Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 80 — Method: the difference between 40% and 25% of the number is 15% of the number, and that difference is 12. Working: 15% of the number is 12, so 1% of the number is 12 ÷ 15 = 0.8, and the number is 0.8 × 100 = 80. Check: 40% of 80 is 32, 25% of 80 is 20, and 32 − 20 = 12. Answer: 80. The distractors: 30 comes from solving 40% of the number = 12; 48 comes from solving 25% of the number = 12; 15 is the percentage difference written as the answer.
- (c) Height rising at 2 m/s at t = 1.5 s — A tangent's gradient on a height-time graph is the instantaneous rate of change of height, in metres per second, so gradient 2 means the ball's height is increasing at 2 m/s at t = 1.5 s. Saying the height 'is 2 m' confuses the gradient, a rate, with the y-value on the graph, which is the ball's height itself. Saying the ball 'travelled 2 m from t = 1 to t = 2' treats the instantaneous gradient at one instant as if it were the total distance risen over a whole one-second interval, which is a different quantity found from two height readings, not from one tangent. Saying the speed 'is 2 m/s²' uses the wrong units — m/s² measures acceleration, the rate of change of speed, not speed itself. Always check that the units quoted match what a height-time graph's gradient can actually give you: metres per second.
- (c) 4/5 — Find 20% of £45: 10% is £4.50, so 20% is £9. The sale price is £45 − £9 = £36. Form the fraction 36/45; both numbers share a factor of 9, so 36 ÷ 9 = 4 and 45 ÷ 9 = 5, giving 4/5. 1/5 comes from writing the discount itself as a fraction of the normal price (9/45), instead of the sale price. 6/5 comes from adding the 20% instead of subtracting it, giving a sale price of £54, then 54/45 = 6/5. 5/9 comes from treating 'reduced by 20%' as 'reduced by £20', giving a sale price of £25, then 25/45 = 5/9.
- (a) Yes — the cost per metre is £1.50 each time — Direct proportion holds if the cost per metre is the same every time. Check each pair: 3.00 ÷ 2 = 1.50, 6.00 ÷ 4 = 1.50, and 10.50 ÷ 7 = 1.50. All three give the same rate, £1.50 per metre, so the data does show direct proportion. Saying only that the cost increases as the length increases is not enough on its own — many non-proportional relationships also increase, so this reason does not prove proportion. Misreading 10.50 ÷ 7 as 1.05 by misplacing the decimal point gives a false mismatch that is not actually there. Requiring every length to be a double of another confuses a special case (doubling) with the general test, which is that the rate itself stays constant. The data does show direct proportion, at £1.50 per metre.
- (b) 12 days — This is inverse proportion: fewer painters take longer. Multiply the original numbers to find the total painter-days needed: 8 × 6 = 48 painter-days. Divide by the new number of painters: 48 ÷ 4 = 12 days. Working out 6 × 4 ÷ 8 = 3 days treats it as direct proportion, as if fewer painters needed less time. Stopping at 48 gives the total painter-days, not the number of days. Working out 6 + (8 − 4) = 10 days adds the change in the number of painters straight onto the number of days, treating painters and days as the same kind of quantity. 4 painters take 12 days.
- (c) £32 — First find the gradient: (26 − 14) ÷ (50 − 20) = 12 ÷ 30 = £0.40 per minute. Using the point (20, 14), the charge for 65 minutes is 14 + 0.40 × (65 − 20) = 14 + 18 = £32. Choosing £26 comes from treating the charge as directly proportional to the time, multiplying the gradient by 65 minutes and ignoring the fixed part of the charge (0.40 × 65 = 26). Choosing £40 comes from treating £14 as if it were the charge at 0 minutes, then adding the gradient multiplied by the full 65 minutes (14 + 0.40 × 65 = 40), instead of multiplying by the extra time past 20 minutes. Choosing £33.80 comes from assuming the charge is directly proportional to the minutes already known, scaling up from the point (50, 26) in the ratio 65:50 (65 ÷ 50 × 26 = 33.80).
- (a) 12 — Speed × time is constant: k = 20 × 15 = 300. At 25 pages per minute, the time is 300 ÷ 25 = 12 minutes. Getting 18.75 comes from treating speed and time as directly proportional and working out 15 × 25 ÷ 20 instead of dividing k by the new speed. Getting 20 comes from adding the increase in speed (25 − 20 = 5) onto the time (15 + 5 = 20). Getting 10 comes from subtracting that same increase in speed from the time (15 − 5 = 10).
