Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 120 minutes — Method: find the rate in bottles per minute, then divide the order size by the rate. Working: rate = 810 ÷ 45 = 18 bottles per minute. Time = 2,160 ÷ 18 = 120 minutes. Wrong options: 1,350 minutes comes from subtracting 810 from 2,160 instead of using the rate; 48 minutes comes from dividing the order size by the original time (2,160 ÷ 45) instead of the rate; 108 minutes comes from rounding the rate to 20 bottles per minute before dividing.
- (d) £82.50 — Find the hourly rate: £52.50 ÷ 7 = £7.50 per hour. For 11 hours: 11 × £7.50 = £82.50. £30 comes from working out the pay for only the extra 4 hours (4 × £7.50), and forgetting to include the original £52.50. £99 comes from misremembering the hourly rate as £9 instead of £7.50, then 11 × £9. £56.50 comes from adding the extra number of hours (4) straight onto the pay in pounds (52.5 + 4), confusing hours with pounds.
- (c) 5/7 — First find the number of children: 84 − 35 = 49. The question compares the adults with the children, not with everyone on the bus, so the denominator is 49 and the numerator is 35, giving 35/49. Both parts divide by 7: 35 ÷ 7 = 5 and 49 ÷ 7 = 7. In its simplest form the fraction is 5/7.
- (b) 19.0 g/cm³ — Density = mass ÷ volume. 342.6 ÷ 18 = 19.0333…, which rounds to 19.0 g/cm³ (1 d.p.). 6166.8 g/cm³ comes from multiplying the mass by the volume instead of dividing (342.6 × 18). 324.6 g/cm³ comes from subtracting the volume from the mass (342.6 − 18) instead of dividing. 0.1 g/cm³ comes from dividing the volume by the mass instead of the mass by the volume (18 ÷ 342.6 = 0.0525…, rounded to 1 d.p.).
- (b) t = 5 and t = 7 (closest, evenly spaced) — To estimate the instantaneous rate of change at t = 6, use the chord centred on t = 6 with the closest readings on either side, t = 5 and t = 7. The gradient of this chord is 15.4 − 17.5 = −2.1, then −2.1 ÷ 2 = −1.05 cm per minute. The interval t = 3 to t = 9 is also centred on t = 6 but is wider: 13.4 − 18.7 = −5.3, then −5.3 ÷ 6 ≈ −0.88 cm per minute — this brings in more of the curve's own change in steepness, so it is a worse estimate of the rate at the single instant t = 6. Using t = 6 and t = 7 only gives 15.4 − 16.6 = −1.2, then −1.2 ÷ 1 = −1.2 cm per minute, but this is not centred on t = 6 — it estimates the rate over (6, 7), not at t = 6 itself. Using t = 0 and t = 6 gives 16.6 − 20.0 = −3.4, then −3.4 ÷ 6 ≈ −0.57 cm per minute, the average rate for the whole first six minutes, not the rate at the instant t = 6. Always choose the chord that brackets the point as closely as possible.
- (a) Yes — the cost per metre is £1.50 each time — Direct proportion holds if the cost per metre is the same every time. Check each pair: 3.00 ÷ 2 = 1.50, 6.00 ÷ 4 = 1.50, and 10.50 ÷ 7 = 1.50. All three give the same rate, £1.50 per metre, so the data does show direct proportion. Saying only that the cost increases as the length increases is not enough on its own — many non-proportional relationships also increase, so this reason does not prove proportion. Misreading 10.50 ÷ 7 as 1.05 by misplacing the decimal point gives a false mismatch that is not actually there. Requiring every length to be a double of another confuses a special case (doubling) with the general test, which is that the rate itself stays constant. The data does show direct proportion, at £1.50 per metre.
