Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 70 km/h — Method: average speed for a whole journey is the total distance divided by the total time, not the mean of the separate speeds. Working: 3 × 80 = 240 km and 1 × 40 = 40 km, giving 280 km in 3 + 1 = 4 hours, so 280 ÷ 4 = 70. Answer: 70 km/h. The distractors: 60 km/h comes from taking the mean of 80 and 40, which would only be right if equal times were spent at each speed; 280 km/h is the total distance written with a speed unit, from forgetting to divide by the total time; 80 km/h comes from quoting the speed of the longer leg as the average for the whole journey.
- (b) 3 km — Method: multiply by the scale factor to get the real length in centimetres, then convert to kilometres. Working: 7.5 × 40 000 = 300 000 cm. 300 000 ÷ 100 000 = 3 km. Wrong options: 30 km comes from dividing by 10 000 instead of 100 000 when converting to kilometres; 3000 km comes from dividing by 100 instead of 100 000; 0.3 km comes from dividing by 1 000 000, an extra factor of 10 too many.
- (b) t = 5 and t = 7 (closest, evenly spaced) — To estimate the instantaneous rate of change at t = 6, use the chord centred on t = 6 with the closest readings on either side, t = 5 and t = 7. The gradient of this chord is 15.4 − 17.5 = −2.1, then −2.1 ÷ 2 = −1.05 cm per minute. The interval t = 3 to t = 9 is also centred on t = 6 but is wider: 13.4 − 18.7 = −5.3, then −5.3 ÷ 6 ≈ −0.88 cm per minute — this brings in more of the curve's own change in steepness, so it is a worse estimate of the rate at the single instant t = 6. Using t = 6 and t = 7 only gives 15.4 − 16.6 = −1.2, then −1.2 ÷ 1 = −1.2 cm per minute, but this is not centred on t = 6 — it estimates the rate over (6, 7), not at t = 6 itself. Using t = 0 and t = 6 gives 16.6 − 20.0 = −3.4, then −3.4 ÷ 6 ≈ −0.57 cm per minute, the average rate for the whole first six minutes, not the rate at the instant t = 6. Always choose the chord that brackets the point as closely as possible.
- (a) £14224 — Value after 2 years: £15000 × 1.04 × 1.04 = £16224. Money left after buying the trailer: £16224 − £2000 = £14224. £14200 comes from treating the two 4% increases as a single flat 8% increase applied once instead of compounding: £15000 × 1.08 = £16200, and £16200 − £2000 = £14200. £13600 comes from applying the 4% increase only once, for 1 year instead of 2: £15000 × 1.04 = £15600, and £15600 − £2000 = £13600. £18224 comes from adding the £2000 instead of subtracting it: £16224 + £2000 = £18224.
- (a) 4/5 — Method: find the June takings first, then write them over the May takings and cancel. Working: the takings fell by £900, so June is £4500 − £900 = £3600; the fraction is 3600/4500, and dividing the numerator and the denominator by 900 gives 4/5. Answer: 4/5 of the May takings. The distractors: 1/5 comes from writing the fall over the May takings, 900/4500, which answers how far the takings dropped rather than what June's takings are compared with May's; 5/4 comes from writing May over June, 4500/3600, reversing the order the question asks for; 4/9 comes from writing June over the two months added together, 3600/8100, a part-to-whole fraction when the comparison asked for is with May alone.
- (c) 45% — Method: adding water changes the total volume but not the amount of fruit juice, so find the juice, find the new total volume, and write the first as a percentage of the second. Working: 3 × 0.6 = 1.8 litres of fruit juice; the new volume is 3 + 1 = 4 litres; 1.8 ÷ 4 = 0.45, which is 45%. Answer: 45%. The distractors: 60% is the strength before the water goes in, and assumes that adding water leaves the strength unchanged; 15% comes from dividing the 60% by the 4 litres of mixture instead of dividing the 1.8 litres of juice by the 4 litres; 75% is the fraction of the new mixture that came out of the original jug, 3 litres out of 4, which ignores that only 60% of that 3 litres was juice.
- (a) 12/5 — If A is 5/12 of B, then B is the reciprocal of that fraction times A: flip 5/12 to get 12/5, so B is 12/5 of A. 5/12 comes from keeping the same fraction without flipping it, treating the relationship as if it works the same way in both directions. 7/12 comes from computing 1 − 5/12 = 7/12, which is not how a fraction reverses. 12/7 comes from subtracting 5 from 12 to get 7, and writing 12 over that, instead of swapping the numerator and denominator of 5/12.
