Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) 25 — Find the constant multiplier from the given pair: 15 ÷ 6 = 2.5, so y is always 2.5 times x. When x = 10, y = 10 × 2.5 = 25. 19 comes from assuming an additive relationship instead of a multiplicative one — adding the difference 15 − 6 = 9 onto 10. 4 comes from using the multiplier the wrong way round (6 ÷ 15 = 0.4) and then multiplying by 10. 15 comes from simply repeating the given value of y, without applying the multiplier to the new value of x at all.
- (c) 250 miles — Find the distance travelled in 1 hour: 150 ÷ 3 = 50 miles. Multiply by 5 hours: 50 × 5 = 250 miles. Giving 300 miles doubles the original distance (150 × 2 = 300) using a scale factor of 2 instead of the correct 5 ÷ 3. Giving 200 miles adds only one extra hour's distance, 50, instead of the two extra hours actually needed (150 + 50 = 200, rather than 150 + 100). Giving 90 miles divides by the scale factor instead of multiplying (150 × 3 ÷ 5 = 90).
- (d) 24.6 km/h — Average speed = distance ÷ time, with time in hours. 47 minutes = 47 ÷ 60 hours. 19.3 ÷ (47 ÷ 60) = 19.3 ÷ 47 × 60 = 24.638…, which rounds to 24.6 km/h (1 d.p.). 0.4 km/h comes from dividing the distance by 47 and treating the result as km/h directly, without converting the minutes to hours at all. 41.1 km/h comes from converting minutes to hours by dividing by 100 instead of 60 (19.3 ÷ 47 × 100). 0.3 km/h comes from dividing the distance by 60 instead of converting the 47 minutes to hours first.
- (b) 1500 m — Method: multiply the map length by the scale to get the real length in centimetres, then divide by 100 to change centimetres into metres. Working: 3 × 50 000 = 150 000 cm, and 150 000 ÷ 100 = 1500. Answer: 1500 m. The distractors: 15000 m comes from dividing the 150 000 cm by 10 instead of 100; 150 m comes from dividing by 1000, the conversion for kilometres; 50000 m comes from writing the scale itself as the answer and ignoring the 3 cm measured on the map.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (c) 3 : 2 — Method: 'A is k times B' means that if B is taken as 1 part then A is k parts, and a ratio in its simplest form is written with whole numbers that have no common factor. Working: taking B as 1, A is 1.5, so A : B = 1.5 : 1; multiplying both parts by 2 clears the decimal and gives 3 : 2, and 3 and 2 share no factor. Answer: 3 : 2. The distractors: 2 : 3 comes from writing B before A, reversing the order the question asks for; 1.5 : 1 is the right relationship but is not in its simplest form, because a ratio in its simplest form uses whole numbers; 3 : 5 comes from comparing A with the combined length rather than with B, since A : (A + B) = 1.5 : 2.5 = 3 : 5.
- (c) 40 cm — First find the real pitch length using Plan A's scale: 8 × 1000 = 8000 cm. Now find its length on Plan B using Plan B's scale: 8000 ÷ 200 = 40 cm. Assuming both plans use the same scale and leaving the length as 8 cm ignores that Plan B has a different scale. Using the ratio of the two scales upside down, 200 ÷ 1000 = 0.2, then 8 × 0.2 = 1.6, gives 1.6 cm — Plan B is drawn to a larger scale than Plan A, so lengths on it should be bigger, not smaller. Dividing by 2000 instead of 200 gives 4 cm, ten times too small.
- (c) 27 : 64 — For similar solids, the ratio of volumes is the ratio of lengths cubed: 3³ : 4³ = 27 : 64. 3 : 4 comes from using the height ratio itself as the volume ratio, without cubing it at all. 9 : 16 comes from squaring each part instead of cubing (3² : 4²) — squaring is the rule for area, not volume. 27 : 4 comes from cubing only the first part of the ratio (3³ = 27), and leaving the second part uncubed.
- (a) 12 — Speed × time is constant: k = 20 × 15 = 300. At 25 pages per minute, the time is 300 ÷ 25 = 12 minutes. Getting 18.75 comes from treating speed and time as directly proportional and working out 15 × 25 ÷ 20 instead of dividing k by the new speed. Getting 20 comes from adding the increase in speed (25 − 20 = 5) onto the time (15 + 5 = 20). Getting 10 comes from subtracting that same increase in speed from the time (15 − 5 = 10).
