- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (d) The 750 g box, at 36p per 100 g — Work out the cost per 100 g of each box. 750 g box: 270p ÷ 7.5 = 36p per 100 g. 500 g box: 195p ÷ 5 = 39p per 100 g. The lower cost per 100 g is the better value, so the 750 g box at 36p per 100 g is the answer. Choosing the 500 g box at 39p per 100 g gets the maths right but picks the higher unit price, not realising a smaller cost per 100 g is the better deal. Choosing the 500 g box because £1.95 is lower than £2.70 compares the total prices without allowing for the different pack sizes at all. Working out 270 ÷ 5 = 54p divides the 750 g box's price by the wrong number of hundred-grams (the 500 g box's), giving a rate that belongs to neither box. The 750 g box, at 36p per 100 g, is the better value.
- (d) 500 ml — Varnish covers a surface, so the amount needed scales with the area scale factor, which is the square of the length scale factor. The length scale factor is 50 ÷ 20 = 2.5, so the area scale factor is 2.5 × 2.5 = 6.25. The varnish needed for the larger statue is 80 × 6.25 = 500 ml. Using 2.5 on its own would scale a length, not a surface.
- (a) 4 days — Method: the fence is a fixed amount of work, so builders × days is constant; find that product and divide it by the new number of builders. Working: 3 × 12 = 36 builder-days of work, so with 9 builders the time is 36 ÷ 9 = 4 days. Answer: 4 days. The distractors: 6 days comes from halving the 12 days because there are more builders, rather than dividing by the factor of 3 by which the workforce has grown; 36 days is the constant product of builders and days, given as a number of days instead of being shared between the builders; 9 days comes from taking 3 days off the 12, treating three extra builders as three fewer days, which is additive rather than proportional.
- (b) 12 days — This is inverse proportion: fewer painters take longer. Multiply the original numbers to find the total painter-days needed: 8 × 6 = 48 painter-days. Divide by the new number of painters: 48 ÷ 4 = 12 days. Working out 6 × 4 ÷ 8 = 3 days treats it as direct proportion, as if fewer painters needed less time. Stopping at 48 gives the total painter-days, not the number of days. Working out 6 + (8 − 4) = 10 days adds the change in the number of painters straight onto the number of days, treating painters and days as the same kind of quantity. 4 painters take 12 days.
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
- (d) 7/5 — The number of unbroken crayons is 60 − 25 = 35. The comparison is with the broken crayons, so the broken crayons are the denominator: 35/25. Both parts divide by 5: 35 ÷ 5 = 7 and 25 ÷ 5 = 5. The fraction is 7/5, which is greater than 1 because there are more unbroken crayons than broken ones.
- (a) 40 m² — A scale of 1 : 10 is a length scale factor of 10 from model to real. Areas scale with the square of the length scale factor: 10² = 100. 0.4 × 100 = 40, so the real staircase covers 40 m². Giving 4 m² uses the length scale factor, 10, without squaring it (0.4 × 10 = 4). Giving 0.04 m² divides by the scale factor instead of multiplying by its square (0.4 ÷ 10 = 0.04). Giving 400 m² cubes the scale factor, 10³ = 1000, as if area scaled like a volume (0.4 × 1000 = 400).
- (b) 10000 cm² — Method: an area conversion factor is the square of the length conversion factor, because both sides of the square are scaled. Working: a square metre is a square of side 100 cm, so its area is 100 × 100 = 10000 cm². Answer: 10000 cm². The distractors: 100 cm² comes from using the length factor without squaring it; 200 cm² comes from doubling the length factor instead of squaring it; 1000000 cm² comes from cubing the factor, which is the conversion for a volume, not an area.
- (a) £85.47 — Value after 2 years: £1200 × 1.035 × 1.035 = £1285.47 (nearest penny). Interest earned = £1285.47 − £1200 = £85.47. £1285.47 is the total value of the account, not the interest earned on top of the original £1200. £84.00 comes from using simple interest instead of compound interest: £1200 × 0.035 × 2 = £84.00. £42.00 comes from working out only the first year's interest and stopping there: £1200 × 0.035 = £42.00.
- (b) Takings rise about £14 per 1°C rise — The gradient here is positive, so as temperature rises, takings rise too: near 22°C, takings increase by about £14 for every 1°C rise in temperature. Reversing this to say takings rise for every 1°C FALL gets the direction of the independent variable backwards — a positive gradient means both quantities move the same way. Saying 'takings are £14 at 22°C' confuses the gradient, a rate of change, with the y-value on the graph, which is the takings itself. Saying takings 'rose £14 in total' from 0°C to 22°C treats the gradient at a single point as if it applied over the whole range from 0°C to 22°C, when it only describes the instant at 22°C. Always keep a rate, a total change and a single reading separate.
- (c) 2/7 — Method: each number in a ratio counts parts, so the whole is all the parts added together, and the fraction wanted is the cement parts over that total. Working: the mix has 5 + 2 = 7 parts altogether, and 2 of those parts are cement, so the cement is 2/7 of the mix. Answer: 2/7. The distractors: 2/5 comes from writing the cement parts over the sand parts, comparing one part with the other part instead of with the whole; 5/7 comes from writing the sand parts over the total, which answers about the wrong material; 7/2 comes from writing the total over the cement parts, turning the fraction upside down.
- (c) 500 — Pressure = force ÷ area = 250 ÷ 0.5 = 500 pascals. Getting 125 comes from multiplying the force by the area instead of dividing (250 × 0.5 = 125). Getting 249.5 comes from subtracting the area from the force instead of dividing. Getting 50 comes from misreading the area as 5 m² instead of 0.5 m² and dividing 250 by 5.
- (a) 28.8 km/h — Method: first change metres per second into metres per hour, then change metres into kilometres. Working: 8 × 3600 = 28800 metres per hour, then 28800 ÷ 1000 = 28.8 km/h. So the runner's speed is 28.8 km/h. Distractor 28800 km/h comes from stopping after the first step and forgetting to change metres into kilometres. Distractor 2.22 km/h comes from dividing by 3600 instead of multiplying, then multiplying by 1000. Distractor 2.88 km/h comes from using 360 instead of 3600 seconds in an hour, missing a zero.
- (b) 250 g — Method: adding water changes the total mass but not the mass of salt, so find the salt, hold it fixed, use the new ratio to find the new total mass and subtract the mass already in the beaker. Working: 12:100 = x:500 gives 12 ÷ 100 × 500 = 60 g of salt; that 60 g must be 8% of the new mixture, so 8:100 = 60:y gives y = 60 ÷ 8 × 100 = 750 g; the water added is 750 − 500 = 250 g. Answer: 250 g. The distractors: 750 g is the mass of the diluted solution, given without taking away the 500 g that was in the beaker to start with; 60 g is the mass of salt, the quantity that stays the same, given instead of the mass of water; 20 g comes from treating the fall from 12% to 8% as 4% of the original 500 g, which measures a change in concentration as though it were a mass of water.