 50 = 210. Then 0.8 × 210 = 168, so x_2 = 168 + 50 = 218. Stopping after one iteration leaves x_1 = 210, not x_2. Applying only the multiplier twice without adding 50 at each step uses 0.8² = 0.64, and 0.64 × 200 = 128, which drops the 50 completely. Adding 50 twice at the end instead of once per step, 128 + 100 = 228, still does not reproduce the actual recurrence, because the 50 added at the first step is itself multiplied by 0.8 at the second step. After two iterations, x_2 = 218.
- (b) 5 years — The recurrence P_{n+1} = 1.1P_n − 30 must be applied once per year, checking after each application whether the population has passed 460. Starting from P_0 = 400: 400 × 1.1 − 30 = 410, so P_1 = 410. Then 410 × 1.1 − 30 = 421, so P_2 = 421. Then 421 × 1.1 − 30 = 433.1, so P_3 = 433.1. Then 433.1 × 1.1 − 30 = 446.41, so P_4 = 446.41, which is still below 460. Then 446.41 × 1.1 − 30 = 461.051, so P_5 = 461.051, the first value above 460. The population first exceeds 460 after 5 complete years. Stopping at P_4 = 446.41 and reporting 4 years reports the last year the population was still below 460, not the first year it was above. Counting the starting value P_0 = 400 as a year of growth makes P_5 the sixth number in the list and gives 6 years, but P_0 is the population before any year has passed, so P_5 is reached after 5 years, not 6. Reading "exceed 460" as "exceed the starting population of 400" instead gives P_1 = 410, already above 400, and 1 year — but the threshold named in the question is 460, not the starting value, so always check every value against the number actually stated in the question.
- (b) Takings rise about £14 per 1°C rise — The gradient here is positive, so as temperature rises, takings rise too: near 22°C, takings increase by about £14 for every 1°C rise in temperature. Reversing this to say takings rise for every 1°C FALL gets the direction of the independent variable backwards — a positive gradient means both quantities move the same way. Saying 'takings are £14 at 22°C' confuses the gradient, a rate of change, with the y-value on the graph, which is the takings itself. Saying takings 'rose £14 in total' from 0°C to 22°C treats the gradient at a single point as if it applied over the whole range from 0°C to 22°C, when it only describes the instant at 22°C. Always keep a rate, a total change and a single reading separate.
Build your own mix at the worksheet builder.