Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 15 — Find the multiplier connecting y to x: 10 ÷ 4 = 2.5. Then apply it to the new value of x: 2.5 × 6 = 15. Working out 10 + (6 − 4) = 12 adds the change in x straight onto y instead of scaling proportionally. Working out 10 × 6 = 60 multiplies the given y-value by the new x-value directly, without finding the multiplier first. Writing 10 keeps y the same as before, not realising it must change with x. When x = 6, y = 15.
- (a) 5:3 — Divide both prices by their highest common factor, 3: 15 ÷ 3 = 5 and 9 ÷ 3 = 3, giving the ratio 5:3. Choosing 3:5 comes from writing the ratio the wrong way round, as child price to adult price. Choosing 2:3 comes from using the difference between the two prices (15 − 9 = 6) as the first part of the ratio instead of the adult price, then simplifying 6:9 by dividing by 3. Choosing 5:8 comes from comparing the adult price with the total cost of both tickets (£15 out of £24) instead of comparing it with the child price.
- (b) 4/3 — Work out the number of bananas: 3/4 of 16 = 12. Form the fraction 16/12 (apples over bananas); both numbers share a factor of 4, so 16 ÷ 4 = 4 and 12 ÷ 4 = 3, giving 4/3. 3/4 comes from giving the fraction that was already stated in the question (bananas as a fraction of apples), instead of inverting it. 4/1 comes from reading '3/4 of the apples' as 'the apples reduced by 3/4', giving only 4 bananas, then 16/4 = 4. 4/7 comes from comparing the apples with the total number of pieces of fruit (16/28), instead of with the bananas alone.
- (b) litres per minute — The gradient of a tangent is the change in the quantity on the vertical axis divided by the change in the quantity on the horizontal axis, so its units come from both axes: litres on the vertical axis and minutes on the horizontal axis give litres per minute. Giving the units as minutes for each litre inverts the fraction, giving the units of the RECIPROCAL of the gradient, not the gradient itself. Writing just litres uses only the vertical axis's units and ignores that a gradient is a rate, not an amount. Writing just minutes uses only the horizontal axis's units. A gradient always combines both axes' units as one divided by the other.
- (a) 1:8 — Convert 2 kg to grams: 2 kg = 2000 g. The ratio is 250 : 2000. The highest common factor of 250 and 2000 is 250. Divide both parts by 250: 250 ÷ 250 = 1 and 2000 ÷ 250 = 8, so the ratio is 1 : 8. Leaving the kilograms unconverted gives 250 : 2, which simplifies to 125 : 1 — the units on each side are different, so this does not compare like with like. Dividing by 50 instead of 250 gives 5 : 40, which still shares a common factor of 5, so it is not fully simplified. Swapping the order gives 8 : 1, grams to kilograms the wrong way round.
- (c) 40 — Working out successive terms shows where the sequence is heading, but the terms themselves keep changing — the limit is the value where the sequence stops changing, so x_{n+1} = x_n = L there. Substituting into the rule: L = 0.5L + 20. Subtracting 0.5L from both sides: L − 0.5L = 20, so 0.5L = 20, and L = 20 ÷ 0.5 = 40. The individual terms are x_1 = 0.5 × 0 + 20 = 20, x_2 = 0.5 × 20 + 20 = 30 and x_3 = 0.5 × 30 + 20 = 35, getting closer to this value but not equal to it — 35 is only the third term, not the limit. Multiplying by 0.5 instead of dividing at the final step, 20 × 0.5 = 10, undoes the rearrangement rather than completing it, and gives a value smaller than terms the sequence has already passed. Writing the fixed-point equation with the wrong sign, L = 0.5L − 20, gives 0.5L = −20 and L = −40, which cannot be right since every term in the sequence is positive and increasing. The value the sequence is approaching is 40.
- (c) 1 : 3 — n : P = 15 : 45. Dividing both parts by their highest common factor, 15, gives 1 : 3. Inverting the ratio, 3 : 1, swaps profit and number of items. Dividing only the n-part by 15, getting 1, but leaving the P-part as 45 gives 1 : 45 — only one side has been simplified. Dividing only the P-part by 15, getting 3, but leaving the n-part as 15 gives 15 : 3, the opposite partial mistake.
