Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) A falling curve that never touches either axis — Method: inverse proportion means the product of the two quantities is constant, so P = k ÷ Q; as Q grows P shrinks, and P can never reach zero because k divided by a number is never zero. Working: taking k = 12 as an example, the pairs (1, 12), (2, 6), (3, 4), (6, 2) and (12, 1) drop steeply at first and then flatten out, so the graph is a curve that approaches both axes without meeting either of them. Answer: a falling curve that never touches either axis. The distractors: 'a straight line through the origin' is the graph of direct proportion, P = kQ, which is the opposite relationship; 'a straight line with a negative gradient' is the commonest error, reading 'P falls as Q rises' as a straight line, but on such a line P would drop by the same amount for every increase in Q and would cross the horizontal axis into negative values; 'a straight line crossing the vertical axis above zero' is a relationship of the form P = mQ + c, in which P and Q are not proportional at all.
- (d) £30.00 — The gradient is (130 − 70) ÷ (5 − 2) = 60 ÷ 3 = £20 per hour. Using the point (2, 70): the cost for 2 hours at £20 per hour is 20 × 2 = £40, so the call-out fee is 70 − 40 = £30. Taking the C-value of the first point as the fee without subtracting the hourly cost gives £70.00 — but that point already includes 2 hours of the hourly rate. Using the gradient itself as the fee, £20.00, confuses the rate per hour with the fixed charge. Subtracting 20 × 3 = 60 instead of 20 × 2 = 40 (using the wrong h-value) gives 70 − 60 = £10.00.
- (b) 75 g — Method: split the total mass into the number of parts shown by the ratio, then find the mass of tin. Working: the ratio 7:3 has 7 + 3 = 10 parts, so one part is 250 ÷ 10 = 25 g, and the mass of tin is 3 × 25 = 75 g. So the alloy contains 75 g of tin. Distractor 175 g is the mass of copper, not tin. Distractor 125 g comes from splitting the alloy into two equal halves, ignoring the ratio. Distractor 25 g is the value of one part, found correctly but never multiplied by 3.
- (d) 100 — Rearrange L = 0.6L + 40 by collecting the L terms on one side: L − 0.6L = 40, which gives 0.4L = 40, then L = 40 ÷ 0.4 = 100. Subtracting the other way round, 0.6L − L = 40, gives −0.4L = 40, then L = 40 ÷ (−0.4) = −100 — a sign error that flips the answer negative even though a long-run value here must be positive. Ignoring the 0.6L term completely and solving L = 40 directly gives 40, which throws away the recurrence's own multiplier. Dividing 40 by 0.6 instead of by the correct coefficient 0.4 gives 40 ÷ 0.6 ≈ 66.7, a slip that comes from dividing by the coefficient of L on the RIGHT of the original equation rather than by what is left once the L terms are collected on one side. Always collect the L terms first, then divide by whatever coefficient of L remains.
- (b) t = 5 and t = 7 (closest, evenly spaced) — To estimate the instantaneous rate of change at t = 6, use the chord centred on t = 6 with the closest readings on either side, t = 5 and t = 7. The gradient of this chord is 15.4 − 17.5 = −2.1, then −2.1 ÷ 2 = −1.05 cm per minute. The interval t = 3 to t = 9 is also centred on t = 6 but is wider: 13.4 − 18.7 = −5.3, then −5.3 ÷ 6 ≈ −0.88 cm per minute — this brings in more of the curve's own change in steepness, so it is a worse estimate of the rate at the single instant t = 6. Using t = 6 and t = 7 only gives 15.4 − 16.6 = −1.2, then −1.2 ÷ 1 = −1.2 cm per minute, but this is not centred on t = 6 — it estimates the rate over (6, 7), not at t = 6 itself. Using t = 0 and t = 6 gives 16.6 − 20.0 = −3.4, then −3.4 ÷ 6 ≈ −0.57 cm per minute, the average rate for the whole first six minutes, not the rate at the instant t = 6. Always choose the chord that brackets the point as closely as possible.
- (c) 183 mg — Apply the decay, then add the new dose, once for each hour. Hour 1: 0.7 × 200 = 140, then 140 + 50 = 190. Hour 2: 0.7 × 190 = 133, then 133 + 50 = 183, so there is 183 mg after 2 hours. Forgetting the top-up dose and only applying the decay gives 0.7 × 200 = 140, then 0.7 × 140 = 98 — this ignores that a further 50 mg is given every hour. Adding the 50 mg BEFORE the decay is applied, instead of after, gives 0.7 × (200 + 50) = 175, then 0.7 × (175 + 50) = 157.5, which changes how much of the dose is eliminated in the same hour it is given. Multiplying by 0.3, the percentage ELIMINATED, instead of by 0.7, the percentage REMAINING, gives 0.3 × 200 + 50 = 110, then 0.3 × 110 + 50 = 83 — this mixes up the amount that leaves the bloodstream with the amount that stays in it. Always check whether a percentage describes what remains or what is removed before choosing the multiplier.