- (d) 3/2 — Work out the number of altos: 40% of 30 = 12. The rest are sopranos, so there are 30 − 12 = 18 sopranos. Form the fraction 18/12; both numbers share a factor of 6, so 18 ÷ 6 = 3 and 12 ÷ 6 = 2, giving 3/2. 2/3 comes from writing the fraction the wrong way round, as altos over sopranos (12/18). 3/5 comes from comparing the sopranos with the whole choir (18/30), instead of with the altos. 7/3 comes from miscalculating 30 − 12 as 28 instead of 18, then forming 28/12.
- (b) 2.5 hours — Method: when two objects move in opposite directions the gap between them grows at the sum of their speeds, so divide the required gap by that combined rate. Working: 80 + 60 = 140 km of gap each hour, and 350 ÷ 140 = 2.5. Answer: 2.5 hours. The distractors: 17.5 hours comes from subtracting the speeds, 80 − 60 = 20, which is the rate for two cars travelling in the same direction; 5 hours comes from using the mean of the two speeds, 70 km/h, instead of their sum; 4.375 hours comes from dividing 350 by 80 and ignoring the second car altogether.
- (a) 1000m — Method: kilograms are a smaller unit than tonnes, so change tonnes into kilograms by multiplying by 1000. Working: m tonnes = m × 1000 kg = 1000m kg. So the expression is 1000m. Distractor m/1000 comes from dividing by 1000 instead of multiplying, which would make the number of kilograms smaller than the number of tonnes, the wrong way round. Distractor 1000 + m comes from adding the conversion factor instead of multiplying by it. Distractor m − 1000 comes from subtracting the conversion factor instead of multiplying by it.
- (a) 3.375 — Method: the volume scale factor between similar shapes is the length scale factor cubed, not the length scale factor itself. Working: the length scale factor is 12 ÷ 8 = 1.5, and 1.5³ = 3.375. Answer: 3.375. Jayden's answer, 1.5, is only the LENGTH scale factor — he never cubed it to get the volume scale factor. 2.25 comes from squaring the length scale factor instead of cubing it, which would give the area scale factor. 4.5 comes from multiplying the length scale factor by 3 (the number of dimensions) instead of cubing it.
- (a) 150 g — Method: scale the recipe to find the total sugar needed, then subtract the sugar Sam already has. Working: 200 ÷ 8 × 20 = 500, so 500 g is needed in total; 500 − 350 = 150, so 150 g still to buy. Stopping after finding the total, 500, without subtracting what he has gives 500 g. Scaling the wrong way round, 200 × 8 ÷ 20 = 80, wrongly suggests he already has enough, giving 0 g. Adding the amount he has instead of subtracting it, 500 + 350 = 850, gives 850 g.
- (a) 20 litres per minute — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, and its units are the vertical unit for each one of the horizontal unit. Working: from (2, 50) to (6, 130) the volume changes by 130 − 50 = 80 litres and the time changes by 6 − 2 = 4 minutes, so the gradient is 80 ÷ 4 = 20, measured in litres for each minute. Answer: 20 litres per minute. The distractors: 25 litres per minute comes from using one point on its own, 50 ÷ 2, which assumes the line starts at the origin when the tank already held 50 litres at 2 minutes; 0.05 litres per minute comes from dividing the change in time by the change in volume, 4 ÷ 80, which gives the time for each litre but is then labelled as litres for each minute; 20 minutes for each litre has the right value with the units the wrong way round, and a tank that needed 20 minutes to gain a single litre would be filling far more slowly than this one.
- (b) 16 — Method: substitute x into each equation separately, then subtract the smaller value from the larger. Working: y = 3 × 4 = 12 and z = 7 × 4 = 28, so the difference is 28 − 12 = 16. Answer: 16. The distractors: 4 comes from subtracting the constants, 7 − 3, which is the difference between the two gradients rather than the difference between the values at x = 4; 40 comes from adding the two values, 12 + 28, instead of subtracting them; 28 is the value of z on its own, given instead of being compared with the value of y.
- (b) 20 — The gradient is the change in p divided by the change in t: (90 − 30) ÷ (5 − 2) = 60 ÷ 3 = 20. Choosing 0.05 comes from dividing the change in t by the change in p, the wrong way round (3 ÷ 60). Choosing −20 comes from subtracting the coordinates in the wrong order for one part of the calculation, for example (30 − 90) ÷ (5 − 2), giving a negative value. Choosing 18 comes from dividing the second p-coordinate by the second t-coordinate directly (90 ÷ 5) instead of using the change between the two points.
Build your own mix at the worksheet builder.