- (c) Height rising at 2 m/s at t = 1.5 s — A tangent's gradient on a height-time graph is the instantaneous rate of change of height, in metres per second, so gradient 2 means the ball's height is increasing at 2 m/s at t = 1.5 s. Saying the height 'is 2 m' confuses the gradient, a rate, with the y-value on the graph, which is the ball's height itself. Saying the ball 'travelled 2 m from t = 1 to t = 2' treats the instantaneous gradient at one instant as if it were the total distance risen over a whole one-second interval, which is a different quantity found from two height readings, not from one tangent. Saying the speed 'is 2 m/s²' uses the wrong units — m/s² measures acceleration, the rate of change of speed, not speed itself. Always check that the units quoted match what a height-time graph's gradient can actually give you: metres per second.
- (b) The ratio C : m is not constant because the formula includes a fixed charge of £3 as well as the charge per mile. — For the ratio C : m to stay constant, C must be directly proportional to m, i.e. C = km with no constant term. Because of the +3 fixed charge, C is not directly proportional to m: for example m = 1 gives C = 5.5 (ratio 5.5 : 1), while m = 10 gives C = 28 (ratio 2.8 : 1) — the ratio has changed.
- (c) £338.69 — To increase by 12% each year, multiply by 1.12 twice. £270 × 1.12 × 1.12 = £338.688, which rounds to £338.69 (nearest penny, since the third decimal place is 8). £334.80 comes from treating the two 12% increases as a single flat 24% increase applied once instead of compounding: £270 × 1.24 = £334.80. £302.40 comes from applying the 12% increase only once, for 1 year instead of 2: £270 × 1.12 = £302.40. £338.68 comes from rounding £338.688 down to the nearest penny instead of up.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (d) 125 — Since y is directly proportional to x², y = kx² for a constant k. Using x = 3, y = 45: 45 = k × 9, so k = 45 ÷ 9 = 5. The equation is y = 5x². When x = 5: 5² = 25, and 5 × 25 = 125, so y = 125. Reporting 5² = 25 on its own, without multiplying by the constant k, gives only the square of the new x-value, not the value of y. Treating the proportion as if y were proportional to x itself, rather than to x², gives k = 45 ÷ 3 = 15 and then y = 15 × 5 = 75, which is not this relationship. Squaring the new x-value as though squaring meant doubling it instead gives 5 × 10 = 50, not the true square. When x = 5, y = 125.
- (c) 4 : 5 — Method: a formula of the form y = kx says that for every 1 of x there are k of y, so the ratio y : x is k : 1, which is then written with whole numbers and cancelled. Working: here k = 0.8, so y : x = 0.8 : 1; multiplying both parts by 10 gives 8 : 10, and dividing both parts by their highest common factor 2 gives 4 : 5. Answer: 4 : 5. The distractors: 5 : 4 comes from writing x : y, reversing the order asked for; 8 : 10 has the decimal cleared but the ratio left unsimplified, and the question asks for the simplest form; 8 : 1 comes from multiplying only the left-hand part by 10 and leaving the 1 unchanged, which changes the relationship instead of keeping it.
- (c) 448.00 US dollars — Method: multiply the amount in pounds by the exchange rate. Working: £350 × 1.28 = 448.00 US dollars. Wrong options: 273.44 US dollars comes from dividing by the rate instead of multiplying (350 ÷ 1.28); 351.28 US dollars comes from adding the rate to the amount instead of multiplying; 4,480.00 US dollars comes from a decimal-point slip, using 12.8 instead of 1.28.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
- (c) 7800 kg/m³ — Method: build the conversion factor from the two unit changes separately — one for the mass, one for the volume. Working: 1 kg = 1000 g, so the mass figure is divided by 1000; 1 m = 100 cm, so 1 m³ = 100 × 100 × 100 = 1000000 cm³ and the volume figure is multiplied by 1000000. The density figure is therefore multiplied by 1000000 ÷ 1000 = 1000, giving 7.8 × 1000 = 7800. So the density of the metal is 7800 kg/m³. Distractor 780 kg/m³ comes from multiplying by 100 instead of 1000. Distractor 78000 kg/m³ comes from multiplying by 10000, an extra zero. Distractor 7.8 kg/m³ comes from not converting the units at all.
Build your own mix at the worksheet builder.