- (c) 6.00 m — Method: the ratio of height to shadow length is the same for both objects. Working: road sign height ÷ shadow = 3 ÷ 5 = 0.6. Lamppost height = 0.6 × 10 = 6.00 m. Wrong options: 16.67 m comes from inverting the ratio, using shadow ÷ height instead of height ÷ shadow (10 × 5 ÷ 3); 8.00 m comes from adding the difference between the two shadow lengths to the road sign's height instead of scaling (3 + (10 − 5)); 1.50 m comes from multiplying by the ratio of the two shadow lengths the wrong way round (3 × 5 ÷ 10).
- (c) L = d/5 — The scale 1 : 20 means each cm on the drawing represents 20 cm in real life, so the real length in cm is 20d. Converting to metres by dividing by 100: L = 20d/100 = d/5.
- (c) 200 students — Method: find the percentage who have a brother or a sister, taking care that the students with both are not counted twice, then take that percentage from 100% and apply the result to the 400 students. Working: 25% + 40% = 65%, but the 15% with both has been counted in each of those figures, so 65% − 15% = 50% have a brother or a sister; that leaves 100% − 50% = 50%, and 50% of 400 = 200. Answer: 200 students. The distractors: 260 students is 65% of 400, the number with a brother or a sister when the 15% overlap is counted twice; 140 students comes from taking that same uncorrected 65% away from the 400; 300 students comes from subtracting only the 25% with a brother and ignoring the sisters altogether.
- (b) No — rate fell by 3.7 thousand/month — Each tangent gradient is the instantaneous growth rate, in thousand subscribers per month. To compare them, subtract the later rate from the earlier one: 4.8 − 1.1 = 3.7. Since 1.1 is less than 4.8, the growth rate has fallen by 3.7 thousand subscribers per month, so the manager is wrong — the app is growing more slowly at 18 months, not faster. Subtracting the other way round and calling the result a rise, 'rate rose by 3.7 thousand/month', gets the direction backwards: the later gradient is the smaller of the two. Adding the two gradients, 4.8 + 1.1 = 5.9, and calling this a combined rate that shows speeding up, is the wrong operation for comparing two rates. Treating the difference 3.7 as a total number of subscribers lost, rather than a rate in thousands per month, confuses a rate with a count. Always subtract the two rates in a sensible order and keep the units in thousands per month.
- (c) 25 — Find the constant multiplier from the given pair: 15 ÷ 6 = 2.5, so y is always 2.5 times x. When x = 10, y = 10 × 2.5 = 25. 19 comes from assuming an additive relationship instead of a multiplicative one — adding the difference 15 − 6 = 9 onto 10. 4 comes from using the multiplier the wrong way round (6 ÷ 15 = 0.4) and then multiplying by 10. 15 comes from simply repeating the given value of y, without applying the multiplier to the new value of x at all.
- (a) 28.8 km/h — Method: first change metres per second into metres per hour, then change metres into kilometres. Working: 8 × 3600 = 28800 metres per hour, then 28800 ÷ 1000 = 28.8 km/h. So the runner's speed is 28.8 km/h. Distractor 28800 km/h comes from stopping after the first step and forgetting to change metres into kilometres. Distractor 2.22 km/h comes from dividing by 3600 instead of multiplying, then multiplying by 1000. Distractor 2.88 km/h comes from using 360 instead of 3600 seconds in an hour, missing a zero.
- (d) Gradient = acceleration; area = distance travelled. — Method: on a speed–time graph, the gradient of the graph at an instant is the rate of change of speed with time, which is acceleration; the area between the graph and the time-axis over an interval is the total distance covered in that interval, because it accumulates speed × time. Working: gradient = acceleration and area = distance travelled is the correct pairing. Swapping the two quantities completely, gradient = distance travelled and area = acceleration, is the reverse of what each actually measures. Keeping gradient = acceleration correct but then also claiming area = acceleration too is wrong because the area is a different physical quantity, distance, not a second way of finding the same rate. Claiming the gradient itself gives the speed confuses the RATE OF CHANGE of the plotted quantity with the plotted quantity itself — the gradient is how fast the speed is changing, not the speed. On any rate graph, the gradient of the graph is always the RATE at that instant, and the area under the graph is always the TOTAL AMOUNT accumulated — keep straight which of the two questions each one answers.
- (c) 1.25 cm — Method: find the real length using the first map's scale, then use the second map's scale to find its drawn length. Working: real length = 5 × 20 000 = 100 000 cm. On the second map: 100 000 ÷ 80 000 = 1.25 cm. Wrong options: 20 cm comes from inverting the ratio of the two scales (5 × 80 000 ÷ 20 000); 5 cm comes from wrongly assuming the length looks the same on both maps; 12.5 cm comes from dropping a zero from the second scale factor and dividing by 8 000 instead of 80 000 (100 000 ÷ 8 000).
- (c) 21% — Method: an increase of 10% is a multiplier of 1.1, and two successive increases are found by multiplying the multipliers. Working: 1.1 × 1.1 = 1.21, so the rent is 121% of the original, which is an increase of 21%. Answer: 21%. The distractors: 20% comes from adding the two percentages, which ignores that the second 10% is taken of a larger amount; 121% is the multiplier written as the change rather than the change itself; 11% comes from slipping in the multiplication and getting 1.11 instead of 1.21.
Build your own mix at the worksheet builder.