Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) £7617.60 — To decrease by 8% each year, multiply by 0.92 (100% − 8%) twice. £9000 × 0.92 × 0.92 = £7617.60. £7560.00 comes from treating the two 8% decreases as a single flat 16% decrease applied once instead of compounding: £9000 × 0.84 = £7560.00. £8280.00 comes from applying the 8% decrease only once, for 1 year instead of 2: £9000 × 0.92 = £8280.00. £10497.60 comes from multiplying by 1.08 twice, increasing the value instead of decreasing it: £9000 × 1.08 × 1.08 = £10497.60.
- (d) 0.40 m/min — To estimate an instantaneous rate of change at a point without a diagram, use the gradient of a chord joining two points close to it, one on each side. At t = 9: 0.02 × 81 = 1.62, so h = 1.62 + 0.5 = 2.12. At t = 11: 0.02 × 121 = 2.42, so h = 2.42 + 0.5 = 2.92. The change in height is 2.92 − 2.12 = 0.80 and the change in time is 11 − 9 = 2, so the gradient of the chord is 0.80 ÷ 2 = 0.40. Reporting the change in height, 0.80, on its own is not a rate, because it has not been divided by the 2 minutes over which it happened. Using the chord from t = 0 (where h = 0.5) to t = 11 instead gives 2.92 − 0.5 = 2.42, and 2.42 ÷ 11 = 0.22, which is the average gradient over the whole 11 minutes, not the instantaneous rate at t = 10. Substituting t = 10 into the formula gives 0.02 × 100 + 0.5 = 2.50, which is the height of the water at that moment, not the rate at which the height is rising. The estimated instantaneous rate of change at t = 10 is 0.40 m/min.
- (b) 12 — The difference between the parts of the ratio is 5 − 2 = 3 parts, and this is worth 18. Divide to find one part: 18 ÷ 3 = 6. Cats have 2 parts: 2 × 6 = 12. (30 is the number of dogs, using 5 parts instead of 2. 6 is the value of one part — the number of cats is 2 lots of this, not just one. 9 comes from dividing 18 by 2 and stopping there, instead of dividing by the difference in parts, 3, and then multiplying by 2.)
- (d) Profit is decreasing by £10 per £1 rise in price. — The gradient of a tangent gives the instantaneous rate of change of profit with respect to price, found from the change in profit divided by the change in price between two points on the tangent. Here the tangent passes through (12, 540) and (18, 480), so the change in profit is 480 − 540 = −60 and the change in price is 18 − 12 = 6. The gradient is −60 ÷ 6 = −10. A negative gradient means profit is decreasing as price increases, so profit is decreasing at an instantaneous rate of £10 for every £1 rise in price. Subtracting the profits in the wrong order, 540 − 480 = 60, and dividing by the same change in price, 60 ÷ 6 = 10, gives a positive value and the wrong direction — profit is not increasing at £15. Stopping after finding only the change in profit, 480 − 540 = −60, without dividing by the change in price, is not a rate at all. Reading off the change in price, 6, and calling it the rate gives £6 per £1 rise in price, but 6 is only the width of the price interval — it is not a change in profit at all, and profit falls across that interval, so the direction is wrong too. The instantaneous rate of change of profit with respect to price at £15 is a decrease of £10 per £1 rise in price.
- (b) 75 g — Method: split the total mass into the number of parts shown by the ratio, then find the mass of tin. Working: the ratio 7:3 has 7 + 3 = 10 parts, so one part is 250 ÷ 10 = 25 g, and the mass of tin is 3 × 25 = 75 g. So the alloy contains 75 g of tin. Distractor 175 g is the mass of copper, not tin. Distractor 125 g comes from splitting the alloy into two equal halves, ignoring the ratio. Distractor 25 g is the value of one part, found correctly but never multiplied by 3.
- (b) 24 km/h — First convert 45 minutes to hours: 45 ÷ 60 = 0.75 hours. Then divide the distance by the time: 18 ÷ 0.75 = 24 km/h. Reading 45 minutes as 0.45 hours (writing the minutes after the decimal point instead of dividing by 60) gives 18 ÷ 0.45 = 40 km/h. Working out 18 × 0.75 = 13.5 multiplies by the time instead of dividing. Working out 18 ÷ 45 = 0.4 divides by 45 without ever converting the minutes to hours. The cyclist's average speed is 24 km/h.
- (c) 9% — Method: a percentage concentration is the ratio of salt to solution written per 100 g, so scale each concentration to the mass it belongs to, add the two masses of salt, then scale the ratio of salt to mixture back to a denominator of 100. Working: 5:100 = x:400 gives 5 ÷ 100 × 400 = 20 g of salt, and 25:100 = y:100 gives 25 g of salt; the mixture holds 20 + 25 = 45 g of salt in 400 + 100 = 500 g of solution; 45:500 = 9:100. Answer: 9%. The distractors: 15% is the mean of 5% and 25%, which would only be right if the two masses were equal, and here one is four times the other; 21% comes from attaching the concentrations to the wrong masses, working out (400 × 25% + 100 × 5%) ÷ 500; 0.9% comes from working out 45 ÷ 500 = 0.09 and then moving the decimal point one place instead of two when writing the decimal as a percentage.
