Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) 1.2 — Add the parts of the ratio: 6 + 1 = 7. Divide the total amount by the number of parts: 8.4 ÷ 7 = 1.2 litres, which is the value of one part and also the amount of syrup, since syrup is 1 part. (7.2 litres is the amount of water, using 6 parts instead of 1. 1.4 comes from dividing 8.4 by 6 — the water's part of the ratio — instead of dividing by the total number of parts, 7. 0.84 comes from dividing 8.4 by 10 instead of by 7.)
- (d) 90 cm — Method: scale each dimension by the scale factor, then find the perimeter. Working: model height = 240 ÷ 8 = 30 cm; model width = 120 ÷ 8 = 15 cm. Perimeter = 2 × (30 + 15) = 90 cm. Wrong options: 11.25 cm comes from squaring the scale factor as if finding an area (720 ÷ 64); 510 cm comes from scaling only one dimension and leaving the other at full size; 720 cm comes from finding the real perimeter (2 × (240 + 120)) but forgetting to scale it down at all.
- (c) 2.5 — x : y = 2 : 5 means that for every matching pair of values, y ÷ x = 5 ÷ 2 = 2.5. So y = 2.5x, and comparing with y = kx gives k = 2.5. Dividing the other way round, 2 ÷ 5 = 0.4, gives x in terms of y — that is the constant for x = 0.4y, not for y = kx. Taking the y-part of the ratio on its own, 5, reads one number off the ratio instead of dividing the y-part by the x-part; 5 would only be right if the x-part were 1. Subtracting the two parts, 5 − 2 = 3, treats the ratio as a difference, but a ratio compares two quantities by multiplication, not by subtraction. The constant is k = 2.5.
- (c) 1.2 cm/s — To estimate an instantaneous rate of change at a point from a table of readings, use the chord that spans the point symmetrically — equal steps either side — because the over-estimate on one side and the under-estimate on the other largely cancel. Here that is the chord from t = 10 to t = 30. The change in depth is 56 − 32 = 24 and the change in time is 30 − 10 = 20, so the estimate is 24 ÷ 20 = 1.2 cm/s. The one-sided chord from t = 20 to t = 30 gives (56 − 45) ÷ (30 − 20) = 11 ÷ 10 = 1.1 cm/s, which estimates the rate somewhere between t = 20 and t = 30 rather than at t = 20 itself. Dividing the 20-second change in depth by the 10-second gap between consecutive readings gives 24 ÷ 10 = 2.4, mixing the change from one interval with the time from another. Reporting the change in depth, 24, on its own is not a rate at all, because it has not been divided by a time. The best estimate of the instantaneous rate of change of depth at t = 20 is 1.2 cm/s.
- (c) 1 : 4 — Convert to the same unit: 1.2 litres = 1200 ml, since 1 litre = 1000 ml. This gives the ratio 300 : 1200. Divide both parts by their highest common factor, 300, to get 1 : 4. Giving 3 : 12 divides by 100 only, which is a common factor but not the highest one. Giving 1 : 1.2 has not converted 1.2 litres into millilitres, so the two parts are not in the same unit. Giving 4 : 1 swaps the order, comparing water to concentrate instead of concentrate to water.
- (b) 7.2 m — Multiply the model wingspan by the scale factor: 15 × 48 = 720. This is in centimetres, and 720 cm = 7.2 m, since 1 m = 100 cm. Giving 0.31 m divides by the scale factor instead of multiplying (15 ÷ 48 ≈ 0.31), scaling the model down rather than the real aircraft up. Giving 72 m converts centimetres to metres by dividing by 10 instead of 100. Giving 0.72 m converts by dividing by 1000 instead of 100.
- (c) 5 : 9 — Write the ratio mass : cost = 3 : 5.4. Multiply both parts by 10 to clear the decimal: 30 : 54. Both numbers share a factor of 6, so 30 ÷ 6 = 5 and 54 ÷ 6 = 9, giving 5 : 9. 3 : 5 comes from ignoring the decimal point and treating £5.40 as £5. 9 : 5 comes from writing the ratio the wrong way round, cost to mass instead of mass to cost. 1 : 18 comes from multiplying only the cost by 10 instead of both parts, giving 3 : 54, and then cancelling that correctly to 1 : 18 — the cancelling is fine, but the ratio being cancelled is not the right one.
- (a) The gradient is 3; the candidate's method is right. — The gradient of a tangent, like any straight line, is the change in y divided by the change in x between two points on it. Here the tangent passes through (1, 2) and (5, 14), so the change in y is 14 − 2 = 12 and the change in x is 5 − 1 = 4. The gradient is 12 ÷ 4 = 3, so the candidate's calculation is correct. Subtracting in the wrong order, (2 − 14) ÷ (5 − 1), gives −12 ÷ 4 = −3, the wrong sign. Adding the two changes instead of dividing them, 12 + 4 = 16, does not find a gradient at all. Dividing the change in x by the change in y instead of the other way round, 4 ÷ 12 = 1/3, inverts the calculation completely. Before accepting or rejecting a claimed gradient, always redo the calculation yourself in the same order — change in y over change in x — rather than trusting the arithmetic as given.
