Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 8:1 — Multiply both parts of the ratio by 4 to clear the fraction: 2 × 4 = 8 and 1/4 × 4 = 1, giving 8 : 1. Getting 1 : 8 has the two parts the wrong way round. Getting 2 : 4 comes from writing down the denominator of the fraction (4) as the second part instead of multiplying through by it. Getting 8 : 4 comes from multiplying only the first part of the ratio by 4 and leaving the second part as the fraction's denominator.
- (a) 70 km/h — Method: average speed for a whole journey is the total distance divided by the total time, not the mean of the separate speeds. Working: 3 × 80 = 240 km and 1 × 40 = 40 km, giving 280 km in 3 + 1 = 4 hours, so 280 ÷ 4 = 70. Answer: 70 km/h. The distractors: 60 km/h comes from taking the mean of 80 and 40, which would only be right if equal times were spent at each speed; 280 km/h is the total distance written with a speed unit, from forgetting to divide by the total time; 80 km/h comes from quoting the speed of the longer leg as the average for the whole journey.
- (b) 450.00 kg — 1 m³ = 100 × 100 × 100 = 1,000,000 cm³, so 0.5 m³ = 500,000 cm³. Mass = density × volume = 0.9 × 500,000 = 450,000 g. Converting to kilograms by dividing by 1000 gives 450,000 ÷ 1000 = 450.00 kg. Skipping the m³-to-cm³ conversion and multiplying 0.9 × 0.5 = 0.45 treats the volume as if it were already 0.5 cm³, giving 0.45 kg. Finding the mass correctly in grams, 450,000 g, but not converting to kilograms leaves 450000.00 kg, out by a factor of 1000. Using the area conversion factor of 10,000, as if converting m² to cm², instead of the volume factor of 1,000,000 gives 0.5 × 10,000 = 5,000 'cm³', and a mass of 0.9 × 5,000 = 4,500 g, which is 4.50 kg.
- (a) It's an average over 20 days, which may miss the day-5 rate. — Method: a chord's gradient is the AVERAGE rate of change across the whole interval it spans; it only closely approximates the INSTANTANEOUS rate of change at a point inside that interval when the rate of change is roughly constant across the interval, which usually means the interval needs to be short. Working: here the chord spans 20 days while the point of interest, t = 5, is only a quarter of the way along it, so if the reservoir's level rose or fell at different rates over that time, the chord's gradient will not be close to the true gradient of the curve at t = 5 — this is the correct reason. Claiming the chord's gradient needs the water level at every day in between is wrong: a chord's gradient needs only the two endpoint values, at t = 0 and t = 20. Claiming a chord can only estimate the rate at its own endpoints is wrong: a chord between two points can be used to estimate the instantaneous rate of change at any point inside the interval, including one that is not an endpoint — that is exactly the technique being used here, and it is the SIZE of the interval that makes the estimate poor, not the fact that t = 5 is an interior point. Claiming the units do not match is wrong: the chord's gradient and the instantaneous rate of change are both measured in metres per day, so the units are the same. A chord is only a good estimate of an instantaneous rate when the interval it spans is short enough that the rate does not change much within it — always check how long the interval is compared with how far it is to the point you actually want.
- (b) 2, the cost in pounds of each extra gigabyte — Method: the gradient is the change in cost divided by the change in data, so it is the cost of each extra gigabyte; the value where the line meets the vertical axis is the charge before any data is used, which is a different quantity. Working: from (0, 10) to (8, 26) the cost rises by 26 − 10 = 16 pounds while the data rises by 8 − 0 = 8 gigabytes, so the gradient is 16 ÷ 8 = 2, meaning each extra gigabyte costs £2. Answer: 2, the cost in pounds of each extra gigabyte. The distractors: '10, the cost in pounds of each extra gigabyte' reads the intercept as the gradient, but 10 is what the tariff costs when no data at all has been used; '3.25, the cost in pounds of each extra gigabyte' comes from 26 ÷ 8, treating the line as though it passed through the origin when it starts at 10; '2, the fixed monthly charge in pounds' has the gradient right but describes the intercept, and the fixed charge on this tariff is £10.
- (d) 25% — Method: percentage decrease = decrease ÷ original amount × 100. Working: the reduction is £60 − £45 = £15, and 15 ÷ 60 = 0.25, so 0.25 × 100 = 25%. Answer: 25%. The distractors: 15% comes from quoting the £15 reduction as though pounds and per cent were the same thing; 33% comes from dividing the £15 by the new price £45 instead of by the original £60, which gives 33% to the nearest per cent; 75% is the new price written as a percentage of the old one, which is what is still paid rather than what has been taken off.