- (a) 4 — Method: find the constant of proportionality from the pair given, write the equation, then substitute the new value of y and solve. Working: k = 21 ÷ 7 = 3, so y = 3x; putting y = 12 gives 12 = 3x, and x = 12 ÷ 3 = 4. Answer: 4. The distractors: 36 comes from multiplying by the constant instead of dividing by it, 12 × 3, which is the proportion set up upside down; 84 comes from multiplying 12 by the 7 from the first pair, using a value of x as though it were the constant; 9 comes from working out 12 − 3, treating the equation as y = x + 3 rather than y = 3x.
- (b) 80 — Method: the difference between 40% and 25% of the number is 15% of the number, and that difference is 12. Working: 15% of the number is 12, so 1% of the number is 12 ÷ 15 = 0.8, and the number is 0.8 × 100 = 80. Check: 40% of 80 is 32, 25% of 80 is 20, and 32 − 20 = 12. Answer: 80. The distractors: 30 comes from solving 40% of the number = 12; 48 comes from solving 25% of the number = 12; 15 is the percentage difference written as the answer.
- (d) 26.6 — Find the constant multiplier — the mass of each metre of pipe: 12.6 ÷ 4.5 = 2.8, so the mass is always 2.8 times the length. For a length of 9.5 m, the mass is 9.5 × 2.8 = 26.6 kg. 17.6 comes from assuming an additive relationship instead of a multiplicative one — adding the increase in length (9.5 − 4.5 = 5) onto 12.6. 3.4 comes from using the multiplier the wrong way round (4.5 ÷ 12.6, rounded to 1 d.p.), then multiplying by 9.5. 12.6 comes from simply repeating the given mass, without applying the multiplier to the new length.
- (d) 13/10 — First find the selling price: £150 + £45 = £195. Put the selling price over the cost price: 195/150. Divide both numbers by their highest common factor, 15: 195÷15 = 13, 150÷15 = 10, giving 13/10. (10/13 comes from writing the prices the wrong way round. 3/10 is just the profit written as a fraction of the cost price, 45/150, not the selling price. 13/23 comes from comparing the selling price to the combined total of the cost price and the selling price, 195/345.)
- (d) £82.50 — Find the hourly rate: £52.50 ÷ 7 = £7.50 per hour. For 11 hours: 11 × £7.50 = £82.50. £30 comes from working out the pay for only the extra 4 hours (4 × £7.50), and forgetting to include the original £52.50. £99 comes from misremembering the hourly rate as £9 instead of £7.50, then 11 × £9. £56.50 comes from adding the extra number of hours (4) straight onto the pay in pounds (52.5 + 4), confusing hours with pounds.
- (a) 22p — First convert the hourly rate to pence: £13.20 = 1320p. Then convert from per hour to per minute by dividing by 60, since there are 60 minutes in an hour: 1320 ÷ 60 = 22p per minute. Working out 1320 × 60 = 79200p multiplies by 60 instead of dividing, going the wrong way between per hour and per minute. Working out 13.20 × 10 = 132p converts pounds to pence using the wrong power of ten, and dividing that by 60 carries the error through to give 2.2p. Working out 13.20 × 100 = 1320p converts the currency correctly but stops there, leaving the rate as pence per hour rather than completing the second conversion to pence per minute. The rate of pay is 22p per minute.
- (d) The 750 g box, at 36p per 100 g — Work out the cost per 100 g of each box. 750 g box: 270p ÷ 7.5 = 36p per 100 g. 500 g box: 195p ÷ 5 = 39p per 100 g. The lower cost per 100 g is the better value, so the 750 g box at 36p per 100 g is the answer. Choosing the 500 g box at 39p per 100 g gets the maths right but picks the higher unit price, not realising a smaller cost per 100 g is the better deal. Choosing the 500 g box because £1.95 is lower than £2.70 compares the total prices without allowing for the different pack sizes at all. Working out 270 ÷ 5 = 54p divides the 750 g box's price by the wrong number of hundred-grams (the 500 g box's), giving a rate that belongs to neither box. The 750 g box, at 36p per 100 g, is the better value.
- (c) 7800 kg/m³ — Method: build the conversion factor from the two unit changes separately — one for the mass, one for the volume. Working: 1 kg = 1000 g, so the mass figure is divided by 1000; 1 m = 100 cm, so 1 m³ = 100 × 100 × 100 = 1000000 cm³ and the volume figure is multiplied by 1000000. The density figure is therefore multiplied by 1000000 ÷ 1000 = 1000, giving 7.8 × 1000 = 7800. So the density of the metal is 7800 kg/m³. Distractor 780 kg/m³ comes from multiplying by 100 instead of 1000. Distractor 78000 kg/m³ comes from multiplying by 10000, an extra zero. Distractor 7.8 kg/m³ comes from not converting the units at all.
Build your own mix at the worksheet builder.