- (d) 20 litres — The ratio of concentrate to water is 2 : 5, so water = concentrate × 5 ÷ 2. 8 × 5 ÷ 2 = 20, so Priya needs 20 litres of water. Giving 40 litres multiplies by 5 but forgets to divide by 2 (8 × 5 = 40). Giving 3.2 litres uses the ratio inverted, multiplying by 2 ÷ 5 instead of 5 ÷ 2 (8 × 2 ÷ 5 = 3.2). Giving 11 litres uses additive reasoning instead of multiplicative: it adds the difference between the ratio parts, 5 − 2 = 3, onto the amount of concentrate (8 + 3 = 11), but ratios scale by multiplying, not by adding a fixed amount.
- (c) 4 — The gradient of a tangent at a point equals the instantaneous rate of change of y with respect to x at that point. A straight line's gradient is found from the change in y divided by the change in x between two points on it. Here the tangent passes through (1, 4) and (5, 20), so the change in y is 20 − 4 = 16 and the change in x is 5 − 1 = 4. The gradient is 16 ÷ 4 = 4. Stopping after finding the change in y, 16, without dividing it by the change in x, is not a gradient at all — that rise happened across 4 units of x, not 1. Adding the two changes instead of dividing one by the other gives 16 + 4 = 20, which is not how a gradient is found. Subtracting in the wrong order, (4 − 20) ÷ (5 − 1), gives −16 ÷ 4 = −4, the wrong sign. The instantaneous rate of change of y with respect to x at x = 3 is 4.
- (a) Yes — the cost per metre is £1.50 each time — Direct proportion holds if the cost per metre is the same every time. Check each pair: 3.00 ÷ 2 = 1.50, 6.00 ÷ 4 = 1.50, and 10.50 ÷ 7 = 1.50. All three give the same rate, £1.50 per metre, so the data does show direct proportion. Saying only that the cost increases as the length increases is not enough on its own — many non-proportional relationships also increase, so this reason does not prove proportion. Misreading 10.50 ÷ 7 as 1.05 by misplacing the decimal point gives a false mismatch that is not actually there. Requiring every length to be a double of another confuses a special case (doubling) with the general test, which is that the rate itself stays constant. The data does show direct proportion, at £1.50 per metre.
- (a) 15 cm — Take the square root of each part of the area ratio to find the length ratio: the square root of 4 is 2 and the square root of 25 is 5, giving a length ratio of 2 : 5. Multiply the smaller flag's height by the scale factor 5 ÷ 2 = 2.5: 6 × 2.5 = 15, so the larger flag is 15 cm tall. Giving 37.5 cm uses the area ratio, 25 ÷ 4 = 6.25, directly as the scale factor without square-rooting it first (6 × 6.25 = 37.5). Giving 2.4 cm applies the length ratio the wrong way round, scaling the smaller flag down by 2 ÷ 5 instead of up by 5 ÷ 2 (6 × 0.4 = 2.4). Giving 27 cm adds the difference between the two area-ratio numbers, 25 − 4 = 21, onto the smaller height instead of using it as a scale factor (6 + 21 = 27).
- (a) 3/8, 41%, 0.43 — Method: convert every value to a decimal so they can be compared on the same scale, then order them. Working: 3/8 = 0.375, 41% = 0.41, and 0.43 stays as 0.43, so from smallest to largest the decimals are 0.375, 0.41, 0.43, giving the order 3/8, 41%, 0.43. Answer: 3/8, 41%, 0.43. The order 3/8, 0.43, 41% comes from comparing 0.43 and 41% as raw digits (43 versus 41) without converting 41% into the decimal 0.41 first, wrongly placing 0.43 before 41%. The order 0.43, 41%, 3/8 comes from placing the values in completely reversed order, from largest to smallest instead of smallest to largest. The order 41%, 0.43, 3/8 comes from ordering the values by their TYPE (percentage, then decimal, then fraction) rather than by their actual size.
- (b) £13,860 — Method: apply the first year's percentage decrease, then apply the second year's percentage decrease to the new value. Working: after the first year, the car is worth £17,500 × 0.88. Multiplying this result by 0.90 gives the value at the end of the second year, £13,860. Answer: £13,860. £13,650 comes from adding the two percentages together (12% + 10% = 22%) and applying a single 22% decrease, £17,500 × 0.78 = £13,650, instead of applying the decreases one after the other. £15,750 comes from applying only the second year's 10% decrease to the original price, forgetting the first year's decrease entirely, £17,500 × 0.90 = £15,750. £15,400 comes from applying only the first year's 12% decrease and stopping there, forgetting to apply the second year's decrease at all.
Build your own mix at the worksheet builder.