- (c) 500 g — Method: a concentration of 10% is the ratio 10:100, and the salt and the solution in the beaker must be in that same ratio, so write 10:100 = 50:m and scale. Working: 50 ÷ 10 = 5, so the salt is 5 times the 10 of the ratio; the solution must be 5 times the 100 of the ratio, giving 5 × 100 = 500 g. Answer: 500 g. The distractors: 5 g comes from working out 10% of 50 g, which treats the 50 g as the whole solution when it is the salt inside it; 450 g comes from scaling correctly and then taking the 50 g of salt away, which gives the mass of water rather than the mass of the whole solution; 5000 g comes from dividing by 0.01 instead of 0.1, that is from writing 10% as 0.01.
- (d) The 750 g box, at 36p per 100 g — Work out the cost per 100 g of each box. 750 g box: 270p ÷ 7.5 = 36p per 100 g. 500 g box: 195p ÷ 5 = 39p per 100 g. The lower cost per 100 g is the better value, so the 750 g box at 36p per 100 g is the answer. Choosing the 500 g box at 39p per 100 g gets the maths right but picks the higher unit price, not realising a smaller cost per 100 g is the better deal. Choosing the 500 g box because £1.95 is lower than £2.70 compares the total prices without allowing for the different pack sizes at all. Working out 270 ÷ 5 = 54p divides the 750 g box's price by the wrong number of hundred-grams (the 500 g box's), giving a rate that belongs to neither box. The 750 g box, at 36p per 100 g, is the better value.
- (b) 20 — The gradient is the change in p divided by the change in t: (90 − 30) ÷ (5 − 2) = 60 ÷ 3 = 20. Choosing 0.05 comes from dividing the change in t by the change in p, the wrong way round (3 ÷ 60). Choosing −20 comes from subtracting the coordinates in the wrong order for one part of the calculation, for example (30 − 90) ÷ (5 − 2), giving a negative value. Choosing 18 comes from dividing the second p-coordinate by the second t-coordinate directly (90 ÷ 5) instead of using the change between the two points.
- (b) 10000 cm² — Method: an area conversion factor is the square of the length conversion factor, because both sides of the square are scaled. Working: a square metre is a square of side 100 cm, so its area is 100 × 100 = 10000 cm². Answer: 10000 cm². The distractors: 100 cm² comes from using the length factor without squaring it; 200 cm² comes from doubling the length factor instead of squaring it; 1000000 cm² comes from cubing the factor, which is the conversion for a volume, not an area.
- (c) 5 hours — Method: measure the job in decorator-hours, which is in the same ratio as the number of rooms, then share the decorator-hours between the decorators available. Working: 5 decorators × 6 hours = 30 decorator-hours for 3 rooms, so one room takes 30 ÷ 3 = 10 decorator-hours; 5 rooms take 5 × 10 = 50 decorator-hours; shared between 10 decorators that is 50 ÷ 10 = 5 hours. Answer: 5 hours. The distractors: 3 hours comes from halving the 6 hours because the number of decorators doubles, while forgetting that there are also more rooms to paint; 10 hours comes from scaling the 6 hours up for the rooms only, 6 × 5 ÷ 3, and leaving the workforce at 5 decorators; 6 hours comes from assuming that doubling the decorators and increasing the rooms cancel each other out, which they do not, because the rooms rise by a factor of 5/3 and the workforce by a factor of 2.
- (c) £310 — Gradient = (210 − 130) ÷ (7 − 3) = 80 ÷ 4 = 20, so the monthly rate is £20. Using C = 20m + c with the point (3, 130): 130 = 60 + c, so c = 70. After 12 months: C = 20 × 12 + 70 = 240 + 70 = £310.
- (d) 10 — First find the height at each end of the chord. At t = 1, h = 30 × 1 − 5 × 1² = 30 − 5 = 25. At t = 3, h = 30 × 3 − 5 × 3² = 90 − 45 = 45. The gradient of the chord estimates the instantaneous rate at the midpoint t = 2: 45 − 25 = 20, then 20 ÷ (3 − 1) = 20 ÷ 2 = 10 m/s. Finding the change in height but forgetting to divide by the change in time gives 20, which is a distance, not a rate. Averaging the two heights instead of finding the difference gives (25 + 45) ÷ 2 = 70 ÷ 2 = 35. Subtracting in the wrong order, 25 − 45 = −20, then −20 ÷ 2 = −10, gives the correct size with the sign flipped — the rocket is rising, not falling, at t = 2 seconds, so a negative rate cannot be right here.
Build your own mix at the worksheet builder.