- (a) 3/8, 41%, 0.43 — Method: convert every value to a decimal so they can be compared on the same scale, then order them. Working: 3/8 = 0.375, 41% = 0.41, and 0.43 stays as 0.43, so from smallest to largest the decimals are 0.375, 0.41, 0.43, giving the order 3/8, 41%, 0.43. Answer: 3/8, 41%, 0.43. The order 3/8, 0.43, 41% comes from comparing 0.43 and 41% as raw digits (43 versus 41) without converting 41% into the decimal 0.41 first, wrongly placing 0.43 before 41%. The order 0.43, 41%, 3/8 comes from placing the values in completely reversed order, from largest to smallest instead of smallest to largest. The order 41%, 0.43, 3/8 comes from ordering the values by their TYPE (percentage, then decimal, then fraction) rather than by their actual size.
- (d) 5:3:2 — German = 100% − 50% − 30% = 20%. The ratio 50 : 30 : 20 simplifies by dividing every part by 10 to give 5 : 3 : 2.
- (b) 1500 — The rate is 3 ÷ 2 = 1.5 litres per minute. Converting to cm³: 1.5 × 1000 = 1500 cm³ per minute. Getting 3000 comes from converting 3 litres to cm³ first (3000 cm³) and forgetting to divide by the 2 minutes. Getting 750 comes from dividing by the 2 minutes a second time after converting (1500 ÷ 2). Getting 2000 comes from converting the 2 minutes as if it were litres (2 × 1000) instead of using the correct rate of 1.5 litres per minute.
- (b) Car A, 50 km/h — Method: speed = distance ÷ time for each car, then compare. Working: Car A = 150 ÷ 3 = 50 km/h. Car B = 180 ÷ 4 = 45 km/h. Since 50 > 45, Car A is faster, travelling at 50 km/h. Wrong options: Car B, 45 km/h correctly finds Car B's speed but wrongly names the slower car as faster; Car A, 45 km/h picks the correct car but uses Car B's speed by mistake; Car B, 50 km/h picks the wrong car but uses Car A's correct speed value.
- (a) It's an average over 20 days, which may miss the day-5 rate. — Method: a chord's gradient is the AVERAGE rate of change across the whole interval it spans; it only closely approximates the INSTANTANEOUS rate of change at a point inside that interval when the rate of change is roughly constant across the interval, which usually means the interval needs to be short. Working: here the chord spans 20 days while the point of interest, t = 5, is only a quarter of the way along it, so if the reservoir's level rose or fell at different rates over that time, the chord's gradient will not be close to the true gradient of the curve at t = 5 — this is the correct reason. Claiming the chord's gradient needs the water level at every day in between is wrong: a chord's gradient needs only the two endpoint values, at t = 0 and t = 20. Claiming a chord can only estimate the rate at its own endpoints is wrong: a chord between two points can be used to estimate the instantaneous rate of change at any point inside the interval, including one that is not an endpoint — that is exactly the technique being used here, and it is the SIZE of the interval that makes the estimate poor, not the fact that t = 5 is an interior point. Claiming the units do not match is wrong: the chord's gradient and the instantaneous rate of change are both measured in metres per day, so the units are the same. A chord is only a good estimate of an instantaneous rate when the interval it spans is short enough that the rate does not change much within it — always check how long the interval is compared with how far it is to the point you actually want.
- (b) 2/5 — Method: a fraction taken 'of the total' has the whole batch as its denominator, so add the two masses first and then write the butter over that total. Working: the total mass is 450 g + 300 g = 750 g, so the fraction is 300/750; the highest common factor of 300 and 750 is 150, and 300 ÷ 150 = 2 while 750 ÷ 150 = 5. Answer: 2/5 of the batch. The distractors: 2/3 comes from comparing the butter with the flour, 300/450, a part-to-part fraction when the question asks for a part compared with the whole; 3/5 comes from writing the flour over the total, 450/750, which answers about the wrong ingredient; 3/2 comes from writing the flour over the butter, 450/300, which both uses the wrong denominator and reverses the order.
- (b) €230.00 — Multiply the amount in pounds by the exchange rate: 200 × 1.15 = 230, so £200 = €230.00. Working out 200 + 1.15 = 201.15 treats the exchange rate as an amount to add rather than a multiplier. Working out 200 × 0.15 = 30 finds only the extra amount earned for every pound and forgets to add it back to the original £200. Working out 200 × 11.5 = 2300.00 misplaces the decimal point in the exchange rate, multiplying by 11.5 instead of 1.15. £200 converts to €230.00.
- (b) 20 km — The scale 2 cm : 5 km means each 1 cm on the map represents 5 ÷ 2 = 2.5 km in real life. The footpath is 8 cm on the map, so its real length is 8 × 2.5 = 20 km. 40 km comes from multiplying 8 by 5 directly, ignoring that the scale's '2 cm' has to be divided out first: 8 × 5 = 40. 3.2 km comes from dividing 8 by 2.5 instead of multiplying: 8 ÷ 2.5 = 3.2. 5 km comes from multiplying 2.5 by the scale's '2' instead of by the footpath's 8 cm: 2.5 × 2 = 5.
Build your own mix at the worksheet builder.