- (c) C = 1.5n — Method: a fixed ratio between C and n means C is always the same multiple of n, and that multiple is the cost of one bottle. Working: 3.00 ÷ 2 = 1.5, 7.50 ÷ 5 = 1.5 and 12.00 ÷ 8 = 1.5, so every bottle costs £1.50 and C = 1.5n. Answer: C = 1.5n. The distractors: C = n + 1 comes from subtracting on the first row, 3 − 2 = 1, and adding that difference instead of multiplying; it fits the first row and fails the other two, which is why three rows are given; C = 3n reads the £3.00 as the price of one bottle when it is the price of two; C = n/1.5 divides the number of bottles by the price of one bottle, which works out how many bottles a pound buys instead of what n bottles cost.
- (c) 30 km — First convert 1 hour 15 minutes to hours: 15 minutes is a quarter of an hour, so the time is 1.25 hours. Then multiply by the speed: 24 × 1.25 = 30 km. Reading 15 minutes as 0.15 hours (writing the minutes after the decimal point instead of as a fraction of 60) gives 24 × 1.15 = 27.6 km. Working out 24 × 75 = 1800 multiplies by the number of minutes instead of converting to hours first. Working out 24 ÷ 1.25 = 19.2 divides by the time instead of multiplying. The cyclist travels 30 km.
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (b) 12 — Since y is directly proportional to √x, y = k√x. Using x = 4, y = 8: √4 = 2, so 8 = k × 2, giving k = 8 ÷ 2 = 4. The equation is y = 4√x. When x = 9: √9 = 3, so y = 4 × 3 = 12. Treating the relationship as if y were proportional to x itself, rather than to √x, gives k = 8 ÷ 4 = 2 and then y = 2 × 9 = 18, which is a different relationship. Multiplying k by the new x-value instead of by its square root gives y = 4 × 9 = 36, skipping the square root altogether. Reporting √9 on its own, without multiplying by k, gives only 3, not the value of y. When x = 9, y = 12.
- (d) 25 minutes — Method: find the time for one kilometre, then multiply by the number of kilometres — the unitary method with a rate. Working: 10 ÷ 2 = 5 minutes per km, and 5 × 5 = 25. Answer: 25 minutes. The distractors: 20 minutes comes from multiplying the 10 minutes by 2, the distance in the given rate, instead of by the scale factor 2.5; 50 minutes comes from multiplying 10 by 5, treating the 10 minutes as the time for a single kilometre; 15 minutes comes from adding the 5 km on to the 10 minutes, adding quantities that are not the same kind.
- (c) £22.50 — Method: find the cost of 1 kg, then multiply by the mass wanted. Working: £36 ÷ 2.4 = £15 per kilogram, and 1.5 × £15 = £22.50. Answer: £22.50. The distractors: £15 is the price of 1 kg, which is the first step and not what the question asks for; £54 comes from multiplying the £36 by 1.5 without first reducing it to a price per kilogram; £57.60 comes from using the scale factor upside down, multiplying £36 by 2.4 ÷ 1.5 = 1.6 instead of by 1.5 ÷ 2.4.
- (c) They are in direct proportion, because y ÷ x = 2.5 for both pairs. — Testing direct proportion means checking that y ÷ x is the same for every pair: 15 ÷ 6 = 2.5 and 25 ÷ 10 = 2.5, so the quantities are in direct proportion. Saying they are not in proportion because x + y differs uses addition, which is not the correct test for proportion. Saying they are not in proportion because y − x differs also uses the wrong test — subtraction, not division. Saying they are in proportion because x × y is 90 and 250 uses multiplication, which is the test for inverse proportion, and the two products are not even equal to each other, so this option also contradicts itself.
- (c) 1.2 — Add the parts of the ratio: 6 + 1 = 7. Divide the total amount by the number of parts: 8.4 ÷ 7 = 1.2 litres, which is the value of one part and also the amount of syrup, since syrup is 1 part. (7.2 litres is the amount of water, using 6 parts instead of 1. 1.4 comes from dividing 8.4 by 6 — the water's part of the ratio — instead of dividing by the total number of parts, 7. 0.84 comes from dividing 8.4 by 10 instead of by 7.)
- (a) 2 km — Method: multiply the map distance by the scale to get the real distance in centimetres, then convert centimetres to kilometres using 100 cm = 1 m and 1000 m = 1 km. Working: 4 × 50 000 = 200 000 cm; 200 000 ÷ 100 = 2000 m; 2000 ÷ 1000 = 2. Answer: 2 km. The distractors: 200 km comes from dividing the 200 000 cm by 1000 in a single step, as if a kilometre were 1000 cm rather than the 100 000 cm it is; 20 km comes from converting to metres correctly, 200 000 ÷ 100 = 2000 m, and then dividing those metres by 100 instead of by 1000; 0.2 km comes from dividing by 1000 to reach metres, as if a metre were 1000 cm, and then dividing by 1000 again, so 200 000 is divided by 1 000 000 altogether.
Build your own mix at the worksheet builder.