- (d) Gradient = acceleration; area = distance travelled. — Method: on a speed–time graph, the gradient of the graph at an instant is the rate of change of speed with time, which is acceleration; the area between the graph and the time-axis over an interval is the total distance covered in that interval, because it accumulates speed × time. Working: gradient = acceleration and area = distance travelled is the correct pairing. Swapping the two quantities completely, gradient = distance travelled and area = acceleration, is the reverse of what each actually measures. Keeping gradient = acceleration correct but then also claiming area = acceleration too is wrong because the area is a different physical quantity, distance, not a second way of finding the same rate. Claiming the gradient itself gives the speed confuses the RATE OF CHANGE of the plotted quantity with the plotted quantity itself — the gradient is how fast the speed is changing, not the speed. On any rate graph, the gradient of the graph is always the RATE at that instant, and the area under the graph is always the TOTAL AMOUNT accumulated — keep straight which of the two questions each one answers.
- (a) 6 — Method: for inverse proportion the product xy is the same for every pair, so find that product and use it to work back to the missing value. Working: xy = 2 × 15 = 30, so when x = 5 the equation 5y = 30 gives y = 30 ÷ 5 = 6. Answer: 6. The distractors: 37.5 comes from treating the pair as direct proportion and scaling y up with x, 15 × 5 ÷ 2, although in inverse proportion y falls as x rises; 30 is the constant product itself, given as a value of y rather than used to find one; 12 comes from additive thinking — x rises by 3, so 3 is taken off y — which would make the two quantities differ by a constant instead of multiplying to one.
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (d) 3 : 2 — Convert both amounts to pence: £3.60 = 360p and £2.40 = 240p, giving the ratio 360 : 240. Divide both parts by their highest common factor, 120, to get 3 : 2. Giving 360 : 240 has not been simplified at all. Giving 2 : 3 swaps the order. Giving 36 : 24 has been divided by 10, which is a common factor but not the highest one, so it is not yet in simplest form.
- (a) No — the cost per metre differs: £2.50/m vs £2.20/m — Method: divide cost by length for each pair and compare the unit rates. Working: £7.50 ÷ 3 = £2.50 per m; £11.00 ÷ 5 = £2.20 per m. The rates are different, so this is NOT direct proportion. Wrong options: 'Yes — both amounts increase' wrongly assumes any increasing relationship is proportional; 'No — because 5 m costs more in total' judges by total cost rather than the rate per metre, which is not valid reasoning on its own; 'Yes — the cost per metre is £2.50 in both cases' miscalculates the second rate (11.00 ÷ 5 is £2.20, not £2.50).
- (c) 16 cm — Corresponding sides of similar triangles are all in the same ratio. Use the pair whose lengths are both known: the scale factor from triangle ABC to triangle PQR is 12 ÷ 6 = 2. Since QR corresponds to BC, multiply BC by that scale factor: 8 × 2 = 16, so QR = 16 cm.
- (b) 1.5 km — Multiply the map length by the scale factor: 6 × 25000 = 150000 cm. Convert to kilometres, using 100 cm = 1 m and 1000 m = 1 km, so 100000 cm = 1 km: 150000 ÷ 100000 = 1.5 km. (1500 km comes from converting only as far as metres, 150000 ÷ 100 = 1500 m, and then writing kilometres on the end. 15 km comes from dividing by 10000 instead of 100000. 0.15 km comes from dividing by 1000000 instead of 100000.)
- (a) S_{n+1} = 1.04S_n − 30 — Adding 4% interest multiplies the balance by 1 + 0.04 = 1.04. Withdrawing £30 afterwards subtracts a fixed 30, giving S_{n+1} = 1.04S_n − 30. Writing +30 instead of −30 mistakes a withdrawal for a deposit — the £30 leaves the account, so it must be subtracted. Writing 0.96 instead of 1.04 treats the 4% as a decrease rather than an increase, as if the interest were shrinking the balance instead of growing it. Writing 1.4 instead of 1.04 turns 4% into 40%, a common slip when converting a percentage to a multiplier — 4% as a decimal is 0.04, so the multiplier is 1.04, not 1.4. Always convert the percentage to a decimal first, then add 1 for growth or subtract from 1 for decay, before applying any fixed amount that is added or removed.
Build your own mix at the